CITY OF UKIAH
AMENDMENT NO. 5
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED FEBRUARY 6, 2002
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
February 6, 2002; the First Amendment dated November 18, 2002; the Second
Amendment dated February 4, 2004; the Third Amendment dated February 6, 2007; and
the Fourth Amendment dated September 9, 2013 shall remain in force and effect except as
modified by this fifth amendment.
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service
described under the Scope of Additional Work identified in this Amendment No. 5.
SCOPE OF ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
February 24, 2015 letter proposal from EBA Engineering. A copy of said letter is included in
this fifth amendment.
COMPENSATION
Compensation for the performance of the additional work shall be made on a time and
expense basis at Consultant's customary fees. Expenses shall not exceed a maximum
total cost of $55,720.
EBA ENGINEERING CITY OF UKIAH
� ��';_°� ; �
� ;� � �) ; �,
BY: �/i� �,,,�; �f;'.����-� BY: �� �� L
� � �,1, , : , „� L d;-�t�t-.ti�t`",�-�
DAMON F. BR�1lal�J JANE CHAMBERS
President City Manager
� � �
���/�:�� � j� , /_�
.� ,
DATE DATE
Amendment No.5 to Agreement for
Professional ConsWting Services
E �,�,
`�INE�R@NG
February 24,2015
Mr. Tim Eriksen, P.E.
Director of Public Works
City of Ukiah(City)
300 Seminary Avenue
Ukiah,CA 95482-5400
RE: AMENDMENT T�FINAL CONSTRUCTION DESIGN CONTRACT
CITY OF UKIAH LANDFILL
MENDOCINO COU�TTY,CALIFORNIA
EBA 02-907
Dear Mr. Erikesn:
Per your request during our teleconference this morning, EBA Engineering (EBA) has prepared this
amendment to the existing final construction design contract associated with the final closure of the City
of Ukiah Landfill (Landfill). At the City's direction, EBA will perform a redesign of the landfill final
cover system utilizing a]ess expensive technology then the current cover system. This design change will
save approximate $350,000 in construction costs. Please note this cost savings estimate does not include
additional savings in reduced post-closure maintenance costs that will be realized with the new cover
system.
EBA will also provide CEQA services associated with the recent requirement to revise the original CEQA
initial study. It is our understanding that the specialized biologica] studies will be perPormed by others
contracted directly by the City.
These two additional tasks are summarized as follows:
• Redesign Final Closure Cover Svstem: EBA will incorporate the design changes needed to
replace the current geosynthetic clay liner cover system design with a Linear low-density
polyethylene geomembrane liner/engineered artificial grass cover design. The redesign will
include new grad'vng and drainage calculations, along with revised construction drawings,
technical specifications, and construction quality assurance(CQA)plan. The engineer's estimate
of construction quantities and costs will also be revised to reflect construction of the new final
cover system.
• Initial St�eEQA Coordinatian: This task includes the preparation of an Initial Study and
Mitigated Negative Declaration (IS/MND) for the Ukiah Landfill Ciosure and Postclosure
Maintenance (Project). The City of Ukiah, Public Works Department, will be the lead agency
under the California Environmental Quality Act (CEQA) for the Project. In accordance with
Section 15070 of the CEQA Guidelines, an Initial Study� is prepared t� analyze the potential
project-related impacts anticipated to occur as a result of implementing the Project. Pursuant to
Section 15071 of the CEQA Guidelines, the IS/MND includes: (a) a description of the proposed
project; (b) the location of the project; (c) a list of the environmental factors potentially affected
b��project implementation; (d)a comprehensive analysis of each en��ironmental topic included in
the City's environmental checklist; (e) a proposed finding that the project will not have a
L:Iproject19071ProposallContract Amendment 02.24.I S.doc
825 Sonoma Avenue,Suite C • Santa Rosa,California 95404
(707) 544-0784 • FAX(7�7}544-0866 • www.ebagroup.com
significant effect on the environment;and(fl mitigation measures.
The Initial Study is a preliminary analysis intended to determine if the project may have a
significant effect on the environment. A negative declaration is a written statement prepared that
briefly describes the reasons why a proposed project wiil not have a significant effect on the
environment and,therefore,does not require the preparation of an Environmenta l Impact Report.
The ISlMND will be prepared in accordance with the CEQA, Public Resources Code 21000 et
seq.,and the State CEQA Guidelines,California Code of Regulatians, Section 15000 et seq.
Technical studies will be required to complete the IS/MND that include studies for special status
plant species, special-status wildlife species, wetland delineation, and assessment of greenhouse
gas emissions. The greenhouse gas emissions assessment will be conducted under the direction
and coordination of EBA. The special-status studies and wetland delineation will be prepared by
others under direct contract witt�the City and under the coordination of EBA.
The costs for the following respective tasks described above is as follows:
• Redesign Final Closure Cover System.• $42,220
• CEQA: $ 13.soa
• Total Additional Costs: $SS,720
A copy of EBA's Slandard Schedule of Fees and Rates reflecting our current billing rates is attached.
EBA appreciates the opportunity to be of continued service to the City of Ukiah. If you should have any
questions regarding this amendment,please do not hesitate to contact us.
Sincerely,
EBA ENGINEERING
��1'f�/ ,�--
Damon F.Brown, C.E.G., C.Hg.
President
Enclosure: EBA Standard Schedule of Fees and Rates
G:Iproject1907lProposallContract Rmendment 02.24.IS.doc 2
� ��
"±.� ENGINEERING
STANDARD SCHEDULE OF FEES AND RATES
Principal Geologist/Principal Engineer........................................... $170.00 per hour
Project Manager............................................................................. $125.00-$150.00 per hou�
Senior GeologisUSenior Engineer.................................................. $125.00- $150.00 per hour
Senior Project Geologist/Senior Project Engineer.......................... $110.00-$140.00 per hour
Project Gealogist/Project Engineer................................................. $ 95.00-$135.00 per hour
Staff Geologist/Staff Engineer........................................................ $ 80.00 - $115.00 per hour
Survey: 3 Man Crew....................................................................... $255.00 per hour
Survey: 2 Man Crew....................................................................... $235.�0 per hour
Survey Travel: 2 Man Crew............................................................ $190.00 per hour
Survey: 1 Man Crew....................................................................... $150.00 per hour
Senior Survey Technician .............................................................. $105.00- $115.00 per hour
Senior Environmental Scientist/Specialist...................................... $ 95.00- $120.00 per hour
Environmental Scientist/Specialist.................................................. $ 60.00-$105.00 per hour
Design Draftsperson...................................................................... $ 90.00-$1Q0.00 per hour
Clerical........................................................................................... $ 59.00 per hour
Administrative................................................................................ $ 60.00 per hour
Systems Manager.......................................................................... $ 65.d0 per hour
Depositions or court proceedings................................................... 200% of usual rates
Subconsultants .............................................................................. Cost plus 15%
Prints and materials....................................................................... Cost plus 15%
Miscellaneous expenses................................................................ Cost plus 15%