Loading...
HomeMy WebLinkAboutDRBM_07082010 G�ity of 1lktah City of Ukiah, CA Design Review Board 1 MINUTES 2 3 Regular Meeting July 8, 2010 4 Conference Room 3 3:00 p.m. 5 Ukiah Civic Center, 300 Seminary Avenue 6 1. CALL TO ORDER: Chair Moser call the Design Review Board meeting at 3:05 7 p.m. 8 9 2. ROLL CALL Present: Tom Liden, Alan Nicholson, Tom Hise, 10 Nick Thayer, Richard Moser, Chair 11 Absent: Estok Menton, Jody Cole 12 Others Present: Judy Pruden, Cynthia Coale, L 13 Staff Present: Kim Jordan, Senior Planner 14 Cathy Elawadly, Recording Secretary 15 3. CORRESPONDENCE: None 16 17 4. APPROVAL OF MINUTES: Deferred to next meeting. 18 19 5. AUDIENCE COMMENTS ON NON-AGENDA ITEMS: None 20 21 6. RIGHT TO APPEAL: Chair Moser read the appeal process. For matters 22 heard at this meeting, the final date for appeal is July 19, 2010. 23 24 7. UNFINISHED BUSINESS: 25 Fa�ade Improvement Grant No. 10-01, 247 North State Street, APN 002-227-11. 26 Request for modification to approved Fa�ade Improvement Grant No. 10-01 and site 27 visit for condition compliance. 28 29 The Board met at City Hall to convene the meeting. After convening the meeting, the 30 Board temporarily adjourned at 3:15 p.m. for a site visit to the project site, 247 North 31 State Street to view samples of the "jazz ceiling" and the entry door. No members of the 32 public were in attendance. 33 34 Judy Pruden, "City Historian" provided a history of `jazz stucco/jazz style finish' and 35 noted this type of treatment can be architecturally effective and highly complementary to 36 buildings, particularly buildings having historical significance. She provided two color 37 boards consisting of four colors (tan, copper, green that matches the tile for the floor in 38 the entryway, and red displayed in a variety of applications for the Board members to 39 consider). The Board had previously recommended and Judy Pruden had agreed to 40 provide examples of the "jazz ceiling." 41 42 Lyle Doughty, contractor for the project, showed the door in its natural wood after the 43 paint had been removed. The wood in the alcove has been stained a `red mahogany' to 44 restore/preserve the natural look of the wood. The original mahogany wood was 45 discovered when the paint was removed. 46 47 Meeting reconvened: 4:06 p.m. Design Review Board July 8,2010 Page 1 1 Senior Planner Jordan noted the requested action is for the Board to vote 1) on the 2 proposed jazz style finish color pallet and 2) on the door being painted as originally 3 proposed or to stain the natural wood door. 4 5 Judy Pruden: The tile on the entryway floor consisting of yellow/custard, blue (teal) and 6 green tiles and the black tile in the front of the building suggests the color pallet for the 7 jazz ceiling. She supports having a green accent color with an emphasis on the copper 8 and a rose background for the jazz ceiling to tie in with the green tiles on the entryway 9 floor. Volunteered to paint the jazz ceiling. 10 11 Lyle Doughty commented the property owners desire to maintain the original natural 12 look of the wood. 13 14 Board: 15 • Discussion whether or not to leave the wood door and wood in the alcove in its 16 natural state and stain, rather than paint as originally approved. 17 • Discussion about which color combination would be most appropriate for the jazz 18 ceiling. 19 • Pleased Judy Pruden having the expertise will paint the jazz ceiling. 20 • Brief discussion about colors available to prime/paint the metal for the awning. 21 22 Board preference: 23 • Preference to leave the door and wood in the alcove in its natural wood state. 24 • Highly supportive of the formerly approved color for the awning, but now 25 questioned the approved color scheme (Almond Sugar) for the framed portion 26 of the building behind the awning because this color is too light, would fade 27 over time and would contrast rather than complement the building. 28 • Supports the metal parapet is black to match the black tile in the front of the 29 building. The intent would be to choose a background color that would nicely 30 blend with the color of the awning. A gold and/or variation thereof would be a 31 nice `warming' color. 32 • Consider revisiting the color pallet behind the awning and/or proceed with the 33 approved color, put up the awning and paint over if the color scheme does not 34 work. 35 36 Staff: Reaffirmed the Board has already approved a darker boarder color for around 37 the framed portion and the color behind the awning has also already been approved. 38 The FRC has approved the funding for the project. The agenda for today is to finish 39 approval of the jazz style color pallet and decide if the wood for the door should remain 40 natural and be stained or be painted as originally approved. 41 42 Cynthia Coale: The colors approved for the background do have a red tint compared to 43 other `neutral' colors. 44 45 Staff: Discussion and possible action for modification to the previously approved color 46 scheme for the background behind the awning and awning color must be specifically 47 agendized and is not a topic of discussion at this meeting. 48 Design Review Board July 8, 2010 Page 2 1 M/S Thayer/Nicholson for the wood entry door and wood around the windows in the 2 entry to remain natural and stained/preserved to match the original mahogany wood. 3 Motion carried (5-0). 4 5 The Board then divided the color board for the jazz ceiling into four areas exhibiting color 6 variations from the color pallets recommended by Judy Pruden. 7 8 M/S Hise/Liden to use #4 color palette for the jazz ceiling having no green color (4-1). 9 10 AYES: Members Hise, Liden, Nicholson and Chair Moser 11 NOES: Member Thayer 12 13 M/S Hise/Thayer to match the paint color for the panel behind the awning to the 14 "yellow/gold" in the wall tiles as much as possible and formed a subcommittee consisting 15 of Judy Pruden, Tom Hise, Tom Liden, and Alan Nicholson to approve the paint color 16 selected. Motion carried (5-0). 17 18 8. NEW BUSINESS: None. 19 20 9. MATTERS FROM THE BOARD: None. 21 22 10. MATTERS FROM STAFF: Informed Board of the appeal of the Pacific 23 Outfitters Mural Permit filed by council member Baldwin. There was a general 24 discussion concerning the Pacific Outfitters project and the Board's original design 25 recommendations. 26 27 11. SET NEXT MEETING/ADJOURNMENT 28 The meeting adjourned at 4:32 p.m. 29 30 31 Richard Moser, Chair 32 33 34 Cathy Elawadly, Recording Secretary Design Review Board July 8, 2010 Page 3