Loading...
HomeMy WebLinkAbout87-06RESOLUTION NO. 87-6 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH ADOPTING RATE SCHEDULES 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22. 23i 24 25 26 27 28 WHEREAS, the City Manager has made a report relative to the Electric Rate Schedules within the City of Ukiah; and WHEREAS, the City Council has held a public hearing regarding the proposed rate schedules; and WHEREAS, revised rate schedules have been proposed. NOW, THEREFORE, BE IT RESOLVED that the Electric Rate Schedules attached hereto and made a part hereof are hereby adopted to be effective August 1, 1986. PASSED AND ADOPTED this 16th, day of July, 1986, by the following roll call vote: AYES: Councilmembers Schneiter, Shoemaker, Hickey, and Mayor Henderson NOES: None ABSENT: Councilmember Kier ATTEST: CITY OF UKIAH NOTICE TO CONSIDER AN OF DOMESTIC ) F PUBL I C HEARING ADJUSTMENT OF BASE AND FUEL COST kND COMMERCIAL ELECTRICAL RATES NOTICE IS HEREBY GIVEN THAT THE CITY COUNCIL OF THE CITY OF UKIAH will hold a public hearing on July 16, 1986, at 7:00 p.m., or as soon thereafter as may be heard, in the Ukiah Unified School District Board Room, 445 S. Dora Street, to consider a rate adjustment of Residential and Commercial Electrical Rates. The fuel cost and base rate are being adjusted with the end result of an approximate 5% decrease to residential users. The adjustment of fuel and base rate in the Commercial rates will decrease customers on the 1602 Schedule and the 1602-DM Schedule approximately 5%. Copies of the proposed rates are published herein. Effective date is proposed to begin August 1, 1986. A copy of the City Manager's report and recommendation is on file with the City Clerk and is available for review by interested persons. PUBLISH: July 6, 1986 Effective August 1, 1986 RATE COb~ARISON TYPICAL ELECTRIC BILL OF 500 KWH RESIDENTIAL (1600EW) Increase (Decrease) Cost Dollars Percent January 1, 1982 March 1, 1982 May 1, 1982 September 1, 1982 January 1, 1983 June 15, 1983 August 17, 1983 February 1, 1984 September 1, 1984 March 1, 1985 August 1, 1985 February 1, 1986 August 1, 1986 $34.60 - - 33.86 (.74) (2.1) 28.20 (5.66) (16.7) 27.22 (.98) (3.5) 26.24 (.98) (3.6) 24.70 (1.54) (5.9) 24.89 .19 .8 25.63 .74 3.0 29.50 3.87 15.0 31.04 1.54 5.2 33.22 2.18 7.0 33.76 .54 1.6 31.82 (1.94) (5.8) TOTAL (2.78) (5.0) Type of Rate Ad~. FCA FCA FCA B & FCA FCA FCA B & FCA FCA FCA FCA B & FCA B & FCA B = Base Rate Adjustment -FCA = Fuel Cost Adjustment CITY OF UKIAH Rate Comparison City Present vs. Effective AUGUST 1, Proposed 1986 Schedules June 27, 1986 Schedule Kwh City City Present Proposed Residential Rate Schedule 1600 1600-BS 250 $16.99 1600-BW 250 $16.99 1600-EW 500 $33.76 1600-ES 1,000 $82.76 1600-EW 2,000 $161.52 1600-EW 5,000 $490.72 Diff. Diff. Increase Increase (Decrease) (Decrease) $15.91 ($1.08) -6.3% $15.91 ($1.08) -6.3% $31.82 ($1.94) -5.8% $81.77 ($0.99) -1.2% $143.64 ($17.88) -11.1% $471.75 ($18.97) -3.9% General Service Schedul Proposed Rate Service Charge $0.00 Effective Rate Energy $0.09278 1602 500 $48.88 1602 1,000 $97.76 1602 3,000 $293.28 1602 5,000 $488.80 1602 10,000 $977.60 e 1602 $46.39 ($2.49) -5.1% $92.78 ($4.98) -5.1% $278.34 ($14.94) -5.1% $463.90 ($24.90) -5.1% $927.80 ($49.80) -5.1% General Service Proposed Rate Demand Charge Effective Rate Energy Kwh KW 10,000 50 20,000 100 50,000 250 Demand Metered $1.70 0.079880 1602-DM $928.40 $1,856.80 $4,642.00 $883.80 $1,767.60 $4,419.00 ($44.60) -4.8% ($89.20) -4.8% ($223.00) -4.8% Effective August 1, 1986 CITY OF UKIAH Schedule 1600 Electric Rate DOMESTIC SERVICE APPLICABILITY This is applicable to domestic lighting, heating, cooking and single phase domestic power service in single family dwellings and in flats and apartments separately metered by the City. TERRITORY Within the corporate limits of the City of Ukiah. Per Meter Per Month Fuel Base Adjust- Effective Rate ment Rates RATES: ENERGY CHARGE Tier I Life Line Quantities, per kwh Tier II Quantities, per kwh Tier III Excess, per kwh .04993 .01371 .06364 .04993 .03359 .08352 .04993 .05944 .10937 Fuel cost adjustment: An adjustment as shown above is included in each bill for service. This will be adjusted per CPUC decision relative to fuel costs. Minimum Charge: $2.00 per meter per month. Lifeline Usage, Tier I and Tier II Quantities: The following quantities of electricity are to be billed at the rates for Lifeline and Tier II use: LIFELINE AND TIER II OUANTITIES (KWH PER MONTH) Basic Quantities Ail Electric Quantities Summer Winter Summer Winter Tier I Tier II Tier I Tier II Tier I Tier II Tier I Tier II 310 210 330 210 400 360 1190 800 Summer and Winter Tier 1 (Lifeline) and Tier II (Quantities) will normally be billed without seasonal proration for the billing periods. · Effective August 1, 1986 CITY OF UKIAH FORMULA METHOD OF COMPUTING ELECTRIC CHARGES Schedule KWH RAMGE Rate/KWH '-1600-BS Billing Code E-1 Basic Summer 0 - 310 .06364 + 311 - 520 .08352 521 and Over .10937 Flat Sum 0.00 6.16 19.60 1600-BW Billing Code E-2 Basic Winter 0 - 330 .06364 + 331 - 540 .08352 541 and Over .10937 0.00 6.56 20.52 1600-ES Billing Code E-3 Ail Electric Summer 0 - 400 .06364 + 401 - 760 .08352 761 and Over .10937 0.00 7.95 27.60 1600-EW Billing Code E-4 Ail Electric Winter 0 - 1190 .06364 + 1191 - 1990 .08352 1991 and Over .10937 0.00 23.66 75.10 State Surcharge not included in figures. Effective AugUst 1, 1986 CITY OF UKIAH Schedule 1602 Electric Rates GENERAL SERVICE APPLICABILITY ~This schedule is applicable to general commercial lighting and to all single phase or polyphase alternating current service, provided that all polyphase service to any customer on the same premises shall be supplied through one meter. Service to each of two or more separate areas, but not in the same building, and which do not overlap within the same premises may be individually metered; also shall apply where one meter serves a combination commercial and residential establishment combined on polyphase. At the customer's option, single phase and polyphase service may be combined under this schedule. TERRITORY Within the corporate limits of the City of Ukiah. RATE Single Phase Service: Per Meter Per Month Base Adjust- Effective Rates ments Rates Energy Charge (to be added to Service Charge) Ail kwh, per kwh .05664 .03614 .09278 Polyphase Service: The single phase rate plus $1.50 per meter per month. Minimum Charge: $3.25 per month, but not less than $1.25 per month per kva of connected welder load and per horsepower of polyphase connected load. Fuel Adjustment: .03614 A fuel cost adjustment will be added to the energy charge in each bill for service. This will be adjusted per CPUC decision relative to fuel costs. Effective August 1, 1986 CITY OF UKIAH Schedule 1602-DM Electric Rates GENERAL SERVICE DEMAND METERED APPLICABILITY This ,~schedule is applicable to alternating current lighting, and, at the Customer's option, to alternating current for heating, cooking and/or power (either single phase or polyphase) alone or combined with lighting, provided that in the case of polyphase power service, all alternating current used by the customer of the same premises is combined as provided in Special Condition (b) below; and provided further the entire load is measured through one meter. TERRITORY Within the corporate limits of the City of Ukiah. RATE Per Meter Per Month Demand Charge per kilowatt of maximum demand $ 1.70 Fuel Base Adjust- Effective Rate ment Rate Energy Charge (In addition to Demand Charge) Ail kwh, per kwh .04462 .03526 .07988 Fuel Adjustment: .03526 A fuel cost adjustment will be added to the energy and demand charge in each bill for service. This will be adjusted per CPUC decision relative to fuel costs. SPECIAL CONDITIONS a) Maximum Demand: The maximum demand in any month will be the maximum average power taken during any fifteen minute interval in a month. However, when the recorded monthly maximum demand has exceeded 400 kw for three consecutive months a thirty minute interval will be used thereafter until the maximum average has fallen below 300 kw for twelve consecutive months, provided that in the cases where the use of energy is intermittent or subject to violent fluctuations, a five minute interval may be used. A thermal type of demand meter which does not reset after a definite time interval may be used. Effective August 1, 1986 CITY OF UKIAH Schedule 1608-1,2,3 Electric Rates OUTDOOR LIGHTING SCHEDULE APPLICABILITY: ;Applicable for service to outdoor lighting installations on private property for mercury vapor or high pressure sodium lamps, where the City usually owns and maintains the entire system. Burning Schedule ...................................................... Ail Night Lamp Rating Rate Per Lamp Per Month Mercury Vapor Lamps Schedule 1 2 3 Lamp Watts Average Initial Lumens Kwh/Month 175 8,000 68 - $ 9.50 $ 7.10 250 12,000 102 12.25 10.50 8.25 400 23,000 154 $15.15 12.70 12.21 1,000 60,000 375 20.35 17.70 15.40 High Pressure Sodium Lamps Schedule I 2 3 Average Initial Lamp Watts Lumens Kwh/Month 150 15,000 68 - $ 9.50 $ 7.10 250 27,500 103 $12.25 10.50 8.25 Other fixtures not specifically listed above will be adjusted proportionately. Fuel Adjustment: .03614 A charge for fuel will be added to the above charges in each bill for service. This will be adjusted for CPUC decisions relative to fuel costs. Schedule 1. Steel Standards-City Owned and Maintained: Where the customer installs the base, conduit and wire to City specification, the City will provide and install the standard maintain the entire system.-