Loading...
HomeMy WebLinkAbout88-57 1 2 3 4 5 6 7 8 9 10 11 19~ 13 14 15 16 17 18 19 20 21 2:2 23 24 25 26 27 28 RESOLUTION NO. 88-57 RESOLUTION OF THE CITY OF UKIAH CITY COUNCIL APPROVING USE PERMIT NO. 88-88, HARRIS & GROSS WHEREAS, the property of Use Permit No. 88-88 is zoned "PD", Planned Development, and WHEREAS, the "PD", Planned Development zone requires a use permit to be reviewed and approved by the Planning Commission and the City Council prior to any development within that zone, and WHEREAS, on May 25, 1988 the Planning Commission approved the use permit subject to 16 conditions, and WHEREAS, an additional condition(s) was(were) determined necessary for this project by the City Council, and WHEREAS, the Negative Declaration for the subject property was found adequate and complete by the Planning Commission on May 25, 1988 and by the City Council on June 15, 1988, NOW THEREFORE BE IT RESOLVED, Use Permit No. 88-88 is approved subject to the following conditions: I. Standard Conditions 1-9. 2. Full width street improvements for Orchard Avenue (curb, gutter, sidewalk, street paving, drainage systems, street trees, and utilities) abutting the subject parcel shall be completed to the approval of the City Engineer. 3. Sidewalk be completed along the Marlene frontage. 4. Plans for all street improvements to be prepared by a registered Civil Engineer and submitted for the approval of the City Engineer. 5. Ail on-site paving be a minimum of 2" of asphalt concrete with a 6" aggregate base. e On-site drainage be taken into exisiting storm drains or under 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 Ye 8. 9. 10. 11. 12. 13. 14. 15. 16. the sidewalk to face of curb to the approval of the City Engineer. Planter strips with street trees are required across both Marlene and Orchard property frontages to the approval of the City Engineer. Driveway curb cut widths shall be as approved by the City Engineer. Inspection fees shall be paid prior to start of any construction within public right-of-way. Ail work within the City right-of-way shall be performed by a properly licensed and insured Contractor with a current City of Uktah Business License. Contractor must submit a copy of a current Workman's Compensation Certificate. An encroachment permit from the Public Works Department is required to perform all work within the street right-of-way. Any outdoor trash collections facilities be aesthetically screened from view. Any roof mounted air conditioning apparatus be aesthetically screened from view. Landscaping plan be submitted to the Director of Planning for approval prior to placement. Ail landscaping be watered by an automated irrigation system and maintained in a neat, weed free manner. Ail conditions of approval be completed prior to use and occupancy. 28 1 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 17. Developer to participate in the Orchard Avenue/Gobbi Street traffic signalization fund by paying $3,571 as his percentage share (based on $6,100 per acre). PASSED AND ADOPTED this following roll call vote: 15 day of 0une 1988, by the AYES:Councilmember Shoemaker,Hickey,Schneiter,Mayor Henderson NOES:Councilmember Wattenburger ABSENT:None ATTEST // ,-. ~ CITY C~RK