HomeMy WebLinkAbout90-29 1
4
5
6
7
8
9
10
11
19.
13
14
15
16
17
18
19
2O
21
23
24
25
:/6
27
28
RESOLUTION NO. 90-29
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
UKIAH APPROVING FINAL MAP FOR SIERRA SUNSET VILLAGE
WHEREAS, on November 8, 1989, the Planning Commission considered and
recommended approval of the Final Map for Sierra Sunset Village, with
conditions consistent with the adopted Tentative Map, and
WHEREAS, the Director of Public Works reports that the City of Ukiah
has sufficient wastewater treatment capacity to handle wastewater from
this project without violation of the Water Quality Control Board
standards.
NOW, THEREFORE, IT IS HEREBY RESOLVED that the Final Map (Exhibit A)
for the aforesaid project is approved subject to the conditions noted in
this Resolution and on the map, conditions of Resolution No. 89-29
approving the Sierra Sunset Use Permit, and conditions of Resolution
No. 89-30 approving Tentative Subdivision Map No. 89-47, and the Mayor and
City Clerk are authorized to sign said map at such time as Subdivider
signs and fulfills all the requirements of an Agreement for Subdivision
Improvements to be entered into between the Subdivider and the City of
Ukiah. The Mayor and City Clerk are hereby authorized to sign said
Agreement for Subdivision Improvements for Sierra Sunset Village.
Conditions for development include:
1. In-lieu park fees in the amount of $8,633.64 be paid prior to map
recordation (Article 21, Sections 8400-8410).
2. The developer shall dedicate with each building permit an easement on
each property for the purpose of assuring that each parcel or unit in
this subdivision shall have solar access for reasonably placed solar
energy systems. Ail applicable building codes relating to energy
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
22
23
24
25
26
27
28
conservation and the appropriate provisions of the California Solar
Rights Act of 1979 shall be complied with by the developer.
3. Hours of construction are limited to 7:00 a.m. to dark, Monday
through Saturday.
4. Dust control measures be instituted during construction.
5. Single family detached units shall meet the standard R-1 site
requirements including 20-foot setbacks to garages, five-foot side
yard setbacks, and 15-foot rear yard setbacks.
6. A fee prorated on a per unit basis for 25% of the cost of
signalization at North Bush Street and Low Gap Road shall be paid
with each building permit within this subdivision.
7. Developer shall purchase, install, and maintain for one year, City
specified street trees to be planted in the planter strip between the
sidewalk and the curb at locations determined by the City throughout
the subdivision according to a street tree program approved by staff.
8. A copy of the plot plan be provided to potential purchasers
indicating setback requirements and applicable restrictions in
accordance with current disclosure laws.
9. Landscaped island in east cul-de-sac to be provided with automatic
irrigation system from fire hydrant water system.
PASSED AND ADOPTED this 6th day of December , 1989, by
the following roll call vote:
AYES: Councilmember Shoemaker, Schneiter, Hickey and Mayor Henderson
NOES: None
ABSENT: Councilmember Wattenburger
- 2 -