CITY OF UKIAH
AMENDMENT NO. 4
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED FEBRUARY 6, 2002
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
February 6, 2002; the First Amendment dated November 18, 2002; the Second
Amendment dated February 4, 2004; and the Third Amendment dated February 6, 2007
shall remain in force and effect except as modified by this fourth amendment. i
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service
described under the Scope of Additional Work identified in this Amendment No. 4.
SCOPE OF ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
August 20, 2013 letter proposal from EBA Engineering. A copy of said letter is included in
this fourth amendment.
COMPENSATION
Compensation for the performance of the additional work shall be made on a time and
expense basis at ConsultanYs customary fees. Expenses shall not exceed a maximum I
total cost of $60,980.
EBA ENGINEERING CITY OF UKIAH II
� ,-, f
r
BY:�� , . � / �,__�� ; �_— BY: , , , . ' ,.�_��6 ^,._ .�—=
DA ON F. BR WN JANE CHAMBERS I
President �ity Manager I
�i� - ;� . ; ; _• � _ ��
� i _,/i ✓ i: ;"
DATE �' DATE ' '� " � �
Amenamenl No.4 to Agreement tor
PrWessional Consulting Services
I _ _
_ _ _ _ _
I
' �EN�EE�
RECEIVED
August 20, zoi3 AUG 2 2 2p13
CITY OF UKIAH
DEPT.OF PUBLIC WORKS
Mr. Tim Eriksen, P.E.
Director of Public Works
City of Ukiali(City)
300 Seminary Avenue
Ukiah, CA 95482-5400
RE: AMENDMENT TO FINAL CONSTRUCTION DESIGN CONTRACT
CITY OF UKIAH LANDFILL
MENDOCINO COUNTY,CALIFOI2NIA
Dear Tim:
Per your request during our site meeting on August 14, 2013, EBA Engineering(EBA) has prepared this
amendment to the existing final construction design contract associated with the final closure oF the City
of Ukiah Landfill (Landfil]). At the time of our meeting, the remaining balance of the February 6, 2007
contract as reported by the City was $57,587. Additiona]tasks have become necessary since the previous
agreement due to changes in the final cover design and new regulations. These additional tasks can be
summarized as follows:
• Stabili Analysis: Perform laboratory testing and subsequent design analysis to account for the I
addition of a gas relief layer to the £nal cover system. Also review potential replacement of the
previously proposed 6-inch sand drainage layer with a geonet composite drainage layer as a
potential cost savings measure. I
• Supplenaental ToDOrra�hic Survev: Perform field topography to supplement the aerial survey I
photogrammetric mapping provided by the City. This field topography will consist of I
topographic features within the project limits that affect the design including manholes and i
inverts on the leachate collection system, locations and inverts on the existing storm drain and
leachate outfalls, and any conhol that is needed to tie the older and recent topography surveys ,
together horizontally. '
• Permittingfor New Sta�m Drain Outfalls: Coordinate, complete permitting applications, and I
address comments for permitting associated with the new storm drain outfalls into the creek. The
anticipated permits for the storm drain outfalls are: California Department of Fish and Game
Streambed Alteration Agreement; North Coast Regional Water Quality Control Board 401
permit;and the United States Army Corp of Engineers 404 peanit. Services include an initial site
meeting and one additional site meeting that may be required with the permitting agencies. Based i
on similar projects and experience, it is assumed that the permitting associated with the above �
agencies will not include any biological or archaeological assessments, California Environmental
Quality Act (CEQA) documentation, eta [f during the permitting process any of these I
assessments or CEQA documentation is required, EBA will notify the City accordingly and
discuss any additional services prior to proceeding.
L:IprojecA90T�Proposa(IConb�acl Amendmenl 081013.DOC
825 Sonoma Avenue,Suite C • Santa Rosa,California 95404
(707)544-0784 • FAX(707) 544-0866 • www.ebagroup.com
• Landfill Gas (LFG) Collection Svsten:Desi�: and Pernzitting: Design a LFG collection system
for the Landfill to comply with Assemb]y Bill 32 (AB32) regulations and incorporate its
installation into the construction documents for the final closure construction project. Services
will include: LFG sampling and testing; preparation of a Design Plan meeting AB32
requirements; preparation of design drawings, technical specifications, and engineer's cos[
estimate; bidding assistance for the acquisition of a flare; and coordination and acquisition of an
Authority to Consiruct permit from the Mendocino County Air Qualiry Management District.
Please note that EBA recommends that the Ciry purchase the flare directly as opposed to
including this task as part of the final dosure construction bid. This approach will eliminate any
contractor markup on the flare, which would result in a $10,000 to $20,000 cost savings. Under
this scenario, the contractor for the final closure construction project would still be made
responsible for installing the flare. EBA's cost presented herein includes prepazation of a
separate bid package for flare manufacturers,as wel] as subsequent bid coordination and review.
The following provides a breakdown of the additional costs for the respective tasks described above. As
agreed upon during our August 14, 2013 site meeting, the costs were developed using EBA's current
billing rates.
• StabilityA»alysis: $ 9,500
• Supplenaental Topographic Survey: $ 4,000
• Pernzitting,for New Storm Drain Outfalls: $ 4,500
• LFG Collection System Design and Pennittirag.• 42 980
• Total Additional Costs: 8 60,980
A copy of EBA's Standard Schedule of Fees and Rates reflecting our current billing rates is attached. In
addition to using these rates to perfonn tlie aforementioned additional services, these billing rates will
also be used for the existing wntract balance for the final construction design as agreed upon during our
August 14, 2013 site meeting.
EBA appreciates the opportunity to be of service to the City on this project. If you should have any
questions regarding this amendment, please do not hesitate to contact ow office at(707)544-0784.
Sincerely,
EBA ENGINEERING
'�i�'-1 '
Mike Delmanowski,C.E.G., C.Hg.
Senior Hydrogeologist
�C��7��`������—
Damon F.Brown, C. G., g.
President
Enclosure: Standard Schedule of Fees and Rates
L:Iproject1907�PraposallContractAmendment08.20./3.DOC 2 �
I _. _. _ —_.__-__ — _ _ _ . _ _ ___ -_ .
E�A
ENGIIVEERING
STANDARD SCHEDULE OF FEES AND RATES
Principal Geologist/Principal Ei�gineer..............................................$165.00 per liour
Project Manager.................................................................................$120.00- $140.00 per hour
Senior Geologist/Senior Engiveer......................................................$120.00 - $140.00 per hour
Project Geologist/Project Engineer....................................................$ 95.00 - $135.00 per hour
Staff GeologisUStaff Engineer...........................................................$ 60.00 - $1 I5.00 per hour
Survey: 3 Man Crew..........................................................................$255.00 per hour
Survey: 2 Man Crew..........................................................................$225.00 per hour
Survey: 1 Man Crew..........................................................................$150.00 per liour
Senior Environmental Scientist/Specialist.........................................$ 95.00- $120.00 per hour
Environmental Scientist/Specialist....................................................$ 60.00 - $105.00 per hour
Design Draftsperson...........................................................................$ 85.00 - $100.00 per hour
Word Processing................................................................................$ 50.00 per hour
Adminisri•ative....................................................................................$ 60.00 per hour
Systems Manager...............................................................................$ 65.00 per hour
Depositions or couit proceedings.......................................................200% of usual rates
Subconsultants...................................................................................Cost plus 15%
Prints and materials............................................................................Cost plus 15%
Miscella�teous expenses.....................................................................Cost plus 15%
ETfective Februaiy 2012
L�.mauns 4nnn nlos!ea ScM1ednle febmnrc'_u L nac loge tlnc