HomeMy WebLinkAbout2016-02-18 PacketCITY OF UKIAH
CITY COUNCIL AGENDA
Special Meeting
Ukiah Valley Conference Center
200 South School Street
Ukiah, CA 95482
February 18, 2016
5:30 p.m.
1. ROLL CALL
2. CLOSED SESSION
3. STRATEGIC PLANNING WORKSHOP (5:30 p.m.)
a. Overview and Discussion of the City of Ukiah's Waste Water
4. PUBLIC COMMENT
5. ADJOURNMENT
Please be advised that the City needs to be notified 24 hours in advance of a meeting if any specific
accommodations or interpreter services are needed in order for you to attend. The City complies with ADA
requirements and will attempt to reasonably accommodate individuals with disabilities upon request.
Materials related to an item on this Agenda submitted to the City Council after distribution of the agenda
packet are available for public inspection at the front counter at the Ukiah Civic Center, 300 Seminary
Avenue, Ukiah, CA 95482, during normal business hours, Monday through Friday, 8:00 am to 5:00 pm.
I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda
was posted on the bulletin board at the main entrance of the City of Ukiah City Hall, located at 300 Seminary
Avenue, Ukiah, California, not less than 24 hours prior to the meeting set forth on this agenda.
Dated this 12t" day of February, 2016.
Ashley Cocco, Deputy City Clerk
M _
n
ah Veqllev Sanitation District (UVSL
'�� �S g�
r.. .. v .. ...
$7,000,000.00
$6,000,000.00
$5,000,000.00
$4,000,000.00
$3,000,000.00
$2,000,000.00
$1,000,000.00
$0.00
i • • ' 1
2005 2oo6 2007 2oo8 2009 2010 2011 2012 2013 2014 2015
Budget
*This project could be reduced or eliminated with
the Recycled Water Construction Project
14 -15 FY15 -16 FY16 -17 FY17 -10 FY18 -19 Future Total
Sewer Main Repalcement
$ 500,000.00
$ 500,000.00
$ 500,000.00
$ 500,000.00
$ 500,000.00
$ 2,500 ,000.00
Flow Equalization Basin for WWf P
$ 150,000.00
$ 150,000.00
$ 400,000.00
$ 150,000.00
$ 150,000.00
$ 1,000 ,000.00
Flow Monitoring System for Collection System
$ 250,000.00
$ 250 ,000.00
Nitrate Reduction by 2020*
$ 25,000,000.00
$ 25,000)000.00
Sewers stem Master Plan
$ 150,000.00
$ 150 ,000.00
Recycled Water System Construction
$ 20,000,000.00
$ 15,000,000.00
$ 35,000 ,000.00
Total
$ 63,900,000.00
*This project could be reduced or eliminated with
the Recycled Water Construction Project
$180.00
$16o.00
$140.00
$120.00
$100.00
$80.00
$6o.00
$40.00
$ 20.00
$0.00
Ft. Bragg Ukiah Healdsburg Windsor
Average Bill (8 units)
r
'i =l_
a ..3
16
14
12
10
12/1/15 12/8/15 12/15/15 12/22/15 12/29/15 1/5/16 1/12/16 1/19/16
Plant flow, MGD
River flow CFS x l000
Rain, inches
M
SHIA, PUMP
CC N N Tf,-, I GN
Fli
IN(Al`PFD,-7,R RJ1Kr
NJ"_ SFWF.R MEWTILIT
FOUNDATION IlFr,1
N"I j
P 'F�6R ORD
r
F
K
T
!T
FOAl
PRIVATE PULLUL "JI I I'llii 9KI L
INFLOWSOUPCES OWNYISHII'VAMIS
Ht -�DWJNIIN Ll
SUMP PUMP CONNECTION rAU NiciPALir(
U� 110
')FT -9 OrA-rl)
CONNECTED FOLNDATION�DFIMN BREAKS F
. . _ . . A AN
CRACK$
ROOF DRAIN CONNECTION OPEN Jill NTS FVL:m
UNCAPPED OR BROKEN SEWER CLEAN-OUT INlivisloN
OREARS, CRACKS & OPEN JOINTS IN SERVICE PIPE FNAFY SERVE
CbNNEClIGN
fntTfiATION SOURCES
ROOT INTRUSION INTO SERVICE PIPE
BREWS, CRACKS & OPEN JOINTS IN SERVICE PIPE
PUBLIC
FAULTY MANHOLE COVER OR FRAME
STORM WATER CROSS CONNECTION
W&TRA170M SOURCES
DETERIORATED MANHOLE
FAULTY SERVICE PIPE CONNECTION 40
BROKEN OR CRACKED PIPE
OPEN JOINTS IN PIPE
OPEN JOINTS
LA
0HKEN OR
CRACKED WE