HomeMy WebLinkAboutDRBM_05032011 G�ity of 1lktah City of Ukiah, CA
Design Review Board
1 MINUTES
2
3 Regular Meeting May 3, 2011
4 Conference Room 3 3:00 p.m.
5 Ukiah Civic Center, 300 Seminary Avenue
6 1. CALL TO ORDER: Chair Moser called the Design Review Board meeting at
7 3:15 p.m.
8
9 2. ROLL CALL Present: Tom Liden, Alan Nicholson, Tom Hise,
10 Richard Moser, Estok Menton
11 Absent: Nick Thayer
12 Staff Present: Kim Jordan, Senior Planner
13 Jennifer Faso, Associate Planner
14
15 3. CORRESPONDENCE: None
16
17 4. APPROVAL OF MINUTES: April 20, 2011 minutes
18 M/S Liden/Nicholson to approve April 20, 2011 minutes, as submitted.
19
20 5. AUDIENCE COMMENTS ON NON-AGENDA ITEMS: None
21
22 6. RIGHT TO APPEAL: There are no appealable items on this agenda.
23
24 7. UNFINISHED BUSINESS
25
26 7A. Continue working on the Downtown Zoning Code Design District Guidelines.
27
28 Staff passed out a handout provided by Member Thayer of photos and narrative for
29 review and consideration by the Board.
30
31 Board Consensus of the photos/narrative from Member Thayer: The Board
32 reviewed the photographs and narrative provided by Member Thayer and selected the
33 following:
34
35 Main Street District
36 ■ Healdsburg Hotel (example 5)
37 ■ SOMA Mixed Use (example 8)
38 ■ Barn Diva (example 6) — architectural style only (form does not meet DZC
39 requirements)
40 ■ Portola Civic Center (example 10)— architectural style only (form does not meet
41 DZC requirements)
42
43 Perkins Street Corridor
44 ■ Healdsburg Hotel (example 5)
45 ■ SOMA Mixed Use (example 8)
46 ■ Liked the language from Example 1: Progressive architecture when it was built.
47 Can we support similar innovation now.
Design Review Board May 3, 2011
Page 1
1 Incorporate "progressive architecture" and "innovation" into the design approach for
2 Perkins Street.
3
4 The Board reviewed Table 2 and identified the following Existinq Patterns for each
5 district:
6
7 Historic District
8 ■ Materials: stucco, precast brick, stone, limestone
9 ■ Flat roof with parapet, varied roof lines, decorative parapets
10 ■ Primarily 2 and 3 story buildings
11 ■ Recessed entries, cast iron columns, awnings
12 ■ Pedestrian orientation
13 ■ Retail on the ground floor
14 ■ Development of full blocks/100% lot coverage
15 ■ Parking district, so public parking and street parking dominate. Few sites provide
16 onsite parking.
17
18 Main Street District
19 ■ Materials: wood siding, stucco, metal
20 ■ Primarily one story buildings, some two story buildings
21 ■ Primarily flat roofs with parapets
22 ■ Public parking lots
23 ■ Craftsman design elements due to Sun House influence
24 ■ Lots have double front (State Street and Main Street) with building fronting on
25 State Street and parking lot on Main street
26
27 Perkins Street Corridor Existinq Patterns
28 ■ Materials: stucco, stone veneer, plywood siding
29 ■ 1960/1970s auto-oriented architecture
30 ■ No definable character/design style, "anywhere" USA
31 ■ One-story, low profile buildings
32 ■ Parking lots located at the street in front of the building
33 ■ Lack of pedestrian orientation/walkability
34
35 7B. Discussion and direction regarding Fa�ade Improvement Program Sign
36
37 Board Consensus for Text of Sign for Prior FIP Projects:
38
39 Partial Funding for this building fa�ade improvement is provided by the citizens of Ukiah
40 through the Redevelopment Agency.
41
42 For more information regarding the Fa�ade Improvement Program contact
43 The City of Ukiah Planning Department
44 300 Seminary Avenue, Ukiah
45 707.463.6206
46 Planning@cityofukiah.com
47
48
49 8. MATTERS FROM THE BOARD: None
50
51 9. MATTERS FROM STAFF: None
Design Review Board May 3, 2011
Page 2
1
2 10. SET NEXT MEETING/ADJOURNMENT: Thursday May 12 at 3:00 p.m.
3 The meeting adjourned at 4:40 p.m.
4
5
6 Richard Moser, Chair
7
8 Cathy Elawadly, Recording Secretary
Design Review Board May 3, 2011
Page 3