Loading...
HomeMy WebLinkAboutEBA Engineering 2015-03-13; Amendment 5 2002-02-06 �ou N0. tZ�3- 115-R� CITY OF UKIAH AMENDMENT NO. 5 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED FEBRUARY 6, 2002 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated February 6, 2002; the First Amendment dated November 18, 2002; the Second Amendment dated February 4, 2004; the Third Amendment dated February 6, 2007; and the Fourth Amendment dated September 9, 2013 shall remain in force and effect except as modified by this fifth amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 5. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the February 24, 2015 letter proposal from EBA Engineering. A copy of said letter is included in this fifth amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $55,720. EBA ENGINEERING CITY OF UKIAH � ��';_°� ; � � ;� � �) ; �, BY: �/i� �,,,�; �f;'.����-� BY: �� �� L � � �,1, , : , „� L d;-�t�t-.ti�t`",�-� DAMON F. BR�1lal�J JANE CHAMBERS President City Manager � � � ���/�:�� � j� , /_� .� , DATE DATE Amendment No.5 to Agreement for Professional ConsWting Services E �,�, `�INE�R@NG February 24,2015 Mr. Tim Eriksen, P.E. Director of Public Works City of Ukiah(City) 300 Seminary Avenue Ukiah,CA 95482-5400 RE: AMENDMENT T�FINAL CONSTRUCTION DESIGN CONTRACT CITY OF UKIAH LANDFILL MENDOCINO COU�TTY,CALIFORNIA EBA 02-907 Dear Mr. Erikesn: Per your request during our teleconference this morning, EBA Engineering (EBA) has prepared this amendment to the existing final construction design contract associated with the final closure of the City of Ukiah Landfill (Landfill). At the City's direction, EBA will perform a redesign of the landfill final cover system utilizing a]ess expensive technology then the current cover system. This design change will save approximate $350,000 in construction costs. Please note this cost savings estimate does not include additional savings in reduced post-closure maintenance costs that will be realized with the new cover system. EBA will also provide CEQA services associated with the recent requirement to revise the original CEQA initial study. It is our understanding that the specialized biologica] studies will be perPormed by others contracted directly by the City. These two additional tasks are summarized as follows: • Redesign Final Closure Cover Svstem: EBA will incorporate the design changes needed to replace the current geosynthetic clay liner cover system design with a Linear low-density polyethylene geomembrane liner/engineered artificial grass cover design. The redesign will include new grad'vng and drainage calculations, along with revised construction drawings, technical specifications, and construction quality assurance(CQA)plan. The engineer's estimate of construction quantities and costs will also be revised to reflect construction of the new final cover system. • Initial St�eEQA Coordinatian: This task includes the preparation of an Initial Study and Mitigated Negative Declaration (IS/MND) for the Ukiah Landfill Ciosure and Postclosure Maintenance (Project). The City of Ukiah, Public Works Department, will be the lead agency under the California Environmental Quality Act (CEQA) for the Project. In accordance with Section 15070 of the CEQA Guidelines, an Initial Study� is prepared t� analyze the potential project-related impacts anticipated to occur as a result of implementing the Project. Pursuant to Section 15071 of the CEQA Guidelines, the IS/MND includes: (a) a description of the proposed project; (b) the location of the project; (c) a list of the environmental factors potentially affected b��project implementation; (d)a comprehensive analysis of each en��ironmental topic included in the City's environmental checklist; (e) a proposed finding that the project will not have a L:Iproject19071ProposallContract Amendment 02.24.I S.doc 825 Sonoma Avenue,Suite C • Santa Rosa,California 95404 (707) 544-0784 • FAX(7�7}544-0866 • www.ebagroup.com significant effect on the environment;and(fl mitigation measures. The Initial Study is a preliminary analysis intended to determine if the project may have a significant effect on the environment. A negative declaration is a written statement prepared that briefly describes the reasons why a proposed project wiil not have a significant effect on the environment and,therefore,does not require the preparation of an Environmenta l Impact Report. The ISlMND will be prepared in accordance with the CEQA, Public Resources Code 21000 et seq.,and the State CEQA Guidelines,California Code of Regulatians, Section 15000 et seq. Technical studies will be required to complete the IS/MND that include studies for special status plant species, special-status wildlife species, wetland delineation, and assessment of greenhouse gas emissions. The greenhouse gas emissions assessment will be conducted under the direction and coordination of EBA. The special-status studies and wetland delineation will be prepared by others under direct contract witt�the City and under the coordination of EBA. The costs for the following respective tasks described above is as follows: • Redesign Final Closure Cover System.• $42,220 • CEQA: $ 13.soa • Total Additional Costs: $SS,720 A copy of EBA's Slandard Schedule of Fees and Rates reflecting our current billing rates is attached. EBA appreciates the opportunity to be of continued service to the City of Ukiah. If you should have any questions regarding this amendment,please do not hesitate to contact us. Sincerely, EBA ENGINEERING ��1'f�/ ,�-- Damon F.Brown, C.E.G., C.Hg. President Enclosure: EBA Standard Schedule of Fees and Rates G:Iproject1907lProposallContract Rmendment 02.24.IS.doc 2 � �� "±.� ENGINEERING STANDARD SCHEDULE OF FEES AND RATES Principal Geologist/Principal Engineer........................................... $170.00 per hour Project Manager............................................................................. $125.00-$150.00 per hou� Senior GeologisUSenior Engineer.................................................. $125.00- $150.00 per hour Senior Project Geologist/Senior Project Engineer.......................... $110.00-$140.00 per hour Project Gealogist/Project Engineer................................................. $ 95.00-$135.00 per hour Staff Geologist/Staff Engineer........................................................ $ 80.00 - $115.00 per hour Survey: 3 Man Crew....................................................................... $255.00 per hour Survey: 2 Man Crew....................................................................... $235.�0 per hour Survey Travel: 2 Man Crew............................................................ $190.00 per hour Survey: 1 Man Crew....................................................................... $150.00 per hour Senior Survey Technician .............................................................. $105.00- $115.00 per hour Senior Environmental Scientist/Specialist...................................... $ 95.00- $120.00 per hour Environmental Scientist/Specialist.................................................. $ 60.00-$105.00 per hour Design Draftsperson...................................................................... $ 90.00-$1Q0.00 per hour Clerical........................................................................................... $ 59.00 per hour Administrative................................................................................ $ 60.00 per hour Systems Manager.......................................................................... $ 65.d0 per hour Depositions or court proceedings................................................... 200% of usual rates Subconsultants .............................................................................. Cost plus 15% Prints and materials....................................................................... Cost plus 15% Miscellaneous expenses................................................................ Cost plus 15% Effective August 2014 L:Imazterslform5lratesFee Scfiedule August 2014 new logo.doc