Loading...
HomeMy WebLinkAboutRau & Associates, Inc. 2010-08-03; Amendment 1 2016-01-04la/3-11(0-41 CITY OF UKIAH AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED AUGUST 3, 2010 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated August 3, 2010 shall remain in force and effect except as modified by this first amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 1. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the November 23, 2015 letter form Rau and Associates, Inc. A copy of said letter is included in this first amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $1,000. RAU AND ASSOCIATES, INC. BY: GEORGE C. RAU, P.E. Principal DATE Amendment No. 1 to Agreement for Professional Consulting Services CITY OF UKIAH BY: >: AG yrANGIA OC MO City Manager i e. - -i6 DATE AND ASSOCIATES INC. CIVIL ENGINEERS • LAND SURVEYORS City of Ukiah Attn: Tim Eriksen, Director of Public Works Rick Seanor, Deputy Director of Public Works 300 Seminary Ave Ukiah, CA, 95482 November 23, 2015 Job Number R10064, RECEIVED NOV 2, 4 2015 CITY OF UKIAH DEPT. OF PUBLIC WORKS RE: CHANGE TO SCOPE OF WORK: UPDATE PLANS FOR RECONSTRUCTION OF SIDE WALK ON NORTH SIDE OF SMITH STREET IN UKIAH Gentlemen: This letter is to request an amendment to our Agreement for Professional Consulting Services, dated August 10, 2010. RAU was authorized to provide a topographic map and the design to rehabilitate a segment of distressed sidewalk on the north side of East Smith Street, between the addresses of 262 East Smith Street and 274 East Smith Street in 2010. A review set of drawings was submitted in December, 2010, to the City for review and comment. We recently (September 9, 2015) received comments and a request to finalize the construction drawings. Because of the length of time which elapsed since the plans were originally submitted, codes have changed and the drawing references need to be updated and checked against the current codes. There are also some changes which are necessary to make on six cross - sections to reduce the estimated cost of construction. Those changes will also result in some additional construction notes to assure that the contractor addresses paving grades properly as the work progresses. Our "Schedule of Fees" for the original work was dated January 1, 2008. We have updated our Schedule of Fees since then. " Schedule of Fees — Table 33" is attached with our current rates. The cost of this additional work is estimated to be in the range of $800 to $1,000 at our current hourly fee schedule. Very truly yours, George C. Rau, P.E. President Attachment: Schedule of Fees -Table 33 100 NORTH PINE STREET • UKIAH, CALIFORNIA 95482 • 707 - 462 -6536 • FAX 707 - 463 -2729 www.rauandassoc.com SCHEDULE OF FEES - Table 33 Effective September 1, 2015 Administration Associate Civil Engineer Chief of Party (PW) Construction Inspector /QSP Specialist (PW) Expert Witness /Testimony at Trial, Deposition, Arbitration GPS Operator Instrument Operator (PW) Materials Tester including PW (nuclear gauge charge may apply) Outside Services Project Coordinator Registered Civil Engineer Principal Rodman (PW) Sr. Staff Engineer /Surveyor /QSP Specialist Survey Manager Technician I Technician II Vehicle Use (subject to change due to Internal Revenue Standards) Laboratory Tests: Texture Analysis (Mendocino County Health Dept.) Unit Dry Weight- Moisture Content (Tube Sample or Ped) Sand Equivalent (CTM 217) Sieve Analysis - Coarse Aggregates (CTM 202) Sieve Analysis - Fine Aggregate (CTM 202) Maximum Dry Density (ASTM D1557) 4" Mold 6" Mold Maximum Dry Density (ASTM D698) Maximum Wet Density (CTM 216) Unit Weight of Aggregate (CTM 212) Method A or B Method C Crushed Particle Analysis (CTM 205) Cleanness Value (CTM 227) Durability Index - Coarse (CTM 229) Durability Index - Fine (CTM 229) Specific Gravity & Absorption (CTM 206) Plasticity Index (ASTM 4318) Expansion Index (UBC Standard 18 -2) Unit Weight of Fresh Concrete (CTM 518) Ball Penetration (CTM 533) Air Content of Fresh Concrete (CTM 504) Sample Preparation Times Special Equipment Rates: All Terrain Vehicle $45.00/per day* Computer Aided Design Software $10.00 /hr. GPS Equipment $600 /per day* Nuclear Gauge $100 /per day* Robotic Total Station $200 /per day* " One Day Minimum Charge $60.00/hr. $140.00 /hr. $135.00/hr. $128.00/hr. $250.00/hr. (4 hour minimum) $135.00/hr. $118.00/hr. $116.00/h r. Cost + 15% $70. 00/h r. $175.00/hr. $115.00/hr. $115.00/h r. $135.00/hr. $38.00 /hr. $72.00 /hr. $0.575 /mile Supplemental Billings: Engineering Copies 24 X 36 Engineering Copies 18 X 26 Engineering Copies 11 X 17 Steel Fence Posts Survey Monuments $ 45.00 /ea. $35.00 /ea. $110.00 /ea. $50.00 /ea. $90.00 /ea. $205.00/ea. $235.00/ea. $190.00 /ea. $235.00/ea. $55.00 /ea. $39.00 /ea. $67.00 /ea. $67.00 /ea. $140.00 /ea. $220.00 /ea, $90.00 /ea. $162.00/ea. $190.00 /ea. Technician Hourly Rate Technician Hourly Rate Technician Hourly Rate Technician Hourly Rate $3.00 /sheet $2.00 /sheet $1.00 /sheet $8.00 /each $3.00 /each Invoices will be rendered monthly, as a final or progress billing, whichever applies, and are payable upon receipt, unless a mutually acceptable payment schedule has been established. Late Fees at a rate of 1 1/2% per month, computed and charged monthly on the entire unpaid balances, shall be payable on accounts not paid within 30 days from invoice date.