RESOLUTION NO. 88-57
RESOLUTION OF THE CITY OF UKIAH CITY COUNCIL
APPROVING USE PERMIT NO. 88-88, HARRIS & GROSS
WHEREAS, the property of Use Permit No. 88-88 is zoned "PD", Planned
Development, and
WHEREAS, the "PD", Planned Development zone requires a use permit to
be reviewed and approved by the Planning Commission and the City Council
prior to any development within that zone, and
WHEREAS, on May 25, 1988 the Planning Commission approved the use
permit subject to 16 conditions, and
WHEREAS, an additional condition(s) was(were) determined necessary
for this project by the City Council, and
WHEREAS, the Negative Declaration for the subject property was found
adequate and complete by the Planning Commission on May 25, 1988 and by
the City Council on June 15, 1988,
NOW THEREFORE BE IT RESOLVED, Use Permit No. 88-88 is approved
subject to the following conditions:
I. Standard Conditions 1-9.
2. Full width street improvements for Orchard Avenue (curb, gutter,
sidewalk, street paving, drainage systems, street trees, and
utilities) abutting the subject parcel shall be completed to the
approval of the City Engineer.
3. Sidewalk be completed along the Marlene frontage.
4. Plans for all street improvements to be prepared by a registered
Civil Engineer and submitted for the approval of the City
Engineer.
5. Ail on-site paving be a minimum of 2" of asphalt concrete with a
6" aggregate base.
e
On-site drainage be taken into exisiting storm drains or under
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
22
23
24
25
26
27
Ye
8.
9.
10.
11.
12.
13.
14.
15.
16.
the sidewalk to face of curb to the approval of the City
Engineer.
Planter strips with street trees are required across both
Marlene and Orchard property frontages to the approval of the
City Engineer.
Driveway curb cut widths shall be as approved by the City
Engineer.
Inspection fees shall be paid prior to start of any construction
within public right-of-way.
Ail work within the City right-of-way shall be performed by a
properly licensed and insured Contractor with a current City of
Uktah Business License. Contractor must submit a copy of a
current Workman's Compensation Certificate.
An encroachment permit from the Public Works Department is
required to perform all work within the street right-of-way.
Any outdoor trash collections facilities be aesthetically
screened from view.
Any roof mounted air conditioning apparatus be aesthetically
screened from view.
Landscaping plan be submitted to the Director of Planning for
approval prior to placement.
Ail landscaping be watered by an automated irrigation system and
maintained in a neat, weed free manner.
Ail conditions of approval be completed prior to use and
occupancy.
28
1
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
17.
Developer to participate in the Orchard Avenue/Gobbi Street
traffic signalization fund by paying $3,571 as his percentage
share (based on $6,100 per acre).
PASSED AND ADOPTED this
following roll call vote:
15 day of 0une 1988, by the
AYES:Councilmember Shoemaker,Hickey,Schneiter,Mayor Henderson
NOES:Councilmember Wattenburger
ABSENT:None
ATTEST
//
,-.
~
CITY C~RK