HomeMy WebLinkAboutCoastside Concrete 2015-02-23 �� (�l� /��
CITY OF UKIAH
Mendocino County, California
AGREEMENT
FOR
PERKINS STREET UNDERGOUNDING PROJECT
Specification No. 14-15
THIS AGREEMENT, made this 23rd day of Februarv, 2015, by and between the City of Ukiah, Mendocino
County, California, hereinafter called the City and Coastside Concrete, hereinafter called the Contractor,
WITNESSED:
WHEREAS, the City has caused to be prepared in accordance with law, specifications, drawings and other
contract documents for the work herein described and shown and has approved and adopted these contract
documents, specifications and drawings and has caused to be published in the manner and for the time
required by law a notice to bidders inviting sealed proposals for doing the work in accordance with the terms
of this contract and
WHEREAS, the Contractor, in response to the notice to bidders, has submitted to the City a sealed proposal
accompanied by a proposal guaranty in an amount of not less than 10 percent of the bid price for the
construction of the proposed work in accordance with the terms of this contract and
WHEREAS, the City, in the manner prescribed by law, has publicly opened, examined and canvassed the
proposals submitted and as a result has determined and declared the Contractor to be the lowest and best
regular responsible bidder for the work and for the sums named in the proposal,
NOW, THEREFORE, THIS AGREEMENT WITNESSED:
Article 1. Work to be Done and Contract Days Allowed.
That the Contractor shall provide all necessary machinery, tools, apparatus and other means of construction;
shall furnish all materials (as described), superintendence, overhead, expenses, all labor and expenses of
whatever nature necessary for completion of the work in conformity with the Special Provisions and other
contract documents hereto attached and according to such instructions as may be given by the Project
Manager. The Contractor shall complete the work within sixty-five (65) calendar days. Contract days shall be
counted starting with the 10th day following receipt of notice that the contract has been executed by the City.
Contractor, at his or her option, may begin work prior to start of counting contract days, however, in no event
shall the Contractor start work without giving notification to the Engineer at least 72 hours prior to the start of
work, without obtaining an encroachment permit from the City, or without having submitted certificates of
insurance that have been accepted and approved by the Engineer
Perkins Street Undergrounding Project 51 Spec 14-15
Article II. Contract Prices.
That the City shall pay the Contractor the prices stated in the proposal submitted by the Contractor, for
complete performance of the contract by the Contractor. The Contractor hereby agrees to accept the prices
as full compensation for all material and appliances necessary to the work, for all labor and use of tools and
other implements necessary to execute the work contemplated in this contract; for all loss or damage arising
out of the nature of the work or from the action of the elements, or from any unforeseen obstructions or
difficulties which may be encountered in the prosecution of the work; for all risks of every description
connected therewith; for all expenses of the work, as herein specified; for all liability and other insurance, for
all overhead and other expenses incident to the work; all according to the Contract Drawings, the Special
Provisions, the Details, the instructions and the requirements of the City.
Article III. Labor Discrimination.
Attention is directed to Section 1735 of the Labor Code,which reads as follows:
"No discrimination shall be made in the employment of persons upon public works because of the
race, color, national origin or ancestry, or religion of such persons and every contractor for public
works violating this section is subject to all the penalties imposed for a violation of this chapter."
In connection with the performance of work under this contract,the Contractor agrees as follows:
(a) The Contractor will not willfully discriminate against any employee or an applicant for
employment because of race, color, religion, ancestry, or national origin. The Contractor will
take affirmative action to ensure that applicants are employed and that employees are treated
during employment without regard to their race, color, religion, ancestry, or national origin. Such
action shall include, but not be limited to, the following: employment, upgrading, demotion or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms
of compensation; and selection for training, including apprenticeship. The Contractor agrees to
post in conspicuous places, available to employees and applicants for employment, notices to
be provided by the awarding authority setting forth the provisions of this Fair Employment
Practice section.
(b) The Contractor will send to each labor union or representative of workers with which he or she
has a collective bargaining agreement or other contract or understanding, a notice, to be
provided by the awarding authority, advising the said labor union or worker's representative of
the Contractor's commitments under this section, to employees and applicants for employment.
(c) The Contractor will permit access to his or her records of employment, employment
advertisements, application forms and other pertinent data and records by the Fair Employment
Practices Commission, City of Ukiah or any other appropriate agency of the State of California
designated by the awarding authority, for the purposes of investigation to ascertain compliance
with the Fair Employment Practices section of this contract.
(d) A finding of willful violation of the Fair Employment Practices section of this Contract or of the
Fair Employment Practices Act shall be regarded by the awarding authority as a basis for
determining the Contractor to be not a"responsible bidder"as to future contracts for which such
Contractor may submit bids, for revoking the Contractor's pre-qualification rating, if any and for
refusing to establish, reestablish or renew a pre-qualification rating for the Contractor.
The City of Ukiah shall deem a finding of willful receipt of written notice from the Fair
Employment Practices Act to have occurred upon that it has investigated and determined that
Perkins Street Undergrounding Project 52 Spec 14-15
the Contractor has violated the Fair Employment Practices Act and has issued an order under
Labor Code Section 1426 or obtained an injunction under Labor Code Section 1429.
Upon receipt of such written notice from the Fair Employment Practices Commission, the City
shall notify the Contractor that unless he or she demonstrates to the satisfaction of the
awarding authority within a stated period that the violation has been corrected, his or her pre-
qualification rating will be revoked at the expiration of such period.
(e) The Contractor agrees that should the City determine that the Contractor has not complied with
the Fair Employment Practices section of this Contract, then pursuant to Labor Code Section
1735 and 1775 the Contractor shall, as a penalty to the City, forFeit for each calendar day or
portion thereof, for each person who was denied employment as a result of such non-
compliance, the penalties provided in the Labor Code for violation of prevailing wage rates.
Such monies may be recovered from the Contractor. The City may deduct any such damages
from any monies due the Contractor.
(fl Nothing contained in this Fair Employment Practices section shall be construed in any manner
of fashion so as to prevent the City or the State of California from pursuing any other remedies
that may be available at law.
(g) Prior to awarding the Contract, the Contractor shall certify to the awarding authoritjr that he or
she has or will meet the following standards for affirmative compliance, which shall be
evaluated in each case by the awarding authority:
(1) The Contractor shall provide evidence, as required by the City that he or she has notified all
supervisors, foremen and other personnel officers in writing of the content of the anti-
discrimination clause and their responsibilities under it.
(2) The Contractor shall provide evidence, as required by the City, that he or she has notified
all sources of employees' referrals (including unions, employment agencies, advertisements,
Department of Employment) of the content of the anti-discrimination clause.
(3) The Contractor shall file a basic compliance report, as required by the City. Willfully false
statements made in such reports shall be punishable as provided by law. The compliance
report shall also spell out the sources of the work force and who has the responsibility for
determining whom to hire, or whether or not to hire.
(4) Personally, or through his or her representatives, the Contractor shall, through negotiations
with the unions with whom he or she has agreements, attempt to develop an agreement which
will:
a. Spell out responsibilities for nondiscrimination in hiring, referral, upgrading and training.
b. Otherwise implement an affirmative anti-discrimination program in terms of the unions'
specific areas of skill and geography to the end that qualified minority workers will be
available and given and equal opportunity for employment.
(5) The Contractor shall notify the City of opposition to the anti-discrimination clause by
individuals,firms or organizations during the period of its pre-qualification.
(h) The Contractor will include the provisions of the foregoing paragraphs 1 through 5 in every first
tier subcontract so that such provisions will be binding upon each such subcontractor.
Perkins Street Undergrounding Project 53 Spec 14-15
(i) The "Fair Employment Practices Certification" must be completed and signed prior to the time
of submitting the bid.
Article IV. Parts of the Contract.
That the complete contract consists of the following documents, all of which shall be considered a part of this
agreement.
1. Notice to Bidders
2. Wage Scales
3. General Conditions
4. Technical Specifications
5. Proposal
6. Fair Employment Practices Certification
7. Agreement
8. Contract Bonds
9. Contract Drawings and Construction Details
10. Standard Drawings .
11. Indemnification Agreement
IN WITNESS WHEREOF, this contract being executed in duplicate and the parties having caused their
�-��, f ,-----
names to be signed by authority of their duly authorized office thisG;�-„�day of �� , 20��.
CITY OF UKIAH, MENDOCINO COUNTY, CALIFORNIA
�
By:
MAN G , C TY QF UKIA�
Attest: 1 '`x�.�" ��1�-'"
CI CLERK, CI OF UKIAH
By: /
CONTRACTOR
Attest:
Title: (�-'�`��.,/
r� �
The foregoing contract is approved as to form and legality this ��� day of �"L�r k t ry/ , 20 L��'
�
CITY NEY, ITY OF U A
Perkins Street Undergrounding Project 54 Spec 14-15
INDEMNIFICATION AGREEMENT
This Indemnification Agreement is made and entered in Ukiah, California, on , 20 ,
by and between the City of Ukiah (Ukiah)and
(Contractor).Contractor is performing the work in Specification 14-15. Perkins Street Underqroundinq Project
for the City of Ukiah.
As a condition of issuing the work order, attached hereto, Ukiah requires assurance that Contractor will
protect Ukiah from damage or damage claims which arise from its performance of the work.
Accordingly, Contractor agrees as follows:
1. Indemnification. Contractor shall indemnify and hold harmless Ukiah and its officers, agents, and
employees from and against any claim, loss, or damage, including the legal and other costs of defending
against any claim of damage or loss which arises out of the Contractor's negligent or wrongful performance
under the work order attached hereto, except for claims, losses, or damages resulting from the sole and
exclusive negligence or other wrongful conduct of Ukiah or its officers, agents and employees.
CONTRACTOR
BY: r �r�- �-
TITLE: /�1.�-� ,�
Perkins Street Undergrounding Project 55 Spec 14-15
CITY OF UKIAH
Mendocino County, California
FAITHFUL PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS,
That we the undersigned,
AS PRINCIPAL, and
AS SURETY,
are held firmly bound unto THE CITY OF UKIAH, hereinafter called the"City", in the penal sum of
dollars($ )
for the payment of which sum we bind ourselves, our heirs, executors, administrators, and successors,jointly
and severally.
WHEREAS,the Principal has entered into a certain Contract with the City, dated , 20 ,
a copy of which is hereto attached and made a part hereof,
NOW, THEREFORE, the condition of this obligation is such that if the Principal shall in all respects fully
perform the Contract and all duly authorized modifications thereof, during its original term and any
extensions thereof that may be granted and during any guaranty period for which the Contract provides, and
if the Principal shall fully satisfy all claims, arising out of the prosecution of the work under the Contract and
shall fully indemnify the City for all expenses which it may incur by reason of such claims, including its
attorney's fees and court costs, and if the Principal shall make full payment to all persons supplying labor,
services, materials, or equipment in the prosecution of the work under the Contract, in default of which such
persons shall have a direct right of action hereupon; and if the Principal shall pay or cause to be paid all
sales and use taxes payable as a result of the performance of the Contract as well as payment of gasoline
and special motor fuels taxes in the performance of the Contract and all motor vehicle fees required for
commercial motor vehicles used in connection with the performance of the Contract, then this obligation shall
be void; otherwise, it shall remain in full force and effect. No modification of the Contract or extension of the
term thereof, nor any forbearance on the part of the City shall in any way release the Principal or the Surety
from liability hereunder. Notice to the Surety of any such modification, extension, or forbearance is hereby
waived.
IN WITNESS WHEREOF, the aforesaid Principal and Surety have executed this instrument and affixed their
seals hereto,this day of ,20
In the presence of:
WITNESS:
(SEAL)
(Individual Principal)
(Business Address)
(City/State/Zip Code)
Perkins Street Undergrounding Project 56 Spec 14-15
WITNESS:
(SEAL)
(Corporate Principal)
(Business Address)
(City/State/Zip Code)
ATTEST:
(Corporate Principal) Affix
Corporate
Seal
(Business Address)
(City/State/Zip Code)
ATTEST:
Affix
(Corporate Surety) Corporate
Seal
(Business Address)
(City/State/Zip Code)
The rate of premium on this bond is$ per thousand.
The total amount of premium charges is$
(The above is to be filled in by Surety Company). (Power of Attorney of person signing for Surety Company
must be attached).
(CERTIFICATE AS TO CORPORATE PRINCIPAL)
I, certify that I am the
Secretary of the corporation named as Principal in the foregoing bond;
that , who signed the said bond on behalf of the Principal,
was then of said corporation; that I know his
signature, and that his signature thereto is genuine; and that said bond was duly signed, sealed, and attested
to for and in behalf of said corporation by authority of its governing body.
Affix Corporate Seal
Perkins Street Undergrounding Project 57 Spec 14-15
CITY OF UKIAH
Mendocino County, California
MATERIAL AND LABOR BOND
KNOW ALL MEN BY THESE PRESENTS,
That we the undersigned,
AS PRINCIPAL, and
, AS SURETY,
are held firmly bound unto THE CITY OF UKIAH, hereinafter cailed the"City" in the penal sum of
dollars ($ ) for the payment of which sum we bind ourselves, our heirs, executors,
administrators, and successors,jointly and severally.
WHEREAS, the Principal has entered into a certain Contract with the City, dated ,
20
a copy of which is hereto attached and made a part hereof,
NOW, THEREFORE, the condition of this obligation is such that if the Principal shall in all respects fully
perform the Contract and all duly authorized modifications thereof, during its original term and any
extensions thereof that may be granted and during any guaranty period for which the Contract provides, and
if the Principal shall fully satisfy all claims, arising out of the prosecution of the work under the Contract and
shall fully indemnify the City for all expenses which it may incur by reason of such claims, including its
attorney's fees and court costs, and if the Principal shall make full payment to all persons supplying labor,
services, materials, or equipment in the prosecution of the work under the Contract, in default of which such
persons shall have a direct right of action hereupon; and if the Principal shall pay or cause to be paid all
sales and use taxes payable as a result of the performance of the Contract as well as payment of gasoline
and special motor fuels taxes in the performance of the Contract and all motor vehicle fees required for
commercial motor vehicles used in connection with the perFormance of the Contract, then this obligation shall
be void; otherwise, it shall remain in full force and effect. No modification of the Contract or extension of the
term thereof, nor any forbearance on the part of the City shall in any way release the Principal or the Surety
from liability hereunder. Notice to the Surety of any such modification, extension, or forbearance is hereby
waived.
IN WITNESS WHEREOF, the aforesaid Principal and Surety have executed this instrument and affixed their
seals hereto,this day of ,20
In the presence of:
WITNESS:
(SEAL)
(Individual Principal)
(Business Address)
(City/State/Zip Code)
Perkins Street Undergrounding Project 58 Spec 14-15
WITNESS:
(SEAL)
(Corporate Principal)
(Business Address)
(City/State/Zip Code)
ATTEST:
(Corporate Principal) Affix
Corporate
Seal
(Business Address)
(City/State/Zip Code)
ATTEST:
Affix
(Corporate Surety) Corporate
Seal
(Business Address)
(City/State/Zip Code)
The rate of premium on this bond is$ per thousand.
The total amount of premium charges is$
(The above is to be filled in by Surety Company). (Power of Attorney of person signing for Surety Company
must be attached).
(CERTIFICATE AS TO CORPORATE PRINCIPAL)
I, certify •that I am the
Secretary of the corporation named as Principal in the foregoing bond;
that , who signed the said bond on behalf of the Principal,
was then of said corporation; that I know his
signature, and that his signature thereto is genuine; and that said bond was duly signed, sealed, and attested
to for and in behalf of said corporation by authority of its governing body.
Affix Corporate Seal
Perkins Street Undergrounding Project 59 Spec 14-15
DIRECTIONS FOR PREPARATION OF PERFORMANCE AND MATERIAL AND LABOR BOND
1. Individual sureties, partnerships, or corporations not in the surety business will not be acceptable.
2. The name of the Principal shall be shown exactly as it appears in the Contract.
3. The penal sum shall not be less than required by the Specifications.
4. If the Principals are partners or joint venturers, each member shall execute the bond as an individual
and state his place of residence.
5. If the Principal is a corporation, the bond shall be executed under its corporate seal.
If the corporation has no corporate seal, it shall so state and affix a scroll or adhesive seal following
the corporate name.
6. The official character and authority of the person(s) executing the bond for the Principal, if a
corporation, shall be certified by the Secretary or Assistant Secretary thereof under the corporate
seal, or copies attached to such records of the corporation as will evidence the official character and
authority of the officer signing, duly certified by the Secretary or Assistant Secretary, under the
corporate seal, to be true copies.
7. The current power-of-attorney of the person signing for the surety company must be attached to the
bond.
8. The date of the bond must not be prior to the date of the Contract.
9. The following information must be placed on the bond by the surety company:
a. The rate of premium in dollars per thousand; and
b. The total dollar amount of premium charged.
10. The signature of a witness shall appear in the appropriate place attending to the signature of each
party of the bond.
11. Type or print the name underneath each signature appearing on the bond.
12. An executed copy of the bond must be attached to each copy of the Contract (original counterpart)
intended for signing.
Perkins Street Undergrounding Project 60 Spec 14-15
CITY OF UKIAH
Mendocino County, California
DEFECTIVE MATERIAL AND WORKMANSHIP(MAINTENANCEI BOND
KNOW ALL MEN BY THESE PRESENTS,
That we,
, as PRINCIPAL
and
, as SURETY,
are held and firmly bound unto the City of Ukiah as Obligee, in the penal sum of
($ 1,
(5 PERCENT OF THE FINAL CONTRACT AMOUNT)
to which payment well and truly to be made, we do bind ourselves, our and each of our heirs, executors, administrators
successors and assigns jointly and severally, firmly by these presents.
WHEREAS, the said Principal entered into a Contract with the City Of Ukiah dated
for
WHEREAS, said Contract has been completed, and was approved on the day of , ,
NOW,THEREFORE,THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall guarantee that the
work will be free of any defective materials or workmanship which become apparent during the period of one (1) year
following completion of the Contract, then this obligation shall be void, otherwise to remain in full force and effect,
provided however, any additional warranty or guarantee whether expressed or implied is extended by the Principal or
Manufacturer only, and the surety assumes no liability for such a guarantee.
Signed, sealed, and dated this day of , 20
(Seal)
BY: (Seal)
(Seal)
Principal
(Seal)
BY: (Seal)
(Seal)
Surety
Perkins Street Undergrounding Project 61 Spec 14-15