HomeMy WebLinkAboutGreen Valley Consulting Engineers 2007-11-02; Amendment 3 2008-10-07CITY OF UKIAH AMENDMENT NO. 3 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED NOVEMBER 2, 2007 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated November 2, 2007; the first amendment dated October 7, 2008; and the second amendment dated October 14, 2008; shall remain in force and effect except as modified by this third amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 3. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the June 15, 2010 letter proposal from Green Valley Consulting Engineers. A copy of said letter is included in this third amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $22,995. GREEN VALLEY CONSULTING ENGINEERS 1~~ BY: l ELI H ELLIS Principal CITY OF UKIAH BY: ANE CHAMBERS City Manager DATE 12,0 l C'~ DAT Amendment No. 3 to Agreement for Professional Consulting Services GreenValley CONSULTING ENGINEER Restoring Yesterday . , . Creating Tomorrow June 15, 2010 Mr. Rick Seanor, P.E. Deputy Director of Public Works City of Ukiah Public Works Dept. 300 Seminary Avenue Ukiah, CA 95482 municipal engineering civil engineering construction management landscape architecture land surveying Re: Additional Services Associated with Curb Radius Improvements at SW Corner of Gobbi & State Streets - Amendment #3 Dear Rick: Per your request and previous phone conversations, we have enclosed a brief scope of services and associated fee for the curb return improvements associated with the SW corner of Gobbi and State Streets. It is our understanding that the City wishes to expand the scope of services that were performed under contract amendment #2, to include a much larger radius than what was proposed. We have increased the radius from approximately 12' to the current 25', which will facilitate larger trucks in the turning movements. Our Understanding We understand that the City would like to increase the radius of the referenced intersection at the SW corner beyond what was originally agreed upon in order to accommodate truck turning movements, as feasible. The increased radius will require the modification of the existing traffic signal, storm drain and catch basin relocation, extensive concrete reconstruction, and the preparation of legal documents for right of way acquisition. The proposed work will be coordinated with our existing project and included in the set of plans that have been prepared for advertisement and construction this summer. The final improvements to the SW corner will result in a dedicated right turn lane with a stacking length as feasible within the physical constraints of the corner. We will work with WTrans Traffic Consultants for the preparation of the signal modification plans and have included their scope of work and associated fee below. 75% Design and Improvement Plans We will submit revised 75% design documents that will incorporate the proposed additions above, including: the structural section details for the widened curb return, horizontal limits proposed for the curb return, turn lane and the pavement reconstruction improvements, and the detailed grading plan for ramp conforms, striping and signing, and conceptual signal modification plans (electric plan, details and schedules, signal interconnection system modifications). The plan sheet will indicate existing right-of-way lines and any pertinent easements, topographic features, and existing utility systems. Previous project specifications that were submitted for the water main and pavement reconstruction improvements will be amended for the additional work to allow for subsequent advertising. Upon approval of our preliminary layout, we will prepare the necessary R sheet and legal description to allow the City to negotiate for the needed right of way. 335 Tesconi Circle, Santa Rosa, California 95401 • web www.gvalley.com • tel 707.579.0388 d, fax 707.579.3877 municipal engineering GreenValley civil engineering CONSULTING E'N G I N E E R-S I construction management landscape architecture Restoring Yesterday Creating Tomorrow land surveying An updated cost estimate will also be submitted to allow for budgeting purposes. 100% Design and Improvement Plans A 100% submittal of the plans will incorporate all comments from the 75% review, as well as results of utility company reviews of the plans. The civil component will include final grading details, storm drain relocations, striping and signing and any miscellaneous details will be included. The electrical plans will include existing and proposed conduits, pull boxes, poles, vehicle and pedestrian heads, detector loops, controller and service cabinets, luminaires, conductor and equipment schedules, preemption equipment and pertinent notes, including those necessary to ensure that Contractor maintain an operation signal during construction. Construction documents will be prepared in accordance with the City of Ukiah Design and Construction Standards. The final cost estimate will updated to incorporate current bid results. Fee for Amendment #3 $22,995 Thank you again for the opportunity to submit a proposal for our services. Should you accept our proposed scope of services and associated fee, Green Valley can begin work upon authorization to proceed. We look forward to hearing from you and please do not hesitate to contact us with any questions you may have. Sincerely, Liz Ellis, P.E. Principal 335 Tesconi Circle, Santa Rosa, California 95401 • web www.gvalley.com 9 tel 707.579.0388 * fax 707.579.3877