Loading...
HomeMy WebLinkAbout88-40 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 88-40 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH APPROVING FINAL MAP FOR PHASE I, REDWOOD BUSINESS PARK OF UKIAH WHEREAS, on April 13, 1988, the Planning Commission considered and recommended approval of the Final Map for Phase I of the Redwood Business Park of Ukiah with conditions consistent with the adopted Tentative Map, and WHEREAS, The Director of Public Works reports that the City of Ukiah has sufficient wastewater treatment capacity to handle wastewater from this project without violation of the Water Quality Control Board standards. NOW, THEREFORE, IT IS HEREBY RESOLVED that the Final Map (Exhibit A) for the aforesaid project is approved subject to the conditions noted in this Resolution and on the map and conditions of Resolution No. 86-41 approving the tentative map, and the Mayor and City Clerk are authorized to sign said maps at such time as Subdivider provides Covenants, Conditions and Restrictions to fulfill Condition 9 of this Resolution which are approved in writing by the City Attorney, signs and fulfills all the requirements of an Agreement for Subdivision Improvements to be entered into between the Subdivider and the City of Ukiah"'~nd upon compliance with conditions of approval of Use Permit No. 81-39. The Mayor and City Clerk are hereby authorized to sign said Agreement for Subdivision Improvements for the Redwood Business Park Subdivision. Conditions for development include: 1. Ail utilities, sewer, water, electric and drainage be installed with each phase and that all utilities be undergrounded at developer's expense. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 2. Full street improvements on interior or abutting streets be constructed. 3. Street improvements on Talmage Road shall include traffic channelization. 4. Developer contribute 50% to Talmage-Airport Park Boulevard signalization fund with the condition that signalization occur prior to development of the last property or money refunded. Payment to be pro-rated over the development of the project based on the formula that meets the approval of the City Council. 5. Street pavement sections shall be Cal Trans design based on soil R values with Traffic Index to be determined by City Engineer. 6. Drainage be provided into and through subdivision from Railroad right-of-way. 7. Method of drainage into freeway ditch shall be additionally approved by Cal Trans. 8. Railroad crossing to be approved by Railroad. 9. Property Owners Association will be formed and provide landscaping maintenance for street landscaping. The Covenants, Conditions and Restrictions be properly referenced in deeds conveying lots in the subdivision. I0. Sidewalk and bike lane installation (so long as required by Use Permit No. 81-39) except along Talmage Road, may be delayed until the development of each parcel. 11. Extension of utility mains into the property shall be completed with the first phase. 12. There be a minimum of 2,000 gallons per minute fire flow to the approval of the Ukiah Fire Marshal. - 2 - 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 13. On-site fire hydrant, Rich #76 or equal, to be placed 300 feet apart to the approval of the Fire Marshal. 14. A landscaping/drainage plan along the freeway be approved by the City Engineer, Director of Planning and Cal Trans. 15. Ail Federal, State or local statutes or regulations governing and controlling the use and disposal of toxic material be applied. PASSED AND ~OPTED this 20th day of April, I988 by the following roll call vote: AYES: Councilmembers Shoemaker, Myers, and Mayor Henderson NOES: None ABSENT: Councilmembers Hickey and Schneiter ATTEST: -3 -