HomeMy WebLinkAboutGregg Simpson Trucking 2015-12-10; Amendment 2 2016-06-22CITY OF UKIAH
CONTRACT CHANGE ORDER
ORDER NO. 2
DATE; June 22, 2016
Contract for (Description of Facility); Crosswalk at N. State Street and Garrett Drive, Specification No. 15-11
Owner: City of Ukiah, 300 Seminary Avenue, Ukiah, California, 95482-5400
To (Contractor): Greg2 Simpson Trucking. 11 Highland Court. Ukiah, CA 95482
You are hereby directed to make the herein described changes from the contract plans and specifications or do the following described
work not included in the contract plans and specifications:
Change requested by: City Engineer.
Description of Changes - Itemized Breakdown
ESTIMATED
DECREASE To
Contract Amount
ESTIMATED
INCREASE To
Contract Amount
1. Add thermoplastic pavement markings: "SLOW SCHOOL XING" in advance of
crosswalk, both directions and in each lane (total 4 applications), in accordance with
California MUTCD standards, at the agreed lump sum price of $8,970.
S8 970
2. Remove item from CCOa 1 "Remove existing thermoplastic crosswalk striping," at the
agreed lump sum price of$1,960.00.
$1,960.00
ESTIMATED NET CHANGE IN CONTRACT PRICE
S7+010.00
Justification (Detailed and Concise): Item 1: The pavement markings "SLOW SCHOOL X1NG" are required for uncontrolled crosswalks in
school zones, though was omitted from the original project plans and bid schedule. Item 2: "Remove existing thermoplastic crosswalk
striping," was listed as an extra work item in CCO 41, however it should be removed from extra work since it is listed in the bid schedule and a
lump sum cost was provided by the Contractor.
The amount of the Contract will be increased by the estimated sum of seven thousand ten dollars and no cents ($7,010.00).
The contract total including this Change Order will be: one hundred seventy-nine thousand four hundred sixty-nine dollars
and sixty-three cents ($179,479.63).
The contract period provided for completion will be increased due to the need to re -order 2 signs due to incorrect size, and obtaining needed
parts for the flashing crosswalk system, which was beyond the control of the Contractor. The new completion date will be June 30, 2016.
This document will become a supplement to the contract and all provisions will apply hereto.
Approved By:
Accepted:
(City) n h
(Contractor) `XNv 80(0 ti)
Date
49,0702.
Date
This information will be issued as a record of any changes to the original construction contract.