Loading...
HomeMy WebLinkAboutGreen Valley Consulting Engineers 2010-06-24; Amendment 1 2010-11-05CITY OF UKIAH AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED JUNE 24, 2010 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated June 24, 2010 shall remain in force and effect except as modified by this first amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 1. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the November 5, 2010 letter proposal from Green Valley Consulting Engineers. A copy of said letter is included in this first amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $22,095. GREEN VALLEY CONSULTING ENGINEERS ,2s BY: ELIZABETH ELLIS Principal CITY OF UKIAH BY:~ 0it NE CHAMBERS y Manager 12- h-cl /I c) /Z-&? I - . 5 DATE DATE' Amendment No. 1 to Agreement for Professional Consulting Services G ree w-11 t- a 6 CONSULTING ENGINEERS, i\'- '!')f is `1" J( llh' 14,a1.II'.CJ I i:,lll iii:::\='•r November 5, 2010 Mr. Tim Eriksen Public Works Director City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 Re: Gobbi Street/Oak ManorBabcock Lane Intersection City of Ukiah Contract 09-02 !1;11 1-100n, "I MIA il''-.Illel Il. :rl a}Jr?:l(i~•:III`1,1 Subject: Request for Amendment #1 to our Construction Management & Inspection Contract Dear Tim: We are writing to request an amendment to our original contract for inspection and construction management services associated with the Gobbi Street/Oak Manor/Babcock Lane Intersection Improvement Project. Our original contract was for the amount of $123,020 and we are requesting an additional $22,095. This request for additional budget is to compensate Green Valley for additional work performed from October 25, 2010 thru the completion of the project. The project is estimated to be complete December 3, 2010 for the physical work, with an additional 7 days needed for the closeout work (change orders, PG&E claim, Granite claims, as-built drawings, final payments, project files). Factors that could impact this estimated completion date are the weather and removal of the PG&E joint pole. In addition, based on conversations with the Contractor, we have taken into account the fact that the project will be shut down on Thanksgiving week. have estimated that inspection will average 4 hours per day for 10/25/10 through 11/1910 and 11/29/10 through 12/5/10. Inspection = 25 days @ 4 hours/day @ $117/hour (includes vehicle) = $11,700. 1 have estimated that Construction Management will average 3 hours per day for 10/25/10 through 11/24/10 and 11/29/10 through 12/10/10. CM = 33 days @ 3 hours/day @ $105/hour = $10,395. Total for Amendment #1 is $22,095. Additional Scope of Services The following construction issues have resulted in delays to the project and added an increased number of working days, which necessitated additional inspection and construction management time. 335 Tesconi Circle, Santa Rosa, California 95401 • web www.gvalley.com • tel 707.579.0388 • fax 707.579.3877 G r e ie n`~I.., 7 CONSULTING ENGINEERS,.' Its:. -flu li is-i ~~l:'.:I ri.i L.I~:.-;.IIII;Ci i r)r11 ?I"~r~'\~~•; PG&E Gas Line in Stream Channel i VII ;•I~;~I~IIi`i'1 ;I Iti „'~I}Si; ur il~-,I-; ii;all„(.Il•i It ~~I. PG&E delayed removing the gas main from the creek channel from approximately May 2010 until the end of October 2010. The gas line was so close to the wing-wall footing that the Contractor was forced to hand-dig for the footing. The gas line was ultimately exposed and required the Contractor to pull it away from the footing per direction of PG&E. Additionally, Fish & Game and Water Quality permits required all work to be out of the stream area by October 15, 2010. We were able to obtain a Fish & Game extension. In spite of numerous phone calls, e- mails, & meetings, PGE delayed removing the gas main out of the stream until October 22, 2010. The PG&E delay also delayed the Contractors work on the wing-wall & installation of rock slope protection (RSP) in the stream area. PG&E Joint Pole PGE has delayed removing the joint pole from the middle of the intersection until November 19, 2010 from the original date of May, 2010. The Contractor was able to do some work around the pole but this delayed the overall completion of the project, pushed the project into the rainy season, and added change order costs to the City. Additional Design Work There were changes to the project that required design work. In lieu of having the designer (in Eureka) prepare these designs, we determined that the City could save money and delays to the project if Green Valley did this design work. There were ten small design projects for adding new facilities and re-designing of existing facilities. This design was tracked on a separate charge number although the time spent has been charged against the CM budget. Relocate Pedestrian Bridge at School There is consideration for replacing the existing pedestrian bridge at Oak Manor School with the Gobbi pedestrian bridge that was removed from the Gobbi Project. Our additional CM time has been for various meetings with the school officials, Assistant City Manager, Green Valley survey crew, Contractor, and City Public Works. "Friends of Gibson Creek" I received about eight a-mails from this environmental watch dog group that the City asked me to respond to. In addition I was required to attend meetings with City Planning Department, on site with an arborist, and prepare change orders for special tree protection measures. 335 Tesconi Circle, Santa Rosa, California 95401 • web www.gvalley.com • tel 707.579.0388 • fax 707.579.3877 Green aekyp CONSULTING ENGINEERS,-' 1; . itm ''i r' 1. e; 1 IU lhlltl Babcock Bridge Installation rnIfill. ,(irrl Ilc;in:r Iui ( 01 i <;I ~,,Irrlt 11r)r; i1I~111..1i 9i !ti:.'rI!- In1~lr~ .llYr;r"~I!}t1 During construction the Contractor installed the pre-cast bridge sections approximately 1" too high. Added costs to the CM budget were for the Green Valley survey crew to check grades to determine if this affected anything else, like the profile grade. Electrical conduit The City Electrical Department had the Contractor install new electrical conduit through the new Bridge and connect to new vaults under a change order. I understand that that the Contractor's installation cost will be reimbursed to Public Works. However the CM and inspection costs were charged against the original budget and there were about 20 hours of my time for design and meetings and 6 days for inspection time. If you feel that we have overlooked something or are missing any relevant information, please do not hesitate to contact me. Thank y r y r consideration in amending our contract. ene Harris Construction Manager c. Liz Ellis, Principal Delia H., Admin 335 Tesconi Circle, Santa Rosa, California 95401 • web www.gvalley.com • tel 707.579.0388 • fax 707.579.3877