Loading...
HomeMy WebLinkAboutAnn Baker Landscape Architecture 2015-05-21; Amendment 1 2015-12-15C 9 4 A - A / V . t i 15 -2 5Z A-I CITY OF UKIAH AMENDMENT NO. 1 TO PROFESSIONAL SERVICES CONTRACT 1415200 BETWEEN ANN BAKER LANDSCAPE ARCHITECTURE and THE CITY OF UKIAH This Amendment No. 1, entered on December 15, 2015, revises the Agreement for Professional services dated May 21, 2015 between the City of Ukiah and Ann Baker Landscape Architecture for professional consulting services relating to the construction management/administration and exhibit development services for the Grace Hudson Museum Nature Education Facility Project. This Amendment No. 1 adds to the scope of work Task 3: Phased Bidding Assistance and Value Engineering, as per Exhibits A and B. Additional cost for this work is 553,805.00. As a result, the revised total contract amount is not -to- exceed 5337,805.00. Except as expressly amended by this Amendment, all other terms remain unchanged and in full force and effect. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AMENDMENT ON THE EFFECTIVE DATE: ANN BAKER DS : PE ARCH I ECTURE BY: ANN BAKER CITY OF UKIAH BY: SA A I LEST SAN ACOMO, CITY MANAGER BY: in, IS Ltvm KRISTINE LAWLER, CITY CLERK DATE: S DATE: / )— t S -� DATE: `o - I S ! S E.414 1& � Tp ? I�1�C D, z�� 1 - 04141 sZaO September 30, 2015 Ann Baker Landscape Architecture Grace Hudson Museum Nature Education Scope of Work for Amendment #1 to the Construction Administration and Construction Observation Contract for the Grace Hudson Museum Nature Education Project The following scope of work describes the tasks and deliverables the Consultant Team ( "Consultants ") will follow to provide additional services to value engineer the project and bring it to bid in smaller projects that represent similar types of work. TASK 3: PHASED BIDDING ASSISTANCE AND VALUE ENGINEERING (T &M) Subtask 3.01 Value Engineering and Phasing Consultants will evaluate project costs and previous bids, implement value engineer- ing, and develop a phased approach to bidding the project. The objective is to reduce project complexity by organizing the bidding for different Contractor types and coordi- nating specialty fabrications to bid as Owner supplied. This task will be provided on a fixed fee basis. Deliverables: Cost Analysis spreadsheet, Memo Detailing Phased Bidding Approach, Value Engineering List, Evaluation of Design Impacts of VE Subtask 3.02 Prepare Bid Documents - Garden Structures Consultants will prepare full bid documents for the two structures in the Wild Garden area, the Brush Arbor and the Outdoor Pavilion. arise during construction. Consultants September 30, 2015 will evaluate and revise materials in this process to reduce cost and improve con - structability. This task will be provided on a time and materials basis. Deliverables: Construction documents for Garden Structures: Plans, Technical Specifi- cations, Special Provisions, Engineer's Estimate and Bid Sheet Subtask 3.03 Prepare Bid Documents - Wild and Stormwater Garden Consultants will prepare full bid documents for the Wild Garden, Porno Courtyard and Stormwater Garden landscape including grading, wet utilities, pathways, irrigation, planting, lighting. Deliverables: Construction documents for Garden Structures: Plans, Technical Specifi- cations, Special Provisions, Engineer's Estimate and Bid Sheet Limitations and Exclusions on Scope of Services Specific Exclusions from this Scope of Work: Hazardous Materials Investigations and Remediation Construction Documents for Security Fencing, Gates and Cameras for the Sun House Note: this proposal assumes all previous agreements, limitations and descriptions de- scribed in the original scope of work and the project contract will apply herein. Sincerely, Ann F. Baker Principal, Ann Baker Landscape Architecture r, Eel -0 Grace Hudson Museum Nature Ed. Facility Ann Baker Landscape Architecture Construction Administration & Exhibit Development Fee Schedule + Phased Bidding and Value Engineering Description r CIL 41S 2-00 ABTA Estimated Ann Baker Work Period 1145 per hour Task 1 - Construction Adnunistration (T&M) 1.01 Construction Administration 1.02 Construction Observation 1.03 CA & CO Tier Two Services 1.04 Maintenance & Operations Manual 7/2015. 2/2016 7/2015- 2/2016 2/2016 - 3/2017 December 2016 CA Subtotal Hours Amount 30.00 S4,350 72.00 110,440 16.00 12,320 16.00 12,320 134.00 119,430 ASIA PGA PGA Associate Principal Land. Architect 115 per hour 160 per hour 140 per hour 0.00 50 8.00 5920 10.00 51,150 8.00 5920 26.00 12,990 8.00 11,280 0.00 90 8.00 51,280 0.00 SO 22.0 13,190 45.0 55.175 20.0 52.400 8.0 51.160 50.0 55,000 360.0 539,600 0.00 80 12.00 51.680 8.0 51,160 8.0 5920 0.0 50 0.0 50 110.0 511,000 120.0 513,200 0.00 50 0.00 50 0.0 50 0.0 50 0.0 50 0.0 50 0.0 50 0.0 50 16.00 52.560 12.00 51.680 42.00 16,090 125.00 514,375 20.00 52,400 58.00 18.410 500.00 550,000 480.00 552,800 Architect Principal 145 per hour Architect Structural Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Potomac Electrial Engineer Associate Principal Principal Design Engineer Inspector Survey Crew Survey Calculations QSDIQSP1SWPPP Clerical Principal Principal 115 per hour 120 per hour 145 per hour 100 per hour 110 per hour 170 per hour 125 per hour 130 per hour 55 per hour 185 per hour 150 per hour 12.0 51,740 72.0 58,280 0.0 50 50.0 57,250 340.0 534,000 0.0 50 0.0 SO 12.0 51,500 20.0 52,600 420.0 523.100 4.0 5740 8.0 51,200 586,040 ids,, 2 - Exmhit DeusinumiH and Adapuvu Management 2.01 Exhibit Development Services 9/2015- 1/2017 2.02 Adaptive Management - Additional Plantings 2016 -17 Exhibit Development Subtotal Task 1 & 2 Subtotal Estimated Reimbursable Expense @ 10% Total Task 1 & 2 150.00 40.00 190 324.00 521,750 72.00 98,280 55,800 8.00 5920 527,550 80 59,200 546.980 106.00 112,190 0.00 10 0.00 SO 20.0 52,900 40.0 S4,600 0.0 50 0.0 50 0.0 SO 0.0 50 0.00 SO 0.00 SO 0.0 SO 0.0 50 0.0 SO 0.0 50 0.0 SO 0.0 50 0 50 0 50 20 52,900 40 S4,600 0 50 0 50 0 SO 0 SO 16.00 12,560 12.00 11.680 62.00 58,990 165.00 S18,975 20.00 12,400 58.00 18.430 500.00 550,000 480.00 552,800 Task 3 - Phased Blddmg Assistance and Value Engin"iront 3.01 Value Engineering & Phasing 7/2015- 1/2016 3.02 Prepare Bid Documents - Garden Structures Fall 2015 3.03 Prepare Bid Documents - Wild & Stormwater Garden Fall /Winter 2015 Task 3 Subtotal Estimated Reimbursable Expense @ 6% Total Task3 39.00 8.00 48.00 95 15,655 11,160 16,960 113,775 0.00 0.00 18.00 18 50 SO 52,070 12.070 18,00 4.00 12.00 34 52.880 1640 51,920 55,440 0.00 4.00 28.00 32 50 5560 53,920 54.480 27.0 54,590 0.0 50 0.0 SO 27.00 $4,590 0.0 0.0 S0 0.0 50 0.0 50 12.00 51,500 0.0 0.0 10.0 30.00 $0 SO 51,300 53,900 0.0 SO 140.0 57,700 0.0 50 560.00 530,800 24.0 12.0 6.0 46.00 54,440 16.0 12,400 12.220 0.0 50 51.110 0.0 58,510 24.00 SO 53.600 580,595 541,350 55,650 1213,635 50 0.0 50 0.0 50 0.0 50 0.0 50 50 537.530 0.0 So 0.0 50 0.0 SO 0.0 50 0.0 50 SO S6,720 0 50 0 SO 0 50 0 SO 0 50 0 50 544,250.00 27.00 54,590 12.00 51,500 30.00 53,900 560.00 530,800 46.00 58,510 24.00 53,600 5257,885 525,789 5283,673.50 111111111111--11111- 6.0 1870 0.0 50 10.0 51,200 6.0 5870 18.0 51,800 0.0 50 0.0 SO 0.0 SO 6.0 5780 0.0 SO 2.0 1370 12.0 51,800 516,221 18.0 52,610 30.0 53,450 5.0 5600 0.0 SO 16.0 51,600 0.0 SO 0.0 SO 0.0 SO 0.0 SO 0.0 SO 0.0 50 12.0 51.800 0.0 10 0.0 50 12.0 51,440 4.0 5580 27.0 52,700 0.0 50 0.0 50 0.0 SO 9.0 51,170 0.0 50 2.0 137 12.0 51,800 24 13,480 30 13,450 27 13,240 10 11.400 61 56,100 0 50 0 SO 0 50 15 11,950 0 50 4 5740 36 15,400 912.420 522,597 951,242.00 52,562 553,804.10