HomeMy WebLinkAboutWinzler & Kelly 2002-06-27; Amendment 2 2008-09-18ao-Lk- JO, of 27to —�,
CITY OF UKIAH
AMENDMENT NO. 2
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED JUNE 27, 2002
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
June 27, 2002 and the Amendment dated July 27, 2002 shall remain in force and effect
except as modified by this second amendment.
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service
described under the Scope of Additional Work identified in this Amendment No. 2.
SCOPE OF ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
September 18, 2008 letter proposal from Winzler & Kelly. A copy of said letter is included
in this second amendment.
COMPENSATION
Compensation for the performance of the additional work shall be made on a time and
expense basis at Consultant's customary fees. Expenses shall not exceed a maximum
total cost of $45,000.
WINZLER & KELLY
BY:
ARC SOLOMON
G in a V cc-- p, .z,3(0 -'r
C c- 24 2W6
DATE
Amendment No. 2 to Agreement for
Professional Consulting Services
CITY OF UKIAH
BY:
J E CHAMBERS
y Manager
DATE
4,747 WINZLER&JKELLY
September 18, 2008
Mr. Richard Seanor, PE, Deputy Director of Public Works
City of Ukiah Department of Public Works
300 Seminary Avenue
Ukiah, CA 95482 -5400
Ref: PP320- 00000 -32004
Re: Letter of Interest for Providing Engineering Services for Right Turn Lane at
Orchard Avenue and Perkins Street
Dear Mr. Seanor:
Winzler & Kelly is pleased to submit this letter of interest for providing engineering services to
the City of Ukiah for the design of the right turn lane at the northeast corner of Perkins Street and
Orchard Avenue. Services would include topographic surveys, right of way mapping and design
engineering for the preparation of Contract Documents for the right turn lane. Winzler & Kelly
has an excellent long - standing relationship with the City of Ukiah and we appreciate this
opportunity to submit a proposal for these design services.
FIRM PROFILE
Winzler & Kelly is a multidiscipline firm with over 55 years of experience in the planning and
design of infrastructure for municipalities and government agencies. During our growth and
development, we have established a staff of engineers and environmental scientists thoroughly
versed in developing and analyzing alternatives and
providing cost - effective, implementable design solutions. ELECTRICAL
Today, we operate from offices throughout California and CONSTRUCTION MAPPINGIGIS CIVIL
the Pacific Rim, with our largest operations located in Santa
Rosa and San Francisco. ENVIRONMENTAL
We provide engineering services in the following
disciplines:
• Civil /Structural/Mechanical /Electrical Engineering
• Surveying, Mapping, Right of Way and GIS
development
• Water, Wastewater and Recycled Water Engineering
• Construction Management and Inspection
• Hazardous Material Management and Abatement
HYDROLOGY
MODELING
MECHANICAL CORROSION
STRUCTURAL
Richard Seanor, PE
September 18, 2008
Page 2
• Industrial Hygiene, Lead and Asbestos Abatement
• CEQA/NEPA Compliance and Permitting
• Environmental Planning
• Public Outreach
• Transportation /Traffic
Winzler & Kelly specializes almost exclusively in municipal engineering for cities, counties and
special districts. Because of this, we understand the need to perform small task -based
assignments like this one efficiently and respective of practical solutions.
STAFFING
If selected for this assignment, we will assign the following team to complete the design
services.
Richard Jorgensen will serve as Project manager. He has over 32 years in site development
and storm drainage analysis, has an ongoing working relationship with City staff and will work
closely with the City in completing a successful project.
Bill Silva will serve as Principal -in- charge. Bill is a registered civil engineer with over 13
years of extensive roadway, grading, utility, and redevelopment design experience. Prior to
relocating to Sonoma County, Bill worked for a County Department of Public Works in the State
of Washington. Bill brings an understanding of public works engineering that can only be
developed from experience within a municipal engineering department.
Darren Dalby will serve as Project Engineer. Darren has over 15 years of roadway design
experience. This experience includes both new construction and reconstruction of existing
roadways. Darren's most recent project was the Cloverdale Boulevard Street Improvement
project. Darren has worked on street reconstruction projects for the Cities of Cloverdale, Cotati,
Santa Rosa, and the Town of Windsor.
Matt Kennedy will be responsible for the traffic signal modifications. Matt is a Registered
Civil Engineer and Traffic Engineer with over four years of experience on a wide variety of
traffic and water resources projects and a track record of consistently meeting project deadlines
and budget objectives.
Kevin Maple will provide quality review. Mr. Maple is a senior engineer and project manager
with approximately 20 years' experience designing and managing a wide range of projects that
include development master plans, residential, commercial, industrial, and institutional site
improvement plans. In addition, he has experience in the design of public infrastructure projects that
include geometric roadway design, storm drainage analysis and design, and water and wastewater
2
Richard Seanor, PE
September 18, 2008
Page 3
conveyance systems design. Mr. Maple also combines his experience with hands -on field
experience in construction observation and construction management.
PROJECT UNDERSTANDING /SCOPE OF SERVICES
Based on discussions with City staff and review of existing documents our understanding of the
project is the construction of a new right turn lane at the northeast corner of Perkins Street onto
Orchard Avenue. This intersection is just west of the US 101 freeway off -ramp. Our cursory
review of right -of -way indicates that Caltrans right -of -way originally extended up to the
intersection with Orchard Avenue. Although a portion of this right -of -way was deeded to the
County, there is still a portion within Caltrans that would be impacted by the reconfiguration of
the intersection and require obtaining a Caltrans easement. The project will also require
obtaining right -of -way from the adjacent private property and will require preparing a Plat and
legal description for right -of -way acquisition. The realignment will also require reconfiguration
of the traffic signal at the intersection to include a right turn signal, relocation of signal poles and
additional signal loop controls in the street. Utilities requiring relocation are limited to minor
realignment of storm drain catch basins and street lights.
The work performed will be divided into phases as described below:
1. Topographic Survey and Plat/Legal Descriptions for Right -of -Way Acquisitions
2. Preliminary Plans (50 %)
• Attend one meeting with City of Ukiah staff to identify and clarify concepts for the civil
improvements for the right turn lane at Perkins Street and Orchard Avenue.
• Collect field survey data and prepare topographic mapping.
• Preliminary Drawings; CAD layouts indicating proposed civil improvements.
• Technical specification section list.
• Estimate of probable construction cost.
3. Construction Documents (100 %) - Based on City of Ukiah approval of previously
developed Preliminary Plans (50 %) package, this phase will be prepared to include the
following:
• Attend one meeting with City of Ukiah staff to review final civil improvement design and
make minor adjustments.
• Construction Drawings and Details; final civil improvements ready for bidding and
construction.
• Final technical specifications.
• Final estimate of probable construction cost.
3
Richard Seanor, PE
September 18, 2008
Page 4
4. Caltrans Encroachment Permit Application
• Prepare and submit Caltrans encroachment permit application.
Information to be Provided by City of Ukiah
• Any site plans and background drawings available in the vicinity of the site.
• As -built record information of any previous construction in the vicinity of the site.
• Front -end documents supplied by the City to be incorporated into the technical
specifications.
General Assumptions/Exclusions
This proposal is based on the following assumptions:
• Meetings other than indicated above are not required.
• No new utility improvements required.
• Existing utility modifications required are assumed to be limited to: traffic signal
modifications, minor drainage improvements and relocation of street lights.
• All permitting required for project work will be performed by the City.
• No hazardous materials are anticipated and this scope of services does not provide
services to address such elements.
• City of Ukiah will address project CEQA requirements if required.
• Approval of Plans and Specifications will be by the City Public Works Department, no
other approvals are assumed necessary and are not part of this scope.
• City will provide document reproduction for bidding.
• Additional services which may be provided by Winzler & Kelly but are not included in
our scope of service include assistance during bidding, including responding to bidders
questions, contract administration or construction observation. We can give you a cost
estimate for these items when the design is complete and the contractor's schedule is
known.
Deliverables
1. Construction Documents:
• Civil drawings with technical specifications.
o 1 full size plan set (reproducible)
o 1 CD (electronic set of plans and technical specifications)
FEE
Winzler & Kelly will provide the above scope of services for an estimated time and expense fee,
not to exceed $45,000.
4
Richard Seanor, PE
September 18, 2008
Page 5
SCHEDULE
If the above scope and fee meet your approval and once we receive a signed agreement, we will
schedule the work to be performed. Dependent on the schedule and availability of staff, we
expect to complete this work in approximately 8 weeks.
Thank you for providing Winzler & Kelly the opportunity to submit this proposal and we hope to
be able to help the City with the design of the intersection modifications.
Sincerely,
WINZLER & KELLY
William Silva, P.E.
Principal -in- Charge
am
5
October 24, 2008
Mr. Marc Solomon
Winzler & Kelly Consulting Engineers
495 TESCONI CIRCLE
SANTA ROSA CA 95401 -4696
RE: Amendment No. 2 to Agreement for Professional Consulting Services
Right Turn Lane on Perkins Street at Orchard Avenue
Dear Mr. Solomon:
Enclosed please find a fully executed original of the subject amendment for your file. By this
letter you are authorized to proceed with the work identified in this amendment.
Thank you for your assistance with this project. Please do not hesitate to contact me at
(707) 463 -6296 if you have further questions.
Sincerely,
Richard J. Seanor
Deputy Director of Public Works
enc.
cc: Linda Brown, City Clerk w /duplicate original I�
Tim Eriksen, Director of Public Works /City Engineer w /enc
file
300 SEMINARY AVENUE UKIAH, CA 95482 -5400
Phone# 707/463 -6200 Fax# 707/463 -6204 Web Address: www.cityofukiah.com