Summary of Project Reserves
Program Funding Summary with Funding Sources
Airport
Building Maintenance
Conference Center
Electric
Engineering
Finance
Fire
Garage
Golf Course
Information Technology
Page 1
Page 4
Page 9
Page 15
Page 21
Page 25
Page 49
Page 57
Page 61
Page 67
Page 71
Page 79
Table of Contents
Museum Page 89
Parks
Police
Storm Drain
Streets
Wastewater
Water
Page 93
Page 101
Page 105
Page 109
Page 125
Page 145
Appendix – Fleet Justifications Page 161
Building Maintenance
CAP
I
T
A
L
B
UD
G
E
T
F
IS
C
A
L
Y
EA
R
20
1
5
-20
1
6
Guide to the Capital Budget:
Project Reserves: In the past the City has set aside funds for future Equipment (Fund 220) and Special Projects (Fund 251). The worksheets
shown on pages 2 and 3 reflect balances set aside in the past and where funds originated. In addition, proposed transfers and expenditures are
shown with a projected ending balance. These worksheets are meant to aid Staff and City Council when monies are needed for a project that is
unfunded.
Program Funding Summary With Funding Sources: This section is a summary of all funding shown in the Capital Budget. This area also
includes a summary of projects which are unfunded at this time. $3,565,614 in projects requests are currently unfunded. The page following the
Program Funding Summary shows a list of all unfunded or partially funded projects and the section of the budget the project can be found.
Department Sections: Each Department is shown in a separate section. For example, the first Department section is for Capital Projects
relating to the Airport. At the front of each section the total capital projects for that area are listed for Fiscal Year 2016. The Section then
summarizes funding sources that are going to fund the projects and appropriation amounts for projects. The remaining pages include more detail
for each project and a forecast for future years for the project for that department.
Appendix: The Appendix includes fleet justification worksheets for Fiscal Year 2016 requests.
CAPITAL BUDGET FISCAL YEAR 2015-2016
PROJECT RESERVES
1
CAP
I
T
A
L
P
RO
J
E
C
T
S
Capital Projects – Summary of Equipment Reserves (Fund 220)
Projected
Budget
2015-16
Funding* Reserve Beginning Transfers Ending
Source No. Reserve Revenues (IN)/OUT Expenditures Reserve MUNIS Acct. #
2015-16 2015-16
City Clerk 100 110 (5,750) (5,750) 22000000.38110
Finance 100 130 (3,390) 3,390 0 22000000.38130
Planning 100 150 0 0
Building Maintenance 100 195 (610,691) 100,000 (510,691) 22000000.38195
Computer Support 100 196 (22,338) (120,684) 143,022 0 22000000.38196
Police 105 201 (41,030) 41,030 0 22000000.38201
Fire- Apparatus 105 211-212 (90,455) (207,223) (297,678) 22000000.38211
Fire - Equipment 105 213 (65,000) 65,000 0 22000000.38313
Parking 640 220 (30,000) (30,000) 22000000.38220
Building Inspection 100 221 0 0
Engineering/Unrestr 100 301 (88,245) (88,245) 22000000.38301
Street Maintenance 100 311 0 0
Corporate Yard 208 330 (114,038) 20,000 (94,038) 22000000.38330
Garage 203 575 (54,030) (56,000) 110,000 (30) 22000000.38575
Airport 777 600 0 0
Parks & Recreation 300 601 0 0
Sewer 844 612 (201,148) 200,000 (1,148) 22000000.38612
Utility Billing 205 697 (14,135) (100,000) 114,135 0 22000000.38697
Water 820 820 (77,687) 75,000 (2,687) 22000000.38820
Dispatch Equip Replacement 206 678 (5,630) (5,630) 22000000.38678
Electric Equip Replacement 800 800 (140,000) (140,000) 22000000.38800
Reserve For Encumbrances 100 (116,322) (116,322)
Undesignated - Interest 100 (164,790) (21,403) 107,223 78,970 0
Summary of Changes (1,844,679) (21,403) (376,684) 950,546 (1,292,219)
This worksheet shows reserve funds held for equipment. The Funding source shows where funds are transferred from. All “Transf ers
In” include a reserve number which is shown in the column heading “Munis Acct. #”. The Expenditure Column represents planned
spending for Fiscal Year 2016.
*All funding sources with 100 fund are unrestricted
2
CAP
I
T
A
L
P
RO
J
E
C
T
S
Capital Projects – Summary of Special Project Reserves (Fund 251)
2014-15 2015-16
Reserve Funding * Adjusted Transfers Ending
No. Source Balance (in) out Expenditures Projects Reserve MUNIS Acct. #
Grant Match 001 100 (51,900) 19,000 NWP Rail Trail (32,900) 25100000.39001
Financial Software 002 100 (100,000) 100,000 Transfer out to Fund 220 Equip Reserve 0 25100000.39002
ADA Ramps 010 Gas Tax (137,977) 50,000 ADA Ramps (87,977) 25100000.39010
Bridge Replacements 011 - (254,438) 254,438 Orr Street Bridge Reconstruction 0 25100000.39011
Talmage Rd Bike/Ped 013 100 (22,932) (22,932) 25100000.39013
Open Space Acquisition 015 100 (66,735) (66,735) 25100000.39015
Smith Street Repairs 021 100 (21,951) 21,951 Smith Street Sidewalk (0) 25100000.39021
GASB Implementation 024 100 (4,925) (4,925) 25100000.39024
Benchmark Verification 026 100 (2,905) (2,905) 25100000.39026
Storm Drain
Replacements 027 100 (50,617) 50,617 Fairgrounds Storm Drain - Partial only 0 25100000.39027
Upgrade Traffic
Loops/Signals 028 Gas Tax (50,000) 25,000
Upgrade Traffic Loop - Orchard to
Perkins (25,000) 25100000.39028
Orchard Ave. Extension 029 100 (115,000 (115,000) 25100000.39029
Cleveland Lane
Drainage 031 100 (190,785) 160,000 Drainage used for MUSEUM Project (30,785) 25100000.39031
Orr Creek
Improvements 032 misc (4,985) (4,985) 25100000.39032
Asset Management
Software 038 UTIL's (82,171) 60,000 Asset Management Software (22,171) 25100000.39038
Facility Needs Study 039 100 (50,000) (50,000) 25100000.39039
Maintenance Yard
Development 041 208 (13,018) (13,018) 25100000.39041
Form Based Code
Project 042 100 (925) (925) 25100000.39042
Todd Grove Picnic Area 044 300 (50,000) (50,000) 25100000.39044
IT Dept Upgrades 046 100 (81,979) 81,979 I.T. Capital Expenses 0 25100000.39046
Sphere of Influence 047 100 (27,000) 27,000 0 25100000.39047
Perkins St Storm Drain 280 100 (12,141) 12,141 Perkins Street Storm Drain 0 25100000.39280
Reserve
Unfederalized601 601 601 (313,250) 313,250 Washington Street Reconstruction 0
Reserve Unfederalized
603 603 603 (347,770) 347,770 Washington Street Reconstruction 0
Reserve For
Encumbrances (30,334) (30,334)
Undesignated (135,446) 123,000 33,049 20,603
Summary of Changes (2,219,181) 250,000 1,429,193 (539,988)
* The funding source shows the fund number that funded the reserve amount. In some cases it was various funds such as "Gas Tax" or "Util".
This worksheet shows reserve funds held for Special Projects. The Funding source shows where funds are transferred from. All
“Transfers In” include a reserve number which is shown in the column heading “Munis Acct. #”. The Expenditure Column represents
planned spending for Fiscal Year 2016.
All funding sources with 100 fund are unrestricted.
3
CAP
I
T
A
L
P
RO
J
E
C
T
S
Capital Improvement Program Funding Summary with Funding Sources
(Continued)
Funding
Requested
2015-16
Anticipated
Request
2016-17
Anticipated
Request
2017-18
Anticipated
Request
2018-19
Anticipated
Request
2019-20
Total Estimated
5-Year
Funding
Funding Source
Airport
Airport Reserve (Fund 777)212,375 212,375
FAA Grant - Federal Funding (Fund 777)202,500 202,500
FAA Grant - State Funding (Fund 777)10,125 10,125
Sub Total 425,000 425,000
Building Maintenance
Equipment Reserve (Fund 220)100,000 100,000
Sub Total 100,000 100,000
Conference Center
Unfunded 65,000 65,000
Sub Total 65,000 65,000
Electric
Electric Reserve (Fund 801)4,745,000 1,225,000 325,000 115,000 65,000 6,475,000
Sub Total 4,745,000 1,225,000 325,000 115,000 65,000 6,475,000
Engineering - Public Works
Special Project Reserve (Fund 251)338,438 338,438
Special Revenue (Fund 250)252,500 300,000 1,531,000 2,083,500
STP d(1) (Fund 509)36,500 - 36,500
Sub Total 627,438 300,000 1,531,000 2,458,438
Capital Improvement Program Sources of Funding
for planning purposes only
4
CAP
I
T
A
L
P
RO
J
E
C
T
S
Capital Improvement Program Funding Summary with Funding Sources (Continued)
(Continued)
Funding
Requested
2015-16
Anticipated
Request
2016-17
Anticipated
Request
2017-18
Anticipated
Request
2018-19
Anticipated
Request
2019-20
Total Estimated
5-Year
Funding
Funding Source
Finance
Equipment Reserve (Fund 220)117,524 117,524
Sub Total 117,524 117,524
Fire - Public Safety
Equipment Reserve (Fund220)65,000 65,000
Sub Total 65,000 65,000
Garage
Equipment Reserve (Fund 220)110,000 110,000
Sub Total 110,000 110,000
Golf
Golf Fund (Tayman Park)(Fund 720)155,000 155,000
Sub Total 155,000 155,000
Information Technology
Equipment Reserve (Fund 220)143,022 143,022
Project Reserve (Fund 251)81,978 81,978
Sub Total 225,000 225,000
Grace Hudson Museum
Unfunded 25,000 25,000
Sub Total 25,000 25,000
Capital Improvement Program Sources of Funding
for planning purposes only
5
CAP
I
T
A
L
P
RO
J
E
C
T
S
Capital Improvement Program Funding Summary with Funding Sources (Continued)
(Continued)
Funding
Requested
2015-16
Anticipated
Request
2016-17
Anticipated
Request
2017-18
Anticipated
Request
2018-19
Anticipated
Request
2019-20
Total Estimated
5-Year
Funding
Funding Source
Parks
Prop 84 (Fund 310)2,300,000 240,000 2,540,000
Housing Grant 142,800 142,800
Habitat Conservation Fund Grant (HCF)140,000 140,000
Project Reserve (Fund 251)160,000 160,000
Anton Reserve (Fund 301)18,000 18,000
Unfunded 193,663 193,663
Sub Total 2,954,463 240,000 3,194,463
Police
Equipment Reserve (Fund 220)120,000
Unfunded 120,000 120,000 120,000 120,000 480,000
Sub Total 120,000 120,000 120,000 120,000 120,000 600,000
Storm Drain
Project Reserve (Fund 251)50,617 50,617
Unfunded 124,383 124,383
Sub Total 175,000 175,000
Streets
Special Revenue (Fund 250)1,951,500 1,951,500
Project Reserve (Fund 251)716,019 716,019
STIP (Fund 507)227,000 1,235,000 1,462,000
STP d (1) (Fund 509)350,500 150,000 500,500
Congestion Relief (Fund 510)400,000 400,000
Unfunded 4,072,141 4,072,141
Sub Total 7,717,160 1,385,000 9,102,160
Capital Improvement Program Sources of Funding
for planning purposes only
6
CAP
I
T
A
L
P
RO
J
E
C
T
S
Capital Improvement Program Funding Summary with Funding Sources
Funding
Requested
2015-16
Anticipated
Request
2016-17
Anticipated
Request
2017-18
Anticipated
Request
2018-19
Anticipated
Request
2019-20
Total Estimated
5-Year
Funding
Funding Source
Wastewater
Equipment Reserve (Fund 220)200,000 200,000
Prop 84 (Fund 607)2,090,191 17,152,000 19,242,191
Sewer Operating (Fund 840)250,000 250,000
Sewer Capital (Fund 844)1,084,770 1,084,770
Sub Total 3,624,961 17,152,000 20,776,961
Water
Fund 220 Equipment Reserve 75,000 75,000
Fund 607 Prop 84 Grant 125,000 125,000
Fund 822 Water CIP Fund 4,167,500 4,167,500
Millview Water District (Fund 607)31,250 31,250
Willow Water District (Fund 607)31,250 31,250
Sub Total 4,430,000 4,430,000
Total 25,681,546$ 20,822,000$ 1,976,000$ 235,000$ 185,000$ 47,967,405$
Capital Improvement Program Sources of Funding
for planning purposes only
7
2015-16
Unfunded Capital Projects
Project Amount Amount Funded Amount Unfunded
Conference Center
HVAC System Renovation $ 30,000 $ - $ 30,000
Bathroom Efficiency Update $ 35,000 $ - $ 35,000
Subtotal $ 65,000 $ - $ 65,000
Grace Hudson Museum
Roof Repair $ 25,000 $ - 25,000
Subtotal $ 25,000 $ - $ 25,000
Parks
Replace Toro Grounds master 4000D $ 25,000 $ - $ 25,000
Replace Dodge D200 Utility Truck $ 40,000 $ - $ 40,000
Anton Stadium Irrigation System Renovation $ 128,663 $ - $ 128,663
Subtotal $ 193,663 $ - $ 193,663
Storm Drain
Replace Storm Drain at 12th District Fairgrounds $ 175,000 $ - $ 175,000
Subtotal $ 175,000 $ - $ 175,000
Streets
Talmage Rd. & US 101 Interchange Improvements $ 1,700,000 $ - $ 1,700,000
Redwood Business Park Transportation Improvements $ 1,200,000 $ 1,200,000
Replace Street Sweeper $ 240,000 $ 33,049 $ 206,951
Subtotal $ 3,140,000 $ 3,106,951
Total $ 5,598,663 $ 33,049 $ 3,565,614
Capital Improvement Program Sources of Funding (Continued)
Capital Improvement Program Sources of Funding (Continued)
8
CAPITAL BUDGET FISCAL YEAR 2015-2016
AIRPORT
9
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
A
IR
P
O
R
T
Capital Projects - Airport
Fiscal Year 2016 Capital Items: $425,000
Funding Source Available:
Fund Transfer from Airport Reserves Fund 777 to Fund 778
Fund Transfer from Airport Reserves Fund 777 to Fund 779
FAA Grant – Federal Funding
FAA Grant – State Funding
Total Fund Sources
$ 12,375
$200,000
$202,500
$ 10,125
$425,000
Summary of Airport Projects:
•Runway 15-33 Pavement Rehabilitation & Taxiway
Realignment (Design)
$190,000
•PNC Calculation & Pavement Report $ 35,000
•Fuel Tank $200,000
10
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
A
IR
P
O
R
T
Runway 15-33 Pavement Rehabilitation & Taxiway Realignment (Design)
Estimated Project Costs
For FY 2016 $190,000
Status
Project Description: This is a FAA design grant and is part of a larger four year future project.
This project is needed to perform much needed pavement rehabilitation and taxiway
realignment. These changes have been identified on the newest Airport Layout Plan. The total
project is estimated at $2.5 million which will be paid for with additional FAA grant funds. The
estimated cost to the City will be approximately $33,000 annually over the next four years as
the project is built and will depend on future funding from the FAA.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
FAA Grant – Federal
FAA Grant – State
Airport Reserve (Fund 777)
171,000
8,550
10,450
$190,000
540,000
27,000
33,000
$600,000
540,000
27,000
33,000
$600,000
540,000
27,000
33,000
$600,000
643,500
32,175
39,325
$715,000
$2,434,500
121,725
148,775
$2,705,000
11
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
A
IR
P
O
R
T
PNC Calculation & Pavement Report
Project Description: Pavement Calculation Number (PCN) Calculation and
Pavement report is a FAA funded grant project that would allow staff to better
evaluate the current conditions of the airport runways and taxiways.
Estimated Project Costs
For FY 2016 $35,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
FAA Grant – Federal
FAA Grant – State
Airport Reserve (Fund 777)
31,500
1,575
1,925
$35,000
31,500
1,575
1,925
$35,000
12
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
A
IR
P
O
R
T
Fuel Tank
Estimated Project Costs
For FY 2016 $200,000
Status
Project Description:
Project Description: Over the past few years the airport had record numbers of fuel sales due to fires
in the area. Although the amount of fuel sold was abnormally high, the airport was unable at times to
keep up with the demands and needs of our customers for fuel. Increasing fuel capacities will provide
better service and increased revenue for the airport in. With the installation of a 12,000 gallon 100LL
(AVGAS) self-serve tank and the ability to store 25,000 gallons of jet A fuel, the airport will be able to
keep up with the high demands of fuel sales during the fire season.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Airport Reserve (Fund 777) $200,000 $200,000
13
This page intentionally left blank
14
CAPITAL BUDGET FISCAL YEAR 2015-2016
BUILDING MAINTENANCE
15
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
B
UI
L
D
I
N
G
M
AI
N
T
E
N
A
N
C
E
Capital Projects – Building Maintenance
Fiscal Year 2016 Capital Items: $100,000
Funding Source Available:
Equipment Reserve Funds-
22000000.38195 Building Maintenance Reserve
Total Funding Sources
$100,000
$100,000
Summary of Building Maintenance Projects:
Civic Center Annex Facia Renovation $ 30,000
Civic Center Front Lobby Redesign $ 45,000
Civic Center Entryway Renovation $ 25,000
16
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
B
UI
L
D
I
N
G
M
AI
N
T
E
N
A
N
C
E
Civic Center Annex Facia Renovation
Project Description:
Project Description: The facia on the Annex is in crucial need of
repair in order to prevent failure.
Estimated Project Costs
For FY 2016 $30,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve ( Fund 220) $30,000 $30,000
17
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
B
UI
L
D
I
N
G
M
AI
N
T
E
N
A
N
C
E
Civic Center Front Lobby Redesign
Project Description:
Project Description: Front lobby redesign to comply to current standards. Also
needed is a counter upgrade to better facilitate customer service.
Estimated Project Costs
For FY 2016 $45,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve ( Fund 220) $45,000 $45,000
18
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
B
UI
L
D
I
N
G
M
AI
N
T
E
N
A
N
C
E
Civic Center Entryway Renovation
Project Description: The tile work at the entrance to the Civic Center is
damaged and missing tiles in many places. These flaws create uneven
walkways and an unattractive appearance.
Estimated Project Costs
For FY 2016 $25,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $25,000 $25,000
19
This page intentionally left blank
20
CAPITAL BUDGET FISCAL YEAR 2015-2016
CONFERENCE CENTER
21
Capital – Conference Center
Fiscal Year 2016 Capital Items: $65,000
Unfunded
Funding Source Available:
No funding identified
Total Funding Sources
$ 0
$ 0
Summary of General Capital Projects:
Conference Center HVAC System Renovation $30,000
Unfunded
Conference Center Bathroom Efficiency Update $35,000
Unfunded
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
C
ON
F
E
R
E
N
C
E
C
EN
T
E
R
22
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
C
ON
F
E
R
E
N
C
E
C
EN
T
E
R
Conference Center HVAC System Renovation
Estimated Project Costs
For FY 2016 $30,000
Status Unfunded
Project Description: The HVAC unit that supports the Chardonnay & Riesling rooms
has permanently failed per the evaluation of a 3rd party contractor, making the rooms
un-rentable (due to no heat or air conditioning) in inclement weather. The entire 20+
year system needs full replacement. As funds allow, the remaining HVAC units will
need to be upgraded.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded $30,000 $30,000
23
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
C
ON
F
E
R
E
N
C
E
C
EN
T
E
R
Conference Center Bathroom Efficiency Update
Project Description:
Estimated Project Costs
For FY 2016 $35,000
Status Unfunded
Project Description: After opening in July of 1994, the public restrooms at the UVCC have never
been upgraded. With over twenty years of heavy use, the deterioration of the amenities and lack
of efficiency in fixtures bring them past their useful life. There will also be significant water
savings from replacing the twenty year old urinals (5), toilets (11), and sinks (8).
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded $35,000 $35,000
24
CAPITAL BUDGET FISCAL YEAR 2015-2016
ELECTRIC
25
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
LE
C
T
R
I
C
Capital Projects - Electric
Fiscal Year 2016 Capital Items: $4,745,000
Funding Source Available:
Electric Capital Improvement Project (CIP)Fund 801
(transfer from 800 Operations to 801 CIP Fund)
Total Fund Sources
$4,745,000
$4,745,000
Summary of Electric Capital Projects:
PCB Transformer Replacement $ 20,000
Pole – Replacements $ 15,000
Automated Meter Reading – AMI $1,990,000
AMI – Loading & Fault Locating $ 40,000
Communication Upgrades $ 80,000
Transformer Upgrades $ 25,000
State St Widening – Pole/Equipment Upgrades $ 40,000
#6 Reconductor and System Tap Protection $ -
(Continued) 26
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
LE
C
T
R
I
C
Capital Projects- Electric (Continued)
Digger Derrick $ 380,000
E-Truck $ 40,000
Foreman Truck $ 75,000
On-Call Sub Truck $ 40,000
Underground System Switching Upgrades/Oak Manor $ 180,000
Underground System Switching Upgrades/Leslie-Gobbi Vault $ 60,000
600 Amp Connector Replacement/Orchard Ave $ 10,000
Low Gap 200 & 600 Amp Upgrades $ 150,000
Perkins Street Underground Project – Phase 2 $ 180,000
Perkins Street Underground Project – Street Lighting $ 145,000
Substation Transformer #1 and #3 Repair $ 400,000
Hydro Electric Plant Seal Repair $ 175,000
Electric Service Center Improvements $ 700,000
27
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
PCB Transformer Replacement
Estimated Project Costs
For FY 2016 $20,000
Status
Project Description: A three year replacement of 14 overhead and pad
mounted transformers contaminated with low levels of Polychlorinated
Biphenyls (PCBs). Replacement will limit environmental concerns and
remove older units from service.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 20,000 30,000 30,000 $80,000
28
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Pole - Replacements
Estimated Project Costs
For FY 2016 $15,000
Status
Project Description:
Project Description: Remaining three year of an eight year wood pole
replacement program. In 2010, all wood poles were tested and approximately
220 poles were determined to require future replacement. On a scheduled
basis, wood poles are replaced based on their tested classification of
condition. Pole replacement insures system reliability and safety.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 15,000 50,000 50,000 50,000 $165,000
29
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Automated Meter Reading – AMI
Estimated Project Costs
For FY 2016 $1,990,000
Status
Project Description: FY 2016: Meter replacement program replacing approximately
8,100 meters with two-way communication and associated infrastructure to remotely
read usage, voltage and outage information. Provides the electric customer with near
real time usage information on a 24/7 basis. Significant improvement to system
reliability and outage restoration resulting in fewer & shorter outages.
FY 2017 & 2018: Anticipated system expansions and reinforcements.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital(Fund 801) 1,990,000 200,000 50,000 $2,240,000
30
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
AMI – Loading & Fault Locating
Estimated Project Costs
For FY 2016 $40,000
Status
Project Description: A three year program to install communication enabled fault
monitoring equipment that detects real time line loading, line voltage levels and
system faults. Will improve system performance and reliability of power delivered to
Ukiah customers.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 40,000 50,000 30,000 $120,000
31
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Communication Evaluation
Estimated Project Costs
For FY 2016 $80,000
Status
Project Description: Communication pilot program to develop machine to machine
and machine to operator communication system connecting the Electric Service
Center to various field equipment. Project includes a cost-performance evaluation
and possible deployment of fiber for electric system operation. Possible future
system expansion pending on a cost benefit analysis.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital(Fund 801) 80,000 $80,000
32
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Transformer Upgrades
Estimated Project Costs
For FY 2016 $25,000
Status
Project Description: Due to equipment age, condition and vintage, transformers
require replacement to insure operational reliability on a yearly basis.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital(Fund 801)
25,000 25,000 25,000 25,000 25,000 $125,000
33
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
State Street Widening – Pole Relocation
Estimated Project Costs
For FY 2016 $40,000
Status
Project Description: This capital expenditure cover the cost to relocate Electric
Department equipment, located in street right of way, due to City funded street
widening projects. Typically this may include street realignment, sidewalk widening,
lane additions or street improvement not part of a private development.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (fund 801) 40,000 40,000 40,000 40,000 40,000 $200,000
34
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
#6 Reconductor and System Tap Protection
Estimated Project Costs
For FY 2016 $0
Status
Project Description:
FY 2017: Conductor upgrades on east Brush St. and install line protection
equipment at various locations throughout the City to improve capacity and outage
coordination resulting in shorter and smaller power outages.
FY 2018: Replace No.6 conductor at various locations within the City and install line
protection equipment at various locations to improve capacity and outage
coordination resulting in shorter and smaller power outages.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) - 130,000 100,000 $230,000
35
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Digger Derrick
Estimated Project Costs
For FY 2016 $380,000
Status
Project Description: Purchase of a digger derrick line truck to retire an existing
similar truck. This truck is needed for additional reach capacity to set taller poles and
will satisfy the Air Resources Board (ARB) diesel motor compliance requirements.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 380,000 $380,000
*See Appendix for detailed justification.
36
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
E-Vehicle
Estimated Project Costs
For FY 2016 $40,000
Status
Project Description: Replaces a pickup fleet vehicle with a utility type hybrid or
electric vehicle that will be shared by engineering and administration staff. This
vehicle purchase will improve availability of staff to respond to customer field visits
reducing the need to dispatch a larger truck or line crew resulting in cost savings.
Department goal is to manage vehicle inventory while reducing carbon emissions
and improve customer service.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 40,000 $40,000
*See Appendix for detailed justification.
37
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Foreman Truck
Estimated Project Costs
For FY 2016 $75,000
Status
Project Description: Purchase Foreman’s crew cab or cab and a half truck used for
transporting poles and heavy equipment for overhead and underground line
construction. Truck will replace one existing utility fleet truck with no increase to the
fleet count.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 75,000 $75,000
*See Appendix for detailed justification.
38
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
On-Call Sub Truck
Estimated Project Costs
For FY 2016 $40,000
Status
Project Description: Replacement of one on-call utility cab and a half truck. The
existing truck has been unreliable and considering age and mileage it is
recommended to retire current unit. There is no net increase to utility fleet count.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital(Fund 801) 40,000 $40,000
*See Appendix for detailed justification.
39
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Underground System Switching Upgrades – Oak Manor
Estimated Project Costs
For FY 2016 $180,000
Status
Project Description: Replace selected transformers and install switching equipment
in the Oak Manor area. Over the last few years, Oak Manor customers have
experienced frequent and long term outages. This will be the first step in being able
to isolate problems to a small number of customers and restore power to the vast
majority while performing repairs.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 180,000 $180,000
40
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Underground System Switching Upgrades – Leslie-Gobbi Vault
Estimated Project Costs
For FY 2016 $60,000
Status
Project Description: Leslie-Gobbi Vault switching upgrade to provide the ability to
restore power between an overhead and underground systems in an efficient and
timely manor.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 60,000 $60,000
41
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
600 Amp Connector Replacement – Orchard Avenue
Estimated Project Costs
For FY 2016 $10,000
Status
Project Description: Inspect and replace main underground feeder connectors
located within underground vaults along Orchard Avenue.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 10,000 $10,000
42
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Low Gap 200 & 600 Amp Upgrades
Estimated Project Costs
For FY 2016 $150,000
Status
Project Description: Phase 2 completes the system upgrade in the west Low Gap
area. This phase includes the wire, switches and junction pedestals necessary to
complete the improvements that will provide better reliability, fewer number of
power interruptions, and shorter outages.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital(Fund 801) 150,000 $150,000
43
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Perkins Street Underground Project – Phase 2
Estimated Project Costs
For FY 2016 $180,000
Status
Project Description: Phase 2 will complete the electric overhead to underground
conversion work along Perkins Street between State Street and Hwy 101. This
phase includes the wire, switches, junction boxes and customer service panel
hookups needed to complete the conversion.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 180,000 $180,000
44
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Perkins Street Underground Project – Street Lighting
Estimated Project Costs
For FY 2016 $145,000
Status
Project Description: This work will complete the street light portion of the overhead
to underground conversion along Perkins Street between State Street and Hwy 101.
This phase includes the wire, junction boxes, fusing, equipment and labor needed to
complete the street lighting project.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital(Fund 801) 145,000 $145,000
45
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Substation Transformer #1 and #3 Repair
Estimated Project Costs
For FY 2016 $400,000
Project Description: Project will replace the 1) Low voltage bushings, 2) Repair
radiator valves and 3) Replace gaskets on 30 year old power transformers No.1 and
3 located at Orchard Substation. Bushings have failed testing (Unit No.1) and
gaskets are leaking. Work would replace all low voltage bushings, gaskets and
rebuilding valves. Recommended to insure continued operation of the transformers.
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric CApital (Fund 801) 400,000 $400,000
46
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
E
LE
C
T
R
I
C
Hydro Electric Plant Seal Repair
Estimated Project Costs
For FY 2016 $175,000
Status
Project Description: Replace tainter valve seal and brace gate as necessary. Project
will reduce the amount of water being bypassed and increases water going through
the turbines. The net effect would increase generation by 4-7 percent. Additionally,
gate maintenance is required to be in compliance with the JFERC permit.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 175,000 $175,000
47
Electric Service Center Improvements
Project Description: FY 2016 Phase 1: Electric Utility property located at 1350
Hastings work includes: site grading, fencing, roof repair and roll-up door repair.
Interior warehouse shelving, lighting and office remodel, crew restroom and shower
facilities, ready and training room design and improvements, site security, system
monitoring equipment and employee lunch area.
FY 2017 Phase 2: Interior upgrades to serve as the City’s Service Center: including
offices, conference/customer meeting facilities, reception area, energy
demonstration area, site paving, wire handling storage equipment and solar shade
structures.
Estimated Project Costs
For FY 2016 $700,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
LE
C
T
R
I
C
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Electric Capital (Fund 801) 700,000 700,000 $1,400,000
48
CAPITAL BUDGET FISCAL YEAR 2015-2016
ENGINEERING
49
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
NG
I
N
E
E
R
I
N
G
Capital Projects - Engineering
Fiscal Year 2016 Capital Items: $672,438
Funding Sources Available:
Special Projects Reserves (Fund 251)-
25100000.39001 Grant Match Reserve
25100000.39010 ADA Ramp Reserve
25100000.39011 Bridge Replacement Reserve
25100000.39038 Asset Management Software Reserve
Special Revenue (Fund 250):
25000000.43190 State Funding – Special Projects Fund
STP d(1) (Fund 509)
Total Funding Sources
$ 19,000
$ 50,000
$254,438
$ 60,000
$252,500
$ 36,500
$672,438
Summary of Capital Engineering Projects:
NWP Rail Trail (Phase 2 Gobbi St. to Commerce Dr.) $ 19,000
ADA – Ramps throughout the City $ 50,000
Orr Street Bridge reconstruction $254,438
Asset Management Software $ 60,000
Downtown Streetscape Improvement, Phase 1 (Design) $289,000
50
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
NG
I
N
E
E
R
I
N
G
NWP Rail Trail (Phase 2 – Gobbi St. to Commerce Dr.)
Project Description: Planning , design and construction of Phase 2 of the North West Pacific
(NWP) Rail Trail project between Gobbi St. and Commerce Dr.
FY 2016: Grant Match – City ($19,000)
FY 2017: Environmental & permits ($75,000); Plans & specifications ($200,000);and Right of
way ($25,000)
FY 2018: Construction management & inspections ($150,000) and Construction ($1,395,000)
Estimated Project Costs
For FY 2016 $19,000
Status Grant Application
Submitted on June 1,
2015
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251)
Cal Trans Grant
$19,000
$300,000 $1,531,000
$19,000
$1,831,000
$1,850,000
51
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
NG
I
N
E
E
R
I
N
G
ADA – Ramps Throughout the City
Project Description: Construct and replace non-compliant or non-existing ADA
ramps at various locations throughout the city
Estimated Project Costs
For FY 2016 $50,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251)
$50,000 $50,000
52
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
NG
I
N
E
E
R
I
N
G
Orr Street Bridge Reconstruction
Project Description: Reconstruction of the Orr Street Bridge over Orr Creek.
FY 2016: Environmental, Design & Permits
FY 2017: Construction
Estimated Project Costs
For FY 2016 $254,438
Status On Hold
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251) $254,438 $254,438
53
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
E
NG
I
N
E
E
R
I
N
G
Asset Management Software
Project Description: Renewal of ArcGIS License which is utilized by Electric, Water
and Sewer.
Estimated Project Costs
For FY 2016 $60,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251) $60,000 $60,000
54
Downtown Streetscape Improvement, Phase 1 (Design)
Project Description: FY 2016:Design funds for the Downtown Streetscape Improvement Project,
Phase 1. Phase 1 is State St (Henry to Mill) Standley (School to Main), Henry (School to State)
and Perkins (School to Main). Construction of planned improvements are budgeted in the Public
Works Street CIP.
Estimated Project Costs
For FY 2016 $289,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
E
NG
I
N
E
E
R
I
N
G
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Revenue Funds:
State Revenue HSIP (Fund 250)
State Revenue TE (Fund 250)
STP d(1) (Fund 509)
103,500
149,000
36,500
$289,000
103,500
$149,000
$36,500
$289,000
55
This page intentionally left blank
56
CAPITAL BUDGET FISCAL YEAR 2015-2016
FINANCE
57
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
F
IN
A
N
C
E
Capital Projects - Finance
Fiscal Year 2016 Capital Items: $117,524
Funding Source Available:
Equipment Reserve Fund:
22000000.38130 Finance – Misc.
22000000.38697 Finance – Utility Billing
(Includes transfer from Fund 205 Utility Billing for $100,000)
Total Fund Sources
$ 3,389
$ 114,135
$117,524
Summary of Finance Capital Projects:
Financial Software $ 117,524
58
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
F
IN
A
N
C
E
Financial Software
Project Description: Implementation of the Utility Billing Software to integrate to Munis
Estimated Project Costs
For FY 2016 $117,524
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220)
Equipment Reserve (Fund 220)
Total
3,389
114,135
$117,524
3,389
$114,135
$117,524
59
This page intentionally left blank
60
CAPITAL BUDGET FISCAL YEAR 2015-2016
FIRE
61
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
F
IR
E
Capital Projects – Fire
Fiscal Year 2016 Capital Items: $65,000
Funding Source Available:
Equipment Reserve Fund 220
22000000.38313 Fire - Equipment
Total Funding sources
$65,000
$65,000
Summary of Fire Capital Projects:
Replacement Funds for Fire Apparatus $207,223
(Funds are reserved in Fund 220. No request to expend these funds is requested for FY 2016.)
Replace SCBA Air Cylinders $15,000
Replace One Defibrillator $30,000
Replace Fire Hose $20,000
62
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
F
IR
E
Replacement Funds for Fire Apparatus
Estimated Project Costs
For FY 2016 $0
Status Reserve
Project Description: Set aside replacement funds Fire Apparatus. Apparatus replacement plan
needs to be updated. (Funds are reserved in fund 220 Fire Apparatus; $207,223 fiscal year 2016
contribution.)
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $0 $0
63
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
F
IR
E
Replace SCBA Air Cylinders
Estimated Project Costs
For FY 2016 $15,000
Status
Project Description: Replace 12 SCBA air cylinders needed for firefighters.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $15,000 $15,000 $30,000
64
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
F
IR
E
Replace One Defibrillator
Estimated Project Costs
For FY 2016 $30,000
Status
Project Description: Replace one defibrillator, this bring the total to twelve.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $30,000 $30,000
65
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
F
IR
E
Replace Old Fire Hose
Estimated Project Costs
For FY 2016 $20,000
Status
Project Description: Replace old fire hose.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $20,000 $20,000
66
CAPITAL BUDGET FISCAL YEAR 2015-2016
GARAGE
67
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
AR
A
G
E
Capital Projects – Garage
Fiscal Year 2016 Capital Items: $110,000
Funding Source Available:
Equipment Reserve Fund 220
22000000.38575 Garage Reserve
Total Fund Sources
$110,000
$110,000
Summary of Garage Capital Projects:
Replace Overhead Lube System $ 10,000
Replace Service Truck $100,000
68
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
G
AR
A
G
E
Replace Overhead Lube System
Project Description: Replace overhead lube system at the garage due to its age and
failing condition
Estimated Project Costs
For FY 2016 $10,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $10,000 $10,000
69
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
G
AR
A
G
E
Replace Service Truck
Project Description: Replace existing service truck due to its age and condition.
New service truck will have a service body, crane, and portable welder.
Estimated Project Costs
For FY 2016 $100,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220):
$100,000 $100,000
*See Appendix for detailed justification.
70
CAPITAL BUDGET FISCAL YEAR 2015-2016
GOLF COURSE
71
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
OL
F
C
OU
R
S
E
Capital Projects- Golf Course
Fiscal Year 2016 Capital Items: $155,000
Funding Sources Available:
Tayman Park Golf Course
Total Funding Sources
$155,000
$155,000
Summary of Golf Course Capital Projects:
Develop Water Source $75,000
Tee Reconstruction $10,000
Fairway & Collar Resurface $13,000
Replace Turf Heads, Valves etc. $18,000
Pro Shop & Todd Grove Room Improvements $29,000
Cart Path Repairs $10,000
All golf projects are funded and managed by Tayman Park
Golf per their lease agreement of the Course. 72
Develop Water Source
Project Description: Additional water for the course separate from the City’s potable water supply is
desired. Possible development of an onsite irrigation well if the City’s water source investigation
demonstrates a viability resource.
Funded & Managed by Tayman Park per lease agreement
Estimated Project Costs
For FY 2016 $75,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
OL
F
C
OU
R
S
E
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Tayman Park $75,000 $75,000
73
Project Description: Most of the current tee’s in use have flaws. There is an enough space to keep
them fresh throughout the playing months, but not all of the area is useable space. Each year, some
tees will be reconstructed including the removal of sod, flatten the entire teeing area and create
more useable space. This creates less work for staff and the tees will look great throughout the
season. Two tees are scheduled for reconstruction this year.
Funded & Managed by Tayman Park per lease agreement
Tee Reconstruction
Estimated Project Costs
For FY 2016 $10,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
OL
F
C
OU
R
S
E
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Tayman Park $10,000 $10,000 $10,000 $10,000 $10,000 $50,000
74
Project Description: Year 3 will continue fairway and collar resurface with sand and compost added
to improve soil makeup. The fairways, green bank and collars continue to improve the appearance
and playability of our course.
Funded & Managed by Tayman Park per lease agreement
Fairway & Collar Resurface
Estimated Project Costs
For FY 2016 $13,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
OL
F
C
OU
R
S
E
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Tayman Park $13,000 $13,000
75
Project Description: A total of 280 old worn out turf irrigation heads, valves, swing joints and nozzle
assembly units to date. Replacing worn out parts continues to improve the irrigation system.
Conditions on the course continue to improve and additional investment in this area will only be
positive. Improved revenue and water savings are now real.
Funded & Managed by Tayman Park per lease agreement
Replace Existing Turf Heads, Valves, Swing Joints, Nozzles & Controllers
Estimated Project Costs
For FY 2016 $18,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
OL
F
C
OU
R
S
E
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Tayman Park $18,000 $18,000
76
Project Description: The Pro Shop and Todd Grove Room improvement project will include HVAC
and patio upgrades. Three existing Units in the Pro Shop are far past their useful life and will be
replaced. New units will result in energy savings of up to 30%. Patio and ABC License upgrade will
improve food and beverage service.
Funded & Managed by Tayman Park per lease agreement
Pro Shop & Todd Grove Room A/C Units. Patio & License Upgrade
Estimated Project Costs
For FY 2016 $29,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
OL
F
C
OU
R
S
E
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Tayman Park $29,000 $29,000
77
Project Description: The disrepair of the cart paths are causing damage to the rental fleet and
private carts. Every year areas of the cart paths are scheduled for repair.
Funded & Managed by Tayman Park per lease agreement
Cart Path Repair
Estimated Project Costs
For FY 2016 $10,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
G
OL
F
C
OU
R
S
E
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Tayman Park $10,000 $10,000
78
CAPITAL BUDGET FISCAL YEAR 2015-2016
INFORMATION TECHNOLOGY
79
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Capital Projects – Information Technology
Fiscal Year 2016 Capital Items: $225,000
Funding Source Available:
Special Projects Reserve (Fund 251)
25100000.39046 I.T. Upgrades Reserve
Equipment Reserve (Fund 220)
22000000.38196 Computer Support Reserve
Total Fund Sources
$ 81,978
$ 143,022
$225,000
Summary of Information Technology Capital Projects:
Council Chambers Electronic Renovation $ 75,000
Access Point Wi-Fi (Civic Center and Annex) $ 20,000
Access Point Wi-Fi (for different sites after W-Wan is
installed)
$ 30,000
Cardlock System $ 15,000
Routers to Purchase for W-WAN Implementation $ 25,000
Switch/Router (end of life replacement) $ 40,000
Checkpoint Appliance for HA Cluster for Redundant Switch-
Over to Additional Gateway
$ 20,000
80
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Council Chambers Electronic Renovation
Estimated Project Costs
For FY 2016 $75,000
Status
Project Description: This will involve replacement of the current audio system, as well as the cameras
that are currently in place. The new cameras will offer much better operability and resolution. A podium
presenter will also be available for constituents and other parties to present their material to Council.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251) $75,000 $75,000
81
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Access Point Wi-Fi (Civic Center and Annex)
Estimated Project Costs
For FY 2016 $20,000
Status
Project Description: Access points will be placed in the Civic Center and Annex, allowing access to
the internet for employees and public. The current WiFi system is antiquated and at maximum
allowance for additional access points.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $20,000 $20,000
82
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Access Point Wi-Fi (for different sites after W-Wan is installed)
Estimated Project Costs
For FY 2016 $30,000
Status
Project Description:
Project Description: Meraki Access points will be placed at our external sites, giving employees
needed WiFi Access. This will provide WiFi traffic through our Internet Gateway, without affecting
other user traffic.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $30,000 $30,000
83
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Cardlock System
Estimated Project Costs
For FY 2016 $15,000
Status
Access Control
•Employee presents their card.
•Software reviews cards ID.
•If approved for access
•Door unlocks
Project Description: A card lock system, will ensure secure access to City of facilities.
Funding Souce
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $15,000 $15,000
84
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Routers to Purchase for W-WAN Implementation
Estimated Project Costs
For FY 2016 $25,000
Status
Project Description: As part of the implementation for our Wide Area Network sites, routers must be
purchased for point to point communication.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $25,000 $25,000
85
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Switch/Router (end of life replacement)
Estimated Project Costs
For FY 2016 $40,000
Status
Project Description: As part of our ongoing maintenance and support, switches and routers
reach“end of life” and need to be replaced to insure warranty and support coverage. An
average of 5-6 years is the approximate lifespan of network switches and routers.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $40,000 $40,000
86
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
I
NF
O
R
M
A
T
I
O
N
T
EC
H
N
O
L
O
G
Y
Checkpoint Appliance for HA Cluster Redundant Switch-Over
Estimated Project Costs
For FY 2016 $20,000
Status
Project Description:
Project Description: The Checkpoint appliance will allow for a fail-over scenario to a second
gateway when outages occur. This a secondary path is important for Public Safety applications
provided over the Internet.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220)
Special Project Reserve (Fund 251)
$13,022
$ 6,978
$20,000
$13,022
$ 6,978
$20,000
87
This page intentionally left blank
88
CAPITAL BUDGET FISCAL YEAR 2015-2016
MUSEUM
89
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
G
RA
C
E
H
UD
S
O
N
M
US
E
U
M
Capital Projects – Grace Hudson Museum
Fiscal Year 2016 Capital Items: Unfunded
Funding Source Available:
Unfunded
Total Funding Sources
$ 0
$ 0
Summary of Museum Capital Projects:
Grace Hudson Museum Roof Repair $25,000
Unfunded
90
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
G
RA
C
E
H
UD
S
O
N
M
US
E
U
M
Estimated Project Costs
For FY 2016 $25,000
Status Unfunded
Grace Hudson Museum Roof Repair
Project Description: The roof beams of the Grace Hudson Museum needs repair from years of water
damage caused by their exposure to normal winter weather. While undergoing repair, they will also
be modified so that this problem will not reoccur. In addition, there are currently two small leaks in
the Museum's metal corten roof. Until the roof is opened up in the summer to expose the underlying
paper and plywood, the extent of the needed repair is not known.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded $25,000 $25,000
91
This page intentionally left blank
92
CAPITAL BUDGET FISCAL YEAR 2015-2016
PARKS
93
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
AR
K
S
Capital Projects - Parks
Fiscal Year 2016 Capital Items: $2,954,463
Funding Source Available:
Prop 84 NEF Grant (Fund 310)
Housing Grant: Oak Manor Park Renovation
Habitat Conservation Fund Grant
Special Project Reserves (Fund 251)
25100000.39031-Cleveland Lane Drainage
Anton Reserve (Fund 301)
Total Funding Sources
$2,300,000
$ 142,800
$140,000
$160,000
$ 18,000
$2,760,800
Summary of Parks Capital Projects:
Replace Toro Groundsmaster 4000D $ 25,000
Unfunded
Replace Dodge D200 Utility Truck, ¾ Ton with Lift Gate $ 40,000
Unfunded
Anton Stadium Irrigation System Renovation $128,663
Unfunded
Anton Stadium Renovation $18,000
Oak Manor Park Renovation $142,800
Grace Hudson Cultural Center: Nature Education Grant $2,600,000 94
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
AR
K
S
Replace Toro Groundsmaster 4000D
Project Description:
Project Description: The existing 2001 Toro mower has exceeded its life expectancy as needed
repairs exceed its value. The mower is in need of multiple repairs including: the mower decks
need replacing or extensive fabrication work from over use; the electrical system is worn out
causing multiple call outs from the city garage to repair in the field; hydraulic deck rams need
replacing or rebuilding; the cooling system has problems causing extended mow times in order
to allow for cooling of engine; and does not comply with current C.A.R.B regulations resulting in
limited amount of hours allowed of use per year. This mower has had numerous repairs in its
life, increasing over the last few years. Now this mower spends numerous hours out of service.
Proposed replacement: 2015 commercial zero turning radius, rear discharge mower with a
minimum 72 inch wide mower deck, and complies with current C.A.R.B. standards.
Estimated Project Costs
For FY 2016 $25,000
Status Unfunded
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded $25,000 $25,000
*See Appendix for detailed justification.
95
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
AR
K
S
Replace Dodge D200 Utility Truck, ¾ Ton With Lift Gate
Project Description: The current vehicle is a 1989 Dodge D200 that has out lasted its normal life
expectancy; has 112,381 miles; current value estimated at $1500 or less. The existing vehicle
spends various hours out of use, due to needed repairs. Furthermore, the passenger door needs
replacing to open properly; the transmission slips; door and window seals leak letting rain water to
enter the cabin; the utility bed doors do not latch properly causing tools and supplies to be exposed to
elements, and contents spilling out in the roadway. The proposed replacement is a 2015 single rear
wheeled 1 ton service truck.
Estimated Project Costs
For FY 2016 $40,000
Status Unfunded
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded $40,000 $40,000
*See Appendix for detailed justification.
96
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
AR
K
S
Anton Stadium Irrigation System Renovation
Project Description: The aged irrigation system has failed and must be replaced. The replaced
system will increase water efficiency at the facility in addition to cutting out significant repairs and
maintenance costs .
Estimated Project Costs
For FY 2016 $128,663
Status Unfunded
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded $128,663 $128,663
97
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
AR
K
S
Anton Stadium Renovation
Project Description: Continued renovation of Anton Stadium including donor wall, press box and
field improvements.
Estimated Project Costs
For FY 2016 $18,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Anton Stadium (Fund 301) $18,000 $18,000
98
Oak Manor Park Renovation
Project Description: This grant funded through the Housing Related Parks Program will
renovate Oak Manor Park, including the walkways and picnic areas.
Estimated Project Costs
For FY 2016 $142,800
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
AR
K
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Housing Grant ( Fund 300) $142,800 $142,800
99
CAP
I
T
A
L
P
RO
J
E
C
T
-
P
AR
K
S
Estimated Project Costs
For FY 2016 $2,600,000
Status
Grace Hudson Cultural Center: Nature Education Grant
Project Description: The project has two separate components :
•NEF Prop 84 grant which is approximately 3 acres for the nature education gardens and parking.
•HCF grant is approximately 1 acre of construction for storm water treatment wetlands & drainage.
This project will construct a fully integrated campus that is an extension of the museum facility. Develop four acres of grounds;
expand parking lot, install fencing, landscaping, and outdoor exhibits focusing on native plants and animals. Teach about
Pomo Indian cultural landscape practices and demonstrate modern day sustainable landscape practices with the use of rain
water cisterns, bio-swales, storm water treatment systems, and green building techniques. This is a joint project with Public
Works to construct storm water treatment facilities.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Prop 84 (Fund 310)
HCF* Grant (Fund 300)
Special Project Reserve (Fund 251)
2,300,000
140,000
160,000
$2,600,000
240,000 $2,540,000
140,000
$160,000
$2,840,000
*HCF- Habitat Conservation Fund; 300 fund Series TBD
100
CAPITAL BUDGET FISCAL YEAR 2015-2016
POLICE
101
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
OL
I
C
E
Capital Projects – Police
Fiscal Year 2016 Capital Items: $120,000
Funding Source Available:
Equipment Reserve (Fund 220)
22000000.38201 Police Reserve
22000000.30007 Equipment Reserve – Undesignated
Total Funding sources
$ 41,030
$ 78,970
$120,000
Summary of Police Capital Projects:
2 Patrol Vehicles $60,000 each $120,000
102
CAP
I
T
A
L
P
RO
J
E
C
T
S
-
P
OL
I
C
E
2 Patrol Vehicles $60,000 Each
Estimated Project Costs
For FY 2016 $120,000
Status
Project Description: Replace two fully equipped police vehicles annually which currently cost
$60,000 each. This cost includes light bars and Fiberglass back seats.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220)
Equipment Reserve (Fund 220 interest)
Unfunded
$41,030
$78,970
$120,000
$120,000
$120,000
$120,000
$120,000
$120,000
$120,000
$120,000
$120,000
$41,030
$78,970
$480,000
$600,000
*See Appendix for detailed justification.
103
This page intentionally left blank
104
CAPITAL BUDGET FISCAL YEAR 2015-2016
STORM DRAIN
105
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TO
R
M
D
RA
I
N
Capital Projects – Storm Drain
Fiscal Year 2016 Capital Items:
Unfunded
$ 50,617
$124,383
$175,000
Funding Source Available:
Special Project Reserve (Fund 251)
25100000.39027
Total Funding Sources
$ 50,617
$ 50,617
Summary of Storm Capital Projects:
Storm Drain $175,000
Partially Funded
106
Fairgrounds Storm Drain
Project Description: Replace failing storm drain line at the 12th District Fairgrounds.
Estimated Project Costs
For FY 2016 $175,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TO
R
M
D
RA
I
N
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251)
Unfunded
Total
$50,617
$124,383
$175,000
$50,617
$124,383
$175,000
107
This page intentionally left blank
108
CAPITAL BUDGET FISCAL YEAR 2015-2016
STREETS
109
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Capital Projects – Streets
Fiscal Year 2016 Capital Items: $7,717,160*
Funding Sources Available:
Traffic Congestion Relief (Fund 510)
Special Revenue (Fund 250)
STP d(1) (Fund 509)
1998 STIP (Fund 507) (MCOG reimbursable)
Pedestrian Safety – Sidewalks/Crosswalks
Traffic Signal at N. State St. & Low Gap Rd./Bush St.
Special Projects Reserves (Fund 251)
25100000.30007 Undesignated Reserve
25100000.39021 Smith St Repairs Reserve
25100000.39049 Un-Federalized Reserve
25100000.39050 Un-Federalized Reserve
Total Funding Sources
$ 400,000
$1,951,500
$ 350,500
$ 227,000
$ 100,000
$ 865,190
$ 33,049
$ 21,951
$ 313,249
$ 347,770
$3,645,019
*Total Capital Street project Requests are $7,716,160
With only $3,645,019 available for these projects. The funding source for Talmage
Road project build out of the Business Park. Estimated at $2.9 million has to be
determined and is critical for the Costco Project. Staff will need council direction to
consider either an internal loan or funding through I-bank if redevelopment funds are
not available. (Continued) 110
Capital – Streets
Fiscal Year 2016 Capital Items: (continued) $7,717,160
Gobbi/Waugh Traffic Signal $ 112,000
Low Gap/Bush Roundabout $ 115,000
Overlay Streets $ 200,000
Downtown Streetscape Construction – HSIP & TE $2,302,000
Slurry Seal Various Streets $ 200,000
Talmage Rd. & US 101 Interchange Improvements $1,700,000
Unfunded
Redwood Business Park Transportation
Improvements
$1,200,000
Unfunded
Smith Street sidewalk/curb/gutter $ 21,951
Street Reconstruction $ 661,019
Replace Street Sweeper $ 240,000
Partially funded
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
111
Capital – Streets
Fiscal Year 2016 Capital Items: (continued)
Pedestrian Safety – Sidewalks/Crosswalks $ 100,000
Unfunded
Traffic Signal Lane at N.State St. and Low Gap $ 865,190
Unfunded
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
112
Gobbi/Waugh Traffic Signal
Project Description: Design and Construct traffic signal on East Gobbi Street at Waugh Lane
FY 2016; Environmental & Permits ($2,000); Plans & Specifications ($90,000) Right of Way
($20,000)
FY 2017: Construction ($532,000); City construction match ($72,000)
Estimated Project Costs
For FY 2016 $112,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
STIP (Fund 507) MCOG
STP d(1) (Fund 509)
112,000 532,000
72,000
$604,000
$644,000
$72,000
$716,000
113
Low Gap/Bush Roundabout
Project Description: Design and construct a roundabout at the intersection of North Bush Street
and Low Gap Road
FY 2016: Environmental and Permits ($5,000); Plans & Specifications ($85,000); Right of Way
($25,000)
FY 2017: Construction ($703,000); City Construction Match ($78,000)
Estimated Project Costs
For FY 2016 $115,000
Status On Hold
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
STIP (Fund 507) - MCOG
STP d (1) (Fund 509)
115,000
$115,000
703,000
78,000
$781,000
$818,000
$78,000
$896,000
114
Overlay Streets
Project Description: Overlay various streets as determined by the Pavement Management
Program
Estimated Project Costs
For FY 2016 $200,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Traffic Congestion Relief (Fund 510)
$200,000 $200,000
115
Downtown Streetscape Construction – Highway Safety Improvement Program (HSIP),
Transportation Enhancement (TE)
Project Description: Construction of the Downtown Streetscape Improvement Project, Phase 1.
Phase 1 is State St (Henry to Mill) Standley (School to Main), Henry (School to State) and Perkins
(School to Main). Project included roadway, traffic signal, on-street parking and sidewalk related
improvements. Design for the project is funded in the Public Works Engineering CIP.
Estimated Project Costs
For FY 2016 $2,302,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
State Revenue HSIP (Fund 250)
State Revenue TE (Fund 250)
STP d(1) (Fund 509)
Total
796,500
1,155,000
350,500
$2,302,000
796,500
1,155,000
350,500
$2,302,000
116
Slurry Seal Various Streets
Project Description: Slurry Seal various streets as determined by the Pavement Management
Program
Estimated Project Costs
For FY 2016 $200,000
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Traffic Congestion Relief (Fund 510) $200,000 $200,000
117
Talmage Rd & US 101 Interchange
Project Description: Construct interchange improvements at the intersection of Talmage Road
and US HWY 101.
(The City will need to seek funding for this project from I-Bank if the state will not allow use of
redevelopment bonds.)
Estimated Project Costs
For FY 2016 $1,700,000
Status To Be Determined
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
I-Bank (Unfunded) $1,700,000 $1,700,000
118
Redwood Business Park Transportation Improvements
Project Description: Construct improvements at the intersection of Talmage Road and Airport
Blvd.; construct traffic signal at Airport Park Blvd & Commerce Dr.; construct minor widening
near the south end of Airport Park Blvd.; and construct minor widening on Hastings Ave at S.
State St.
(The City will need to seek funding for this project from I-Bank if the state will not allow use of
redevelopment bonds.)
Estimated Project Costs
For FY 2016 $1,200,000
Status To be Determined
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
I-Bank (Unfunded) $1,200,000 $1,200,000
119
Smith Street Sidewalk/Curb/Gutter
Project Description: Replace Smith Street sidewalk, curb and gutter
Estimated Project Costs
For FY 2016 $21,951
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251) $21,951 $21,951
120
Street Reconstruction (Luce Ave., Observatory Ave. & Washington Ave.)
Project Description: Reconstruct Washington Ave. from South State St. to S. Dora St., Luce
Ave. from Helen St. to S. State St., Observatory Ave. from Helen St. to S. State St.
Estimated Project Costs
For FY 2016 $661,019
Status
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Projects Reserve (Fund 251) $661,019 $661,019
121
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Replace street sweeper
Project Description: Replace one existing street sweeper due to its age, condition and fueling
issues.
Estimated Project Costs
For FY 2016 $240,000
Status Partially Funded
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Special Project Reserve (Fund 251)
Unfunded
Total
$33,049
$206,951
$240,000
$33,049
$206,951
$240,000
*See Appendix for detailed justification.
122
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Pedestrian Safety – Sidewalks/Crosswalks
Project Description: This project will construct sidewalks adjacent to the City of Ukiah property.
In addition this project will construct improvements to provide better awareness of crosswalks.
Improvements at crosswalks may include advance yield signage and markings (show in photo)
and rectangular rapid flashing beacons. (N. State St. crosswalk at Fairgrounds.)
Estimated Project Costs
For FY 2016 $ 100,000
Status Unfunded
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded
123
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
S
TR
E
E
T
S
Traffic Signal at N. State St. and Low Gap Road/Brush Street
Project Description: This project would construct an eight phase traffic signal which includes
separate left turn phases for north-south and east-west traffic. The curb radius would be enlarged
at all four corners including construction of new ADA curb ramps. New traffic signal poles with new
signal heads will be constructed to fit the new intersection configuration. Brush street would be
widened along the south frontage. Sidewalk, curb, and gutter will be constructed along Brush
Street.
Estimated Project Costs
For FY 2016 $ 865,190
Status Unfunded
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Unfunded
124
CAPITAL BUDGET FISCAL YEAR 2015-2016
WASTEWATER
125
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Capital Projects- Wastewater
Fiscal Year 2016 Capital Items: $3,624,961
Funding Sources Available:
Sewer Operating (Fund 840)
Equipment Reserve (Fund 220)
22000000.38612- Sewer
Prop 84 Funding Round 2 (Fund 607)
Prop 84 Drought Funding ( Fund 607)
Sewer Capital (Fund 844)
Total Funding Sources
$ 250,000
$ 200,000
$ 400,000
$1,690,191
$1,084,770
$3,624,961
Summary of Wastewater Capital Projects:
Replacement of AWWT Feed Pump Motors $ 90,000
Chlorine Mixer $ 40,000
Manhole Replacement $ 15,000
Air Compressor $ 15,000
Vactor Replacement $200,000
Replace Truck at WWTP $ 30,000
Portion of Service Truck W/S Operations (50% Water) $ 30,000
Replace Hoses on 2 Vactors (50% Water) $ 10,000
(Continued) 126
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Capital Projects - Wastewater
Fiscal Year 2016 Capital Items (continued):
Sewer Nozzles for 2 Vactors $ 20,000
Recycled Water System Phases 1 & 2 $2,090,191
Main Replacements – Luce and Observatory $ 400,000
Inflow/Infiltration $ 150,000
System Maintenance $ 64,770
Emergency/Contingency $ 45,000
UVSD Litigation $ 300,000
UVSD Detachment EIR $ 125,000
127
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Replacement of AWWT Feed Pump Motors
Project Description: Replace feed pump motors at the Advanced Waste Water Treatment System.
Estimated Project Costs
For FY 2016 $90,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $90,000 $90,000
128
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Chlorine Mixer
Project Description: Purchase a chlorine mixer for installation prior to the injection point before the
chlorine contact basin.
Estimated Project Costs
For FY 2016 $40,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $40,000 $40,000
129
CAP
I
T
A
L
P
RO
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Manhole Replacement
Project Description: Replace various manholes throughout the sewer collection system due to age
and condition.
Estimated Project Costs
For FY 2016 $15,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $15,000 $15,000
130
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Air Compressor
Project Description: Purchase a new portable air compressor for the Water/Sewer Operations Division
(50% Water) ;Total Project $30,000.
Estimated Project Costs
For FY 2016 $15,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $15,000 $15,000
131
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Vactor Replacement
Project Description: Replace an existing Vactor truck with a new one due to CARB emission
requirements and age (50% Water) ;Total $400,000.
Estimated Project Costs
For FY 2016 $200,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $200,000 $200,000
*See Appendix for detailed justification.
132
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Replace Truck at WWTP
Project Description: Replace Dodge Truck at the Wastewater Treatment Plant due to age, mileage
and condition.
Estimated Project Costs
For FY 2016 $30,000
Status
Fun
ding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $30,000 $30,000
*See Appendix for detailed justification.
133
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Portion of Service Truck W/S Operations (50% Water)
Project Description: Purchase new service truck for the Water/Sewer Operations
Division (50% Water); Total $60,000.
Estimated Project Costs
For FY 2016 $30,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $30,000 $30,000
*See Appendix for detailed justification.
134
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Replace Hose on 2 Vactors (50% Water)
Project Description: Replace jetter hose on 2 vactors due to normal wear.
Total $10,000.
Estimated Project Costs
For FY 2016 $10,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $10,000 $10,000
135
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Sewer Nozzles for 2 Vactors
Project Description: Purchase 3 new nozzles for the jetter hoses on 2 Vactors.
Estimated Project Costs
For FY 2016 $20,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 840) $20,000 $20,000
136
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Recycled Water System Phases 1 & 2
Estimated Project Costs
For FY 2016 $2,090,191
Status
Project Description: Phases 1 and 2 of the Recycled Water System.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Prop 84 Funding(Fund 607)
Unfunded
Total
$2,090,191
$2,090,191
$17,152,000
$17,152,000
$2,090,191
$17,152,000
$19,242,191
137
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
WAS
T
E
W
A
T
E
R
Main replacements – Luce and Observatory
Estimated Project Costs
For FY 2016 $400,000
Status
Project Description: Replace sewer mains on Luce and Observatory Avenues due to age and
condition.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 844) $400,000 $400,000
138
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Inflow/infiltration
Estimated Project Costs
For FY 2016 $150,000
Status
Project Description: Sewer Lining project to reduce inflow and infiltration into the Sewer
Collection System.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 844) $150,000 $150,000
139
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
System maintenance
Estimated Project Costs
For FY 2016 $64,770
Status
Project Description: Various sewer main repair projects that are needed on an annual basis.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer capital (Fund 844) $64,770 $64,770
140
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
Emergency/Contingency
Estimated Project Costs
For FY 2016 $45,000
Status
Project Description: Various emergency repairs that require immediate repair by contractors.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 844) $45,000 $45,000
141
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
UVSD Litigation
Estimated Project Costs
For FY 2016 $300,000
Status
Project Description: Continued litigation with the Ukiah Valley Sanitation District in
regards to the pending lawsuit filed against the City.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 844) $300,000 $300,000
142
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AS
T
E
W
A
T
E
R
UVSD Detachment EIR
Estimated Project Costs
For FY 2016 $125,000
Status
Project Description: Costs related to detaching the Ukiah Valley Sanitation
District from within the City Limits.
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Sewer Capital (Fund 844) $125,000 $125,000
143
This page intentionally left blank
144
CAPITAL BUDGET FISCAL YEAR 2015-2016
WATER
145
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Capital Projects – Water
Capital Items: $4,430,000
Funding Sources Available:
Water Capital Improvement Project (Fund 822)
Prop 84 Grant (Fund 607)
Millview County Water District (Fund 607)
Willow Water District (Fund 607)
Equipment Reserve (Fund 220)
22000000.38820-Water
Total Funding Sources
$4,167,500
$ 125,000
$ 31,250
$ 31,250
$ 75,000
$4,430,000
(Continued) 146
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Capital Projects – Water
Capital Items: (continued)
Summary of Water Capital Projects:
Additional Pipeline Improvements $450,000
Develop New Well #4 $1,400,000
Replace 100,000 Gallon PZ2s Reservoir $300,000
Millview/Ukiah Intertie $125,000
Willow/Ukiah Intertie $125,000
Well #9 $1,500,000
Connect Chlorine at WTP $200,000
Air compressor $15,000
Service Truck – WTP $45,000
Water Meter Replacement $40,000
Portion of Service Truck (50% Wastewater Fund) Total $60,000 $30,000
Vactor replacement (50% Wastewater Fund) Total $400,000 $200,000
147
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Additional Pipeline Improvements
Project Description: Replace water mains due to repeated breaks, age or type of material on Luce,
Observatory, and Washington Reconstruction.
Estimated Project Costs
For FY 2016 $450,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital (Fund 822) $450,000 $700,000 $700,000
148
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Develop New Well #4
Project Description: Abandon existing Water Well #4 and drill a new water
well and install a monitoring well on the existing site; Total $1,900,000
($500,000 scheduled for FY 2015).
Estimated Project Costs
For FY 2016 $1,400,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital (Fund 822) $1,400,000 $1,400,000
149
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Replace 100,000 Gallon PZ2s Reservoir
Project Description: Replace the existing 100,000 gallon reservoir at Pressure Zone 2 with a new
reservoir.
Estimated Project Costs
For FY 2016 $300,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital (Fund 822) $300,000 $700,000 $1,000,000
150
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Millview/Ukiah Intertie
Project Description: Construct and upgrade existing intertie. This project will be partially funded with grant funds
awarded through Prop 84.
Estimated Project Costs
For FY 2016 $125,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital( Fund 822)
Prop 84 Grant(Fund 607)
Millview (Fund 607)
Total
$31,250
$62,500
$31,250
$125,000
$31,250
$62,500
$31,250
$125,000
151
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Willow/Ukiah intertie
Project Description: Construct and upgrade existing intertie. This project will be partially funded with grant funds
awarded through Prop 84.
Estimated Project Costs
For FY 2016 $125,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital( Fund 822)
Prop 84 Grant(Fund 607)
Willow(Fund 607)
Total
$31,250
$62,500
$31,250
$125,000
$31,250
$62,500
$31,250
$125,000
152
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Well #9
Project Description: Drill new Water Well #9. A portion of this project will be funded through grant
funds received through Prop 84.
Estimated Project Costs
For FY 2016 $1,500,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital (Fund 822) $1,500,000 $1,500,000
153
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Connect Chlorine at WTP
Project Description: Design and construct sodium hypochlorite facilities to replace the chlorine
gas system at the Water Treatment Plant.
Estimated Project Costs
For FY 2016 $200,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital(Fund 822) $200,000 $200,000
154
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Air Compressor
Project Description: Purchase a new portable air compressor for the Water/Sewer Operations
Division (50% Wastewater); Total $30,000.
Estimated Project Costs
For FY 2016 $15,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital (Fund 822) $15,000 $15,000
155
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Service Truck - WTP
Project Description: Replace Service truck at the Water Treatment Plant.
Estimated Project Costs
For FY 2016 $45,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve (Fund 220) $45,000 $45,000
*See Appendix for detailed justification
156
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Water Meter Replacement
Project Description: Replace and upgrade various water meters that have failed or are past their
useful life.
Estimated Project Costs
For FY 2016 $40,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital (Fund 822) $40,000 $1,000,000 $1,250,000 $2,210,000 $4,500,000
157
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Portion of Service Truck (50% Wastewater Fund)
Project Description: Purchase new service truck for the Water/Sewer Operations Division (50%
Wastewater) ;Total $60,000.
Estimated Project Costs
For FY 2016 $30,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Equipment Reserve(Fund 220) $30,000 $30,000
*See Appendix for detailed justification.
158
CAP
I
T
A
L
PR
O
J
E
C
T
S
–
P
UB
L
I
C
W
OR
K
S
W
AT
E
R
Vactor Replacement (50% Wastewater Fund)
Project Description: Replace an existing Vactor truck with a new one due to CARB
emission requirements and age (50% Wastewater); Total $400,000.
Estimated Project Costs
For FY 2016 $200,000
Status
Funding Source
Funding Source Actuals
FY 2016
Funding
Request
FY 2016
Anticipated
Request
FY 2017
Anticipated
Request
FY 2018
Anticipated
Request
FY 2019
Anticipated
Request
FY 2020
TOTAL
Water Capital (Fund 822) $200,000 $200,000
*See Appendix for detailed justification.
159
This page intentionally left blank
160
CAPITAL BUDGET FISCAL YEAR 2015-2016
APPENDIX
FLEET VEHICLE JUSTIFICATIONS
161
Digger Derrick Truck Justification
Proposed Vehicle: 2016 Freightliner 6x4 with an Altec Boom and Body
Department: Electric Utility
Area of use: Construction
Prepared by: Diann Lucchetti
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used for heavy overhead and underground line
construction, wood pole transport and installation, pole removal and
emergency response.
Due to California Air Resources Board (CARB) restrictions, the existing truck is
limited to an average of 150 operating hours per year and is being used for
emergency response only. Average truck usage is between 700 and 1100
hours per year.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is a 1987 Ford F800 Digger Derrick, #2121, with
17,000 miles.
Funding: Electric Capital (fund 801)
Estimated value: $3,500
Currently the vehicle does not comply with CARB standards for daily/weekly
construction activities.
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in fair to poor mechanical
condition.
Maintenance Costs: For the past year this vehicle has incurred
approximately $7,500 in maintenance costs.
162
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
None
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
2016 Freightliner 6x4 with Altec Boom and Body
COST - $380,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Alternative fueled vehicles for this type of use are not readily available.
4.2 CARB STANDARDS
CARB STANDARDS
This purchase will comply with CARB regulations.
Out of Service Time: This vehicle was out of service for 25 hours over the
past fiscal year.
Parts Availability: Parts are no longer available from the factory.
Associated Safety Issues: None
163
E-Vehicle Justification
Proposed Vehicle: 2016 Sport Utility Vehicle (SUV), Hybrid or Electric
Department: Electric Utility
Area of use: Engineering & Administration Staff
Prepared by: Diann Lucchetti
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used daily for engineering and administrative staff to
perform site inspections for engineering and construction projects. The SUV
will provide additional passenger capacity and will reduce the need to dispatch
crews resulting in a cost reduction.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
A small cab 1990 Isuzu pick up, #3241 with 107,000 miles.
Funding Source: Electric Capital (fund 801)
Estimated Value: $2,500
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in good to poor condition.
Maintenance Costs: Estimated at $740 per year.
Out of Service Time: This vehicle was out of service for 1 day over the past
fiscal year.
Parts Availability: Parts are no longer available from the factory.
Associated Safety Issues: None
164
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
None
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
2016 Sport Utility Vehicle (SUV), Hybrid or Electric
COST - $40,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
The proposed vehicle will be either a hybrid or an electric vehicle.
4.2 CARB STANDARDS
CARB STANDARDS
This purchase will comply with all CARB standards.
165
Foreman Truck Justification
Proposed Vehicle: 2016 One Ton Crew Cab Truck with Electric Material Hauling Racks and
Service Body
Department: Electric Utility
Area of use: Construction
Prepared by: Diann Lucchetti
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will replace a 1997 ¾ ton truck used for personnel and material
transport. This vehicle is at the end of its useful life and has limited ability to
transport materials. The Department is in need of a multi-purpose equipment
and material transport truck that will improve crew efficiency. Lower costs can
be achieved with the added ability of line construction material storage and the
ability to transport poles and transformers. Additional personnel can be carried
eliminating the need for additional vehicles.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is #3711, a 1997 2500 GMC service truck with
109,000 miles on it.
Funding: Electric Capital (fund 801)
Estimated Value: $2,500
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in fair condition.
Maintenance Costs: For the past year this vehicle has incurred
approximately $1,247 in maintenance costs.
Out of Service Time: Four days in the last fiscal year.
Parts Availability: Parts are no longer available from the factory.
166
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
None
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
2016 One ton crew cab truck with electric material hauling racks and service body
COST - $75,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Alternative fueled vehicles for this type of use are not readily available.
4.2 CARB STANDARDS
CARB STANDARDS
The purchase will comply with all CARB regulations.
Associated Safety Issues: None
167
On-Call Sub Truck Justification
Proposed Vehicle: 2016 3/4 Ton Super Cab Truck with Electric Material Hauling Racks and
Service Body
Department: Electric Utility
Area of use: Construction and Maintenance
Prepared by: Diann Lucchetti
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle is assigned to hydro and substation operations and is used for
after-hours emergency response and daily construction maintenance activities.
Maintenance tools, test equipment and plant drawings will be commonly stored
on this truck.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is #3712, a 2003 Ford F250 service truck with
79,000 miles on it.
Funding: Electric Capital (fund 801)
Estimated Value: $4,000
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in fair condition except for
the service body which is in unacceptable condition due to water leaks that
have been unrepairable since purchase.
Maintenance Costs: For the past year this vehicle has incurred
approximately $1,025 in maintenance costs.
Out of Service Time: This vehicle was out of service for 13 hours over the
last fiscal year.
Parts Availability: Parts are no longer available from the factory.
168
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
None
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
2016 ¾ ton super cab truck with electric material hauling racks and service body.
COST - $40,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Alternative fueled vehicles for this type of use are not readily available.
4.2 CARB STANDARDS
CARB STANDARDS
The purchase will comply with all CARB regulations.
Associated Safety Issues: None
169
Replace Service Truck Justification
Proposed Vehicle: Ford F-450, 1 Ton, 2WD Truck
Department: Public Works
Area of use: Garage Division
Prepared by: Jarod Thiele, PW Project Analyst and Dave Kirch, Senior Equipment Mechanic
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used daily for all operations of the Municipal Garage as well
as pulling motors at the Wastewater Treatment Plant.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is city vehicle #2631, a 1996 Ford F450 with
service body. The service bed on this service truck is a 1978 model. This
vehicle is in fair to poor condition.
Funding: Equipment Reserve (fund 220)
Estimated Value: $4,500
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in fair to poor mechanical
condition.
Maintenance Costs: For the past year this vehicle has incurred
approximately $3,000 in parts and labor costs.
Out of Service Time: This vehicle was out of service for one day over the
past fiscal year.
Parts Availability: Yes, some parts are available from the factory.
Associated Safety Issues: The crane was manufactured in 1978 and is in
poor condition and is currently not safe to operate.
170
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
There are no vehicles in the city fleet available to replace this vehicle.
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
One new 2015 Ford F-450, 1 ton, 2WD pickup with Scelzi Mechanic bed, 3,000 lb
crane, Miller Trailblazer 302 welder/generator/compressor or equal.
COST - $100,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
An alternative fueled vehicle such as CNG is not recommended due to the amount of
time it is used for maintenance of the Waste Water Treatment Plant. A CNG fuelled
vehicle would require a rapid fill CNG fueling station. The added expense of
constructing a CNG fueling station is not economically feasible at this time.
4.2 CARB STANDARDS
CARB STANDARDS
This vehicle is exempt from CARB standards.
171
Replace Toro Groundmaster
4000D Justification
Proposed Vehicle: Toro Grounds Master, Commercial Zero Turn Radius Mower
Department: Parks
Area of use: Throughout the City of Ukiah
Prepared by: Jarrod Meyer
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
The proposed replacement mower will be used on a weekly basis to mow turf
areas and prep sports and recreation areas.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The current mower, city vehicle #5401, is a 2001 Toro Grounds Master 4000D
with 2513 hours.
Funding: unfunded
Estimated Value: $1,500 with current CARB regulations and condition.
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: The mower is in need of multiple repairs.
The mower decks need replacing or extensive fabrication work from over use;
the electrical system is worn out causing multiple call outs from the city
garage to repair in the field; hydraulic deck rams need replacing or rebuilding;
the cooling system has problems causing extended mow times in order to
allow for cooling of engine; does not comply with current CARB regulations
resulting in limited amount of hours allowed of use per year.
Maintenance Costs: This mower has had numerous repairs in its life, with a
total repair cost of $1,756.51 over the last reported three years.
Out of Service Time: This mower spends a substantial time out of service.
172
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
None known
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
2015 commercial zero turning radius, rear discharge mower with a minimum 72 inch
wide mower deck and complies with current CARB standards. This mower will be used
an estimated 250 hours per year depending on weather. Staff estimates the useful life
to be 8 to 10 years
COST - $25,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Some available at a higher cost.
4.2 CARB STANDARDS
CARB STANDARDS
The proposed mower will comply with current off road, low horse power CARB
standards.
Parts Availability: Yes, most parts are available from dealer.
Associated Safety Issues: None
173
Replace Dodge Utility ¾ Ton
with Lift Gate Justification
Proposed Vehicle: New Single Rear Wheeled 1 Ton Service Truck
Department: Parks
Area of use: Throughout the City of Ukiah
Prepared by: Jarrod Meyer
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
The proposed vehicle will be used on a daily basis to haul trimmings, prunings,
dirt, rock, sand, etc. as well as tow equipment to work sites. This truck will also
be used during public events and other general City service needs.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The current city vehicle #3731 is a 1989 Dodge D200 that has outlived its
normal life expectancy with 112,381 miles.
Funding: unfunded
Estimated Value: $1,500 or less.
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: The existing vehicle spends various times
out of use due to needed repairs. The passenger door needs to be replaced
to open properly, the transmission slips, the door and window seals leak
allowing rain water to enter the cabin, the utility bed doors do not latch shut
properly causing tools and supplies to be exposed to elements, rusting and
deteriorating, as well as the possibility of the doors coming open and contents
spilling out in the roadway.
Maintenance Costs: This vehicle has had normal maintenance costs
throughout its life, with minimal unexpected repairs. City garage staff
estimates, from recent repair records, the service cost of this vehicle to be
$1.00 per mile for the last 10,000 miles.
174
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
None
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
2015 single rear wheeled 1 ton service truck, Dodge D200. This replacement vehicle
will be used an estimated amount of 6,000 to 8,000 miles per year. The estimated
useful life for this vehicle is 15 years or more.
COST - $40,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Some available at a higher cost.
4.2 CARB STANDARDS
CARB STANDARDS
This truck is a gasoline engine and meets the current California smog standards.
Out of Service Time: This truck spent various times out of service including
8 times in the last 10,000 miles for various repairs with shop time at 45 hours
Parts Availability: Yes, mechanical parts available from parts stores, other
parts only available from wrecking yards.
Associated Safety Issues: Cabin doors do not open properly. Utility bed
doors do not latch closed properly.
175
2 Patrol Vehicles (Police Patrol Car #1)
Justification
Proposed Vehicle: Police Patrol Car #1
Department: Police
Area of use: Patrol
Prepared by: Chris Dewey
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle is needed for daily police patrol operations.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is #4146, a 2007 Ford Crown Victoria with 97454
miles on the odometer. This vehicle is in poor condition.
Funding: Equipment Reserve (fund 220)
Estimated Value: $2,000
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: These police vehicles have significant
mileage of high demand police activities. After 100,000 miles, police vehicles
begin to suffer from cracked frames and other significant structural issues.
Maintenance Costs: Vehicle maintenance records indicate the department
has spent $17,992.45 in parts and labor, maintaining vehicle #4146 over the
life of the vehicle
Out of Service Time: City vehicle #4146 was out of service a total of
2791.5 hours.
Parts Availability: Yes, most parts are still available for this model year.
However, the Crown Victoria Police Interceptor is no longer in production.
Associated Safety Issues: If sold at auction, potential buyers should be
176
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
There are no other vehicles in the city fleet available for use as police patrol vehicles.
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
Police pursuit rated vehicles are tested and certified in California at the Riverside
Sheriff’s Office proving grounds, and at the Michigan State Police proving grounds.
Certified emergency response vehicles include a number of additional safety measures
to protect occupants in emergency response situations. The proposed vehicle is a
Ford Police Interceptor.
COST - $60,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Staff continues to research the feasibility of deploying alternative fuel marked patrol
vehicles. While many alternative fuel vehicles are now available, their deployment as
an emergency response vehicle is not yet practical.
Ford has recently developed this vehicle for use with E85 Bio-Fuel, which if offered in
our area, may serve as an alternative in the future.
4.2 CARB STANDARDS
CARB STANDARDS
CARB regulations do not apply to this purchase.
made aware of the age and mileage.
177
2 Patrol Vehicles (Police Patrol Car #2)
Justification
Proposed Vehicle: Police Patrol Car #2
Department: Police
Area of use: Patrol
Prepared by: Chris Dewey
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle is needed for daily police patrol operations.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is #4114, a 2005 Ford Crown Victoria with 95951
miles on the odometer. This vehicle is in fair to poor condition.
Funding: Equipment Reserve (fund 220)
Estimated Value: $2,000
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: These police vehicles have significant
mileage of high demand police activities. After 100,000 miles, police vehicles
begin to suffer from cracked frames and other significant structural issues.
Maintenance Costs: Vehicle maintenance records indicate the department
has spent $6,516.32 in parts and labor, maintaining vehicle #4114 over the
life of the vehicle
Out of Service Time: City vehicle #4114 was out of service a total of 692.5
hours.
Parts Availability: Yes, most parts are still available for this model year.
However, the Crown Victoria Police Interceptor is no longer in production.
Associated Safety Issues: If sold at auction, potential buyers should be
178
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
There are no other vehicles in the city fleet available for use as police patrol vehicles.
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
Police pursuit rated vehicles are tested and certified in California at the Riverside
Sheriff’s Office proving grounds, and at the Michigan State Police proving grounds.
Certified emergency response vehicles include a number of additional safety measures
to protect occupants in emergency response situations. The proposed vehicle is a
Ford Police Interceptor.
COST - $60,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Staff continues to research the feasibility of deploying alternative fuel marked patrol
vehicles. While many alternative fuel vehicles are now available, their deployment as
an emergency response vehicle is not yet practical.
Ford has recently developed this vehicle for use with E85 Bio-Fuel, which if offered in
our area, may serve as an alternative in the future.
4.2 CARB STANDARDS
CARB STANDARDS
CARB regulations do not apply to this purchase.
made aware of the age and mileage.
179
Replace Street Sweeper
Justification
Proposed Vehicle: Elgin Crosswind J Sweeper, John Deere Tier 4 Final 4045TF150,
Turbocharged 115 Horsepower Diesel Engine, 8.0 Cubic Yard Hopper, Right and Left
Trailing Arm Side Brooms, Painted Elgin Standard White with Gray Undercarriage. Mounted
on a 2016 Freightliner M2 Factory Dualized Chassis with 2015 compliant Emissions and Air
Conditioning.
Department: Public Works
Area of use: Streets Division
Prepared by: Jarod Thiele, PW Project Analyst & Dave Kirch, Senior Equipment Mechanic
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used daily for sweeping of all City streets as mandated by
the City’s Storm Water Permit.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is #2532. It was purchased in 2006. This vehicle is
in fair to poor condition and currently has 5,000 hours on it. This unit cannot be
operated as the CNG fueling station is out of service. The CNG fueling station
requires over $10,000 in repairs every 3 to 4 years for rebuilding the CNG
pumps.
Funding: Special Project Reserve (fund 251) = $33,049;
unfunded = $206,951
Estimated Value: $35,000.
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in fair to poor mechanical
condition. Currently this vehicle is in need of a rebuilt fueling station as well
as repairs to the hopper and sweeper heads.
Maintenance Costs: During the past year, this vehicle has incurred over
180
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
None
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
One (1) new Elgin Crosswind J Sweeper - John Deere Tier 4 Final 4045TF150
Turbocharged 115 Horsepower Diesel engine, 8.0 Cubic Yard Hopper, Right and Left
Trailing Arm Side Brooms, Painted Elgin Standard White with Gray Undercarriage.
Mounted on an 2016 Freightliner M2. Factory Dualized Chassis with 2013 Emissions
and Air Conditioning.
COST - $240,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
The current unit is an alternative fueled unit which does not operate well in Ukiah’s
climate; therefore, a new unit is not recommended to be alternative fueled.
4.2 CARB STANDARDS
CARB STANDARDS
The proposed vehicle will comply with all current CARB standards.
$20,000 in parts and labor costs.
Out of Service Time: This vehicle has been out of service for 5 months due
to repairs needed to the CNG fueling station. The pumps on the station have
to be replaced every 3 to 4 years at a cost of over $10,000.
Parts Availability: Some parts are available from the factory.
Associated Safety Issues: This unit caught fire in 2007 due to a leak in the
high pressure fuel line.
181
Vactor Replacement Justification
Proposed Vehicle: 2017 Freightliner 114SD 4X2 with Cummins ISL 370 HP Engine, Allison
3000 RDS Transmission, 10-Cubic Yard Capacity, Single Engine Dual
Stage Fan unit with 1,000 Gallons Water Capacity, or equal
Department: Public Works
Area of use: Water and Sewer Operations Division
Prepared by: Jarod Thiele, PW Project Analyst & Dave Kirch, Senior Equipment Mechanic
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used daily for all of the Water and Sewer Division
maintenance of the water distribution and wastewater collection systems.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is #2514. It was purchased in 2000. Currently it
has 8,000 hours on it. This vehicle is in fair to poor condition, however, there is
a large amount of repairs needed.
Funding: Equipment Reserve (fund 220)
Estimated Value: $45,000.
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in fair to poor mechanical
condition. Currently this vehicle is in need of a new Heui injection system on
the main engine and fan blower assembly. The estimated cost of these
repairs is $20,000.
Maintenance Costs: For the past year this vehicle has incurred
approximately $11,000 in parts and labor costs.
Out of Service Time: This vehicle was out of service for 71 hours over the
last fiscal year. In addition, this vehicle will be used minimally after the end of
2015 due to diesel emission requirements. In order for it to comply with
182
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
This vehicle will have to be sold out of state as it will not comply with CARB emissions
standards.
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
10-Cubic Yard Capacity, Single Engine Dual Stage Fan unit with 1000 Gallons of
Water, mounted on a 2016 Freightliner 114SD 4X2 with Cummins ISL 370 HP Engine,
Allison 3000 RDS Transmission, or equal.
COST - $400,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
Alternative fueled vehicles for this type of use are not available.
4.2 CARB STANDARDS
CARB STANDARDS
The purchase will comply with all CARB regulations.
California Air Resources Board (CARB) standards, it would cost
approximately $150,000 to re-power both engines in addition to the repairs
mentioned above.
Parts Availability: Yes, most parts are available from the factory.
Associated Safety Issues: None
183
Replace Truck at WWTP Justification
Proposed Vehicle: One new 2015 Ford F-150 2WD, Super Cab Pickup or equal
Department: Public Works
Area of use: Wastewater Treatment Plant (WWTP)
Prepared by: Jarod Thiele, PW Project Analyst & Dave Kirch, Senior Equipment Mechanic
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used daily for maintenance at the Wastewater Treatment
Plant.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is city vehicle #3725, a 2001 Dodge Ram 1500
pickup. Currently it has 130,000 miles on it. This vehicle is in poor condition.
Funding: Sewer Capital (fund 844)
Estimated Value: $1,000.
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in poor mechanical condition.
It needs to be replaced with a reliable vehicle for daily maintenance use at the
WWTP.
Maintenance Costs: For the past year this vehicle has incurred over $3,000
in parts and labor costs.
Out of Service Time: This vehicle was out of service for 36 hours over the
last fiscal year.
Parts Availability: Yes, most parts are available from the factory.
Associated Safety Issues: None
184
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
There are no vehicles in the city fleet available for use as a permanent replacement.
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
One new 2015 Ford F-150 2WD, Super Cab Pickup or equal
COST - $30,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
An alternative fueled vehicle such as CNG is not recommended due to the amount of
time it is used for maintenance of the Waste Water Treatment Plant. A CNG fuelled
vehicle would require a rapid fill CNG fueling station. The added expense of
constructing a CNG fueling station is not economically feasible at this time.
4.2 CARB STANDARDS
CARB STANDARDS
This vehicle is exempt from CARB standards.
185
Water & Sewer Service Truck
Justification
Proposed Vehicle: One new 2015 Ford F-350, 1 ton, 2WD pickup with Scelzi Service bed or
equal
Department: Public Works
Area of use: Water and Sewer Operations Division
Prepared by: Jarod Thiele, PW Project Analyst & Dave Kirch, Senior Equipment Mechanic
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used daily for all operations of the Water and Sewer
Operations Division.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
This truck will be an addition to the fleet and is needed for all operations of the
Water and Sewer Division as well as serve to as the on-call truck.
Funding: Sewer Capital (fund 844) = $30,000;
Equipment Reserve (fund 220) = $30,000
Estimated Value: N/A
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: N/A
Maintenance Costs: N/A
Out of Service Time: N/A
Parts Availability: N/A
Associated Safety Issues: N/A
186
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
N/A
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
One new 2015 Ford F-350, 1 ton, 2WD pickup with Scelzi service bed, or equal.
COST - $60,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
An alternative fueled vehicle is not recommended.
4.2 CARB STANDARDS
CARB STANDARDS
This vehicle is exempt from CARB standards.
187
Service Truck WTP Justification
Proposed Vehicle: One new 2015 Ford F-250, 3/4 ton, 2WD pickup with Scelzi service bed
and lift gate or equal
Department: Public Works
Area of use: Water Treatment Plant
Prepared by: Jarod Thiele, PW Project Analyst & Dave Kirch, Senior Equipment Mechanic
1 VEHICLE PURPOSE
Need for Vehicle within Department Fleet
This vehicle will be used daily for all operations at the Water Treatment Plant,
wells, booster station and reservoirs.
2 REPLACEMENT JUSTIFICATION
2.1 Current Vehicle
Description, Mileage, Funding Source and Market Value
The vehicle being replaced is city vehicle #3745, a 2001 Dodge Ram BR2500.
Currently it has 148,000 miles on it. This vehicle is in fair to poor condition.
Funding: Equipment Reserve (fund 220)
Estimated Value: $2,000
2.2 Maintenance Costs
Overall Condition, Maintenance Costs, Out of Service Time, Parts
Availability, and Associated Safety Issues
Overall Mechanical Condition: This vehicle is in fair to poor mechanical
condition. Currently, the engine is leaking oil.
Maintenance Costs: For the past year, this vehicle has incurred
approximately $1,500 in parts and labor costs.
Out of Service Time: Normal out-of-service time for a vehicle of this age.
Parts Availability: Yes, most parts are available from the factory.
Associated Safety Issues: None
188
2.3 Shared Resources
Define any Resources Currently Available within the City of Ukiah Fleet which
could be Utilized for this Purpose.
There are no other available vehicles which could be used.
3 PROPOSED VEHICLE SPECIFICATIONS
Proposed Vehicle Specifications
One new 2015 Ford F-250 2WD pickup with Scelzi service bed and lift gate or equal.
COST - $45,000
4 ALTERNATIVE FUEL AND CARB REGULATIONS
4.1 Alternative Fuels Availability
Proposed Vehicle Alternative Fuels Availability
An alternative fueled vehicle is not recommended.
4.2 CARB STANDARDS
CARB STANDARDS
This vehicle is exempt from CARB standards.
189