HomeMy WebLinkAboutRau & Associates, Inc. 2008-06-11; Amendment 1 2011-08-30Agreement for (Description of Project): Anton Stadium Reconstruction Project Owner: City of Ukiah, 300 Seminary Avenue, Ukiah, California, 95482-5400 To (Consultant): Rau & Associates P.O. Box M Ukiah CA 95482 Change requested by: Community Services Department. You are hereby directed to make the herein described changes from the agreement for professional consulting services or do the following described work not included in the agreement: ESTIMATED ESTIMATED DECREASE To INCREASE To Description of Changes - Itemized Breakdown Agreement Amount Agreement Amount Modifications in accordance with Rau & Associates letter dated August 30, 2011, as follows: 1. Add consultations during Preliminary Foundation No Fee Excavation 2. Add review of foundation excavation conditions as construction proceeds. Work will a letter report upon No Fee completion of satisfactory foundation excavation. ESTIMATED NET CHANGE IN AGREEMENT PRICE No Fee TOTAL ESTIMATED FEE WITH THIS CHANGE $1,500 (previously invoiced and paid) This document will become a supplement to the agreement and all provisions will apply hereto. Approved B}~ _ - / ( ity) Date Accepted:.-°° (Consuffant) Date This information will be issued as a record of any changes to the original professional services agreement. GEORGE C. RAU, P.E. PRESIDENT JAVIER J. RAU VICE PRESIDENT ROGER VINCENT, P.E. CATHY A. McKEON, P.E. AND ASSOCIATES INC. CIVIL ENGINEERS • LAND SURVEYORS August 30, 2011 Mr. Guy Mills City of Ukiah Department of Public Works 300 Seminary Avenue Ukiah, CA 95482 Job Number R08087 RE: AMENDMENT #1 TO AGREEMENT FOR SERVICES FOR GEOTECHNICAL ENGINEERING FOR THE RECONSTRUCTION OF ANTON STADIUM Gentlemen: Rau and Associates, Inc. (RAU) was requested to provide additional services to the geotechnical engineering work authorized by the Agreement for Professional Services dated June 11, 2008. Additional tasks are to 1) Consult with the City and Construction Team about the preparation of soil under foundation elements, and 2) Review foundation excavations prior to concrete being placed. Proiect Description: Reconstruction of Anton Stadium The project was designed to have all floors at the approximate original ground elevation, with no basement structures. Concrete foundations and steel superstructure are to support a roof over the grandstand. New restroom facilities on the ground floor, with concrete slab-on-grade floors, complete the reconstruction elements. Construction drawings were prepared by Richard Ruff, Archtects, and structural design was provided by Mendocino Engineering. Ferranti Construction is the General Contractor. Chancre to Scope of Geotechnical Services The scope of work is increased now that the construction is definitive. Consultation about how the soil should be prepared under the concrete slab floors and roof support elements was done on August 17, 2011, in a discussion including the General Contractor and City Community Services Department Representative. The construction sequence of various foundation elements, and the ground preparation required prior to the excavation for those elements was discussed. Because the entire structure appears to be founded in original ground, and because of the network of trenches needed across the site to install utilities and foundation elements, no re-processing of the soils below the building pad was deemed necessary. This conclusion is subject to review and confirmation by a geotechnical engineer as the work progresses. Construction Drawings have been revised such that all foundation elements are intended be founded in undisturbed soil. A review of the conditions of the excavations will be made by a RAU geotechnical engineer to assure that there are not un-anticipated soil conditions prior to placement of reinforcement and concrete. 100 NORTH PINE STREET • P.O. BOX M • UKIAH, CALIFORNIA 95482 • 707-462-6536 • FAX 707-463-2729 www.rauandassoc.com Mr. Guy Mills August 30, 2011 Page 2 RAU will provide a letter report upon satisfactory completion of the foundation excavations describing soil and foundation conditions encountered and any measures taken which are different than shown on the Project Construction Drawings. RAU is willing to provide these additional services at no additional cost to the City as a contribution to the community effort on this project. Schedule: The review of foundation excavations will be coordinated with the General Contractor to conform to his schedule as much as is practical. Very truly yours, GE710 Exp. 09.30•`-~'~~ ,r., v ~It sq-Orec OF C George C. Rau, P.E. Registered Civil Engineer 21908 Expires 9-30-11 CONTRACT APPROVAL/AUTHORIZATION TO PROCEED Instruction: When requesting City Manager approval/signature on a contract, submit the attached checklist confirming proper reviewlapprovals have been obtained, insurance documents have been received and funding/expenditure authorizations approved. To: CITY MANAGER Submitted By: Date: 917 11 Apprv'I Apprv'I Apprv9 Not Recv'd Recv'd Description Required Yes No 1. Use of City's Professional Services Contract Template (pre-approved by City Attorney) S:ICity ManagerlRisk ManagementXContract Template Use of Vendors Contract (requires City Attorney review) Modified City Contract (requires City Attorney review) 2. Insurance Documents Received & Approved by Risk Manager YTi 3. Confirmed Sufficient Funding Available and expenditure approved. Attach documentation as necessary. 4. City Council Approved & Date 5. Other Documentation/Approvals: 6. For Consultants Only - Scope of Work Reviewed by City Attorney for Conflict of Interest Disclosure. Rev 5/07 c- h L~ i' 'P eSv~ LD Cv'la~ ~a l +1 e # i il✓ -C . sj, 6 .r 0 ~t CL) I k". off, G VVX 4 ',}-42/22/2008 8:37 AM J / l Jane, Attached for you review and signature is an Agreement for Professional Consulting Services with Rau and Associates, Inc. Rau and Associates is a general civil engineering firm in Ukiah. The agreement is our standard agreement (no changes). The service to be performed is the preparation of geotechnical evaluation for the reconstruction of Anton Stadium. The cost for these services is $1,500 therefore does not require a Report to City Council. Purchasing has confirmed that the required insurance is on file with the city. Tha - s GU Mi s Project & Grant Administrator 467-5719