HomeMy WebLinkAbout2011-06-15 Powerpoint - 2010 Urban Water Management Plan (2)
CarolloTemplateWaterWave.pptx
Public HearingPublic Hearing
June 15, 2011June 15, 2011
Introductions
•City Staff
–Tim Eriksen: Public Works Director
–JarodThiele: Public Works Administration
–Paul Smith: Water Treatment Plant Supervisor
•Carollo Engineers
–Paul Friedlander: Project Director
–Tommy Greci: Project Manager
•Wagner & Bonsignore
–Robert Wagner
–Emily MacDonald
CarolloTemplateWaterWave.pptx
2
Agenda
•UWMP Background
•Supplies
•Historic and Projected Demands
(SBx7-7)
•Conservation
•Conclusions
•Adoption Schedule
CarolloTemplateWaterWave.pptx
3
UWMP Background
•Urban Water Management Planning Act (UWMPA)
–In 1983, State Assembly Bill 797 modified the
California Water Code Division 6, by creating the
UWMPA.
–Several amendments to the original UWMPA have
increased data requirements and planning elements
to be included in the 2005 and 2010 plans.
CarolloTemplateWaterWave.pptx
4
UWMP Background
•2010 Urban Water Management Plan
–Required by California Water Code
–Must be updated every 5 years
–Must Satisfy the requirements of the Urban Water
Management Planning Act and recent amendments.
–Water Conservation Bill of 2009 (SBx7-7)
–Applies to utilities that supply 3,000 acre-feet or
3,000 connections
CarolloTemplateWaterWave.pptx
5
Purpose
•Update DWR on local existing and planned water
supplies (quantity and quality impacts)
•Maintain efficient use of urban water supplies
•Continue to promote conservation programs and
policies
•Ensure that sufficient water supplies are available
for future beneficial use
•Provide a mechanism for response during water
drought conditions
CarolloTemplateWaterWave.pptx
6
Components of the 2010 UWMP
•Plan Preparation
•System Description
•System Demands
•System Supplies
•Water Supply Reliability and
Water Shortage Contingency
Planning
•Demand Management
CarolloTemplateWaterWave.pptx Measures
7
Agenda
•UWMP Background
Supplies
•
•Historic and Projected Demands
(SBx7-7)
•Conservation
•Conclusions
•Adoption Schedule
CarolloTemplateWaterWave.pptx
8
Existing Supply Facilities
Production
Capacity
Current
FacilityType of SupplyStatus(GPM)
•Supply Facilities
RanneySurface waterActive3,194
Collector(2)
–Five active wells
Well #3Groundwater influenced Active600
–One Ranneycollector
by surface water
Well #4GroundwaterActive799
•Supply Capacity
Well #5Groundwater influenced Active300
by surface water
–6,386 gpm
Well #7GroundwaterActive799
Well #8GroundwaterActive694
–9.2 mgd
Total Active Well Capacity (GPM)6,386
Total Active Well Capacity (AFY)10,308
Notes:
1.Source: City staff records.
2.The RanneyCollector can only be used during the dry season when surface
water turbidity is low.
CarolloTemplateWaterWave.pptx
9
Surface Water Sources
CarolloTemplateWaterWave.pptx
10
Groundwater Basin
CarolloTemplateWaterWave.pptx
11
Projected Supply
Sources
CarolloTemplateWaterWave.pptx
12
Agenda
•UWMP Background
•Supplies
Historic & Projected
•
Demands (SBx7-7)
•Conservation
•Conclusions
•Adoption Schedule
CarolloTemplateWaterWave.pptx
13
Historical PopulationProjected PopulationHistorical PopulationYear Population 20352030202520202015201020052000199521,00020,00019,00018,00017,00016,00015,00014,000Projected PopulationHistorical
PopulationYear Population 20352030202520202015201020052000199521,00020,00019,00018,00017,00016,00015,00014,000 Year Population 20352030202520202015201020052000199521,00020,00019,00018,00017,00016,000
15,00014,000 Projected Population
Population Projections
21,000
20,000
19,000
Population
18,000
17,000
16,000
15,000
14,000
199520002005201020152020202520302035
Year
CarolloTemplateWaterWave.pptx
Historical Population
Projected Population
14
0 PopulationHistorical DemandYear Water Demand (Million Gallns per Year)Population 2010200019951,5001,2501,000750500250018,00016,00014,00012,00010,0008,0006,0004,0002,0000PopulationHistorical
DemandYear Water Demand (Million Gallns per Year)Population 2010200019951,5001,2501,000750500250018,00016,00014,00012,00010,0008,0006,0004,0002,0000 Year Water Demand (Million Gallns
per Year)Population 2010200019951,5001,2501,000018,00016,00014,00012,00010,0008,0006,0004,0002,000
Historical Population and Water
Demands
1,50018,000
16,000
Water Demand (Million Gallns per Year)
1,250
14,000
1,00012,000
Population
10,000
750
8,000
5006,000
Historical DemandPopulation
4,000
250
2,000
00
CarolloTemplateWaterWave.pptx
1995200020052010
Year
15
Per-Capita Demands
260
240
220
200
Water Use (gpcd)
180
160
140
120
100
Annual Per Capita
80
Water Use
60
40
20
0
1995200020052010
Year
CarolloTemplateWaterWave.pptx
16
2020 Water Conservation Targets
•Four Methods Established
by DWR
–Method 1 –Baseline
Reduction Method
–Method 2 –Efficiency
Standard Method
–Method 3 –Hydrologic
Region Method
–Method 4 –BMP Based
Method
CarolloTemplateWaterWave.pptx
17
Daily Per Capita Water UseSeries1 Year Water Use (gpcd)2010200520001995260250240230220210200190180170160 Water UseYr Baseline -Selected 10UseDaily Per Capita Water Year Water Use (gpcd)20102005200019
95260250240230220210200190180170160 gpcdYear Baseline = 232-10Year Water Use (gpcd)2010200520001995260250240230220210200190180170160
Method 1 –Baseline Reduction Method
•20% Reduction in Baseline Water Use
260
250
240
Water Use (gpcd)
230
220
210
10-Year Baseline = 232gpcd
200
190
Daily Per Capita Water
Use
180
Selected 10-Yr Baseline
Water Use
170
160
1995200020052010
Year
–10-Year Baseline = 232 gpcd
CarolloTemplateWaterWave.pptx
–2020 Water Use Target = 185 gpcd
18
Preliminary Water Use Target
Conservation Target (gpcd)Reduction by 2020 (%)
From From 2010
Supply SourceYear 2015Year 2020BaselineUsage
(1)(2)
Method 120818520%-10%
Method 2n/an/an/an/a
23%
Method 318113044%
-7%
Method 420618022%
Notes:
1) Baseline use is 232 gpcd
2) 2010 use is 168 gpcd
250
10-Year BaselineWater Use = 232 gpcd
240
2015 Interim Target = 208 gpcd
230
220
Water Use (gpcd)
210
200
190
180
CarolloTemplateWaterWave.pptx
170
2020Water Use Target = 185 gpcd
160
150
199520002005201020152020202520302035
Year
19
Annual Water UseSelected 10-Yr Baseline Water UseProjected Water Use
Agenda
•UWMP Background
•Supplies
•Historic and Projected
Demands (SBx7-7)
Conservation
•
•Conclusions
•Adoption Schedule
CarolloTemplateWaterWave.pptx
20
Conservation
5.0
Baseline WaterUse = 232 gpcd
4.5
4.0
Water Use (mgd)
3.5
3.0
2.5
2.0
2015 WaterUse = 208 gpcd
1.5
2020 WaterUse = 185 gpcd
1.0
0.5
0.0
199520002005201020152020202520302035
Year
Historic Water Use
Target Projected Water Demand
CarolloTemplateWaterWave.pptx
Baseline Projected Water Demand
21
Conservation -Demand Management
Measures
Cost Effective
Planned for Analysis Not
Demand Management MeasureImplementedImplementationCompletedApplicable
DMM 1 -Water Survey
Programs
DMM 2 -Residential Plumbing
Retrofit
DMM 3 -Water System Audits
DMM 4 -Metering with
Commodity Rates
DMM 5 -Landscape Irrigation
Programs
DMM 6 -Washing Machine
Rebate Program
CarolloTemplateWaterWave.pptx
DMM 7 -Public Information
Program
22
Conservation -Demand Management
Measures
Cost Effective
Planned for Analysis Not
Demand Management MeasureImplementedImplementationCompletedApplicable
DMM 8 -School Education
Program
DMM 9 -Commercial,
Industrial, and Institutional
Conservation Programs
DMM 10 -Wholesale Agency
Programs
DMM 11 -Conservation Pricing
DMM 12 -Water Conservation
Coordinator
DMM 13 -Water Waste
Prohibition
CarolloTemplateWaterWave.pptx
DMM 14 -Ultra Low Flush
Toilet Replacement
23
Agenda
•UWMP Background
•Supplies
•Historic and Projected
Demands (SBx7-7)
•Conservation
Conclusions
•
•Adoption Schedule
CarolloTemplateWaterWave.pptx
24
Conclusions
•Demand Projections
–Year 2010: 4,068 afy(baseline, not actual)
–Year 2035: 4,173 afy(with SBx7-7 targets)
•Water Conservation
–Method 1 selected
–Baseline 232 gpcd
–Year 2020 Target 185 gpcd
–Year 2010 was 168 gpcd (below 2020 target)
CarolloTemplateWaterWave.pptx
25
Agenda
•UWMP Background
•Supplies
•Historic and Projected
Demands (SBx7-7)
•Conservation
•Conclusions
Adoption Schedule
•
CarolloTemplateWaterWave.pptx
26
Schedule
AugSepOctNovDecJanFebMarAprMayJunJul
6/30
PRD
Preparation
of UWMP
Draft
3/8
Guidebook Release
Final to DWR
Public
60-Day Notification
Review
Public Review
Process
6/15
6/8
Workshop
Public
& Council
Workshop
Meeting
Public Hearing
CarolloTemplateWaterWave.pptx
& Adoption
7/1 DWR’s Adoption Deadline
7/15 DWR’s Submittal Deadline
27
2010 UWMP
•Ukiah Civic Center
•www.cityofukiah.com
CarolloTemplateWaterWave.pptx
28
CarolloTemplateWaterWave.pptx
Public HearingPublic Hearing
June 15June 15 thth, 2011, 2011
Q&AQ&A
CarolloTemplateWaterWave.pptx
30