HomeMy WebLinkAboutR.W. Beck, Inc. 2007-03-21; Amendment 1 2008-08-27August 27, 2008 Mr. Mel Grandi Utilities Director City of Ukiah, Electric Utility 411 West Clay Street Ukiah, CA 9548 Subject: Additional Engineering Services for Gobbi Substation Relocation Dear Mr. Grandi: As previously discussed, the current plans for the City of Ukiah (City) substation upgrade have changed since the original Scope of Services was prepared. The revised plan includes a new substation on a new site instead of a modification to the existing site. Therefore, we are providing a modification to the original Scope of Services. The new substation would include three 20/26.6/33.3//37 MVA transformers, four 115 kV circuit breakers, 115 kV steel structures and bus work, and a prefabricated control building. The control building would house the 12 kV switchgear, protective relaying, DC battery system, and communication equipment. The 12 kV switchgear will consist of three 2000 A main buses, three 2000 A main breakers, two 2000 A bus tie breakers, and twelve 1200 A feeder breakers. The estimated dimensions of the site will be 250' x 200'. The substation will be enclosed by a seven foot fence with two 20-foot access gates opening on to Orchard Avenue. Additionally, in order to integrate the new substation into the existing system and relieve the current underground congestion along Orchard Avenue, the proposed scope additions include distribution design along Orchard Avenue and Ford Street and along Gobbi to the railroad. Other services offered to provide benefit to the City during the project include the California Environmental Quality Act (CEQA) Environmental Process and assistance in procuring, evaluating and installing a radio link from the Hydro Plant to the City Hall. Scope of Services The proposed additional Scope of Services would include the following: Additional Substation Engineering Services Additional work relating to expanding the general arrangement Additional work relating to expanding the electrical plan and sections Additional work relating to the conduit plan and circuit lists Additional work relating to the grounding plan and calculations Additional foundation design and calculations Development of site plan Development of grading plan and details Development of fencing plan and details A masonry fence will be utilized for the perimeter of the substation. Additional shop drawing review 131 Mir Parkway, Suite 300 Heudersonville.'IN 37075 Phone (615) 431-3200 Fax (615) 824-7570 Mr. Mel Grandi August 22, 2008 Page 2 of 5 Demolition coordination of the existing site Transmission line design for extension of existing line to the new site The additional services assumes existing line will extend due west with 2-3 additional structures required. 11 Geotechnical investigations for new site Two additional site visits during construction CQA Environmental Services R. W. Beck will retain a Subconsultant to develop the CEQA process. Based on review and discussions, the City and R. W. Beck has selected LACO Associates as the CEQA Subconsultant. The Subconsultant will work with the City and R. W. Beck to develop an initial Study. This service assumes a Mitigated Negative Declaration would be the appropriate document for the proposed project. The Scope of Services provided by the Subconsultant is enclosed as Exhibit A. R. W. Beck will provide task oversight and technical information for the Study, including the following: Provide detailed project management plan, including Scope of Services, staffing plan, project budget, schedule, risk assessment, and communications plan Conduct weekly project team action-item review meetings through teleconference call Maintain and distribute detailed action-item list Prepare monthly progress reports, including summary of accomplishments, progress to completion of milestones and deliverables, comparison of current and cumulative actual and budgeted labor and costs, and evaluation of issues that could negatively impact project completion Prepare and distribute agendas and minutes from project meetings Coordinate project team, staffing and subcontractors Provide monthly project updates with the City via teleconference Provide technical assistance as needed for CEQA checklist Provide drawings and maps needed for CEQA checklist Provide technical assistance to the City, as needed, to define the substation technical issues for the process Underground Distribution Design R. W. Beck will provide detailed design for the underground distribution design along Orchard Avenue from the substation site to the Ford Street intersection and from the substation along Gobbi to the west side of the railroad tracks. The design will relieve congestion in the existing duct bank and manhole system, and provide interconnections to the new substation. Tasks for the design will include the following: Field topographical survey from substation to Ford Street along Orchard Avenue and from substation to west of railroad tracks along Gobbi and from substation to Talmadge Street along Orchard Mr. Mel Grandi August 22, 2008 Page 3 of 5 Survey will be limited to above grade facilities. The City should provide invert elevation and modeled detail of underground City and facilities. Survey and processing services for lot line adjustment for new site Survey and processing services for abandonment of existing utility easement on substation property Develop plan view of modifications Develop profile view of modifications 11 Develop switchgear and manhole details Develop specifications for inclusion into the Construction Contract for the project Develop detailed one-line drawings for integration of existing UG radials, switchgear and transformers with new facilities. Develop duct bank details with duct cross-section drawings, as required Perform cable ampacity and pulling calculations Develop sectionalizing and protection scheme for the area being modified with this project radio System for Hydro Plant R. W. Beck will assist the City to procure a microwave point to point radio system for the communications to the Hydro Plant from City Hall. The assistance will be in the form of soliciting quotations from potential vendors of this type of equipment, evaluating the quotations and preparing performance installation specifications and drawings. Assistance will be limited to the radio equipment and will not include the network engineering for the connections or tower design or modifications. Deletion of Distribution Line Design (4.25-miles of Overhead Construction from Substation to Hydro Plant) Based on our discussions, the City has elected to remove this project from the Capital Improvement Plan. The revised Scope of Services include a deduction for the engineering included in the original Scope of Services minus services provided to date. On-site Construction Management Services (Optional) R. W. Beck can provide on-site construction management, if requested. This would include an on-site field representative for the duration of the on-site activities. Construction Management Services provided during construction would include: Providing one full-time, on-site construction manager/inspector for the duration of project construction (for budgeting purposes assumed to be six months) Assisting Ukiah in coordinating and hosting a pre-construction meeting Observing construction to review conformance of construction with the contract documents and intent of design Periodically review delivery of materials and its impact on the project schedule Providing day-to-day information on the status of construction and the project schedule Mr. Mel Grandi August 22, 2008 Page 4 of 5 Observing site operations; foundation construction; equipment placement; structure erection; subsurface facilities; and contractor field testing, start-up, and final cleanup Preparing and maintaining records to document receipt of Ukiah furnished material (if applicable), construction activities, contractor's project staffing by crafts, construction progress, and meeting minutes Observing tests and checks throughout the construction period, such as concrete cylinder tests, soil compaction test, survey checks, and testing of electrical and mechanical equipment and systems Maintaining records of construction changes and check that the contractor does likewise, so that after the project's completion, drawing revisions can be made to provide accurate conformed-to- construction record drawings Attending project meetings held by the contractor 11 Responding to RFIs and questions that arise during construction Reviewing construction contractor requests for payment 11 Reviewing construction contractor change requests Providing monthly project progress reports on budget and schedule performance, as well as any obstacles and recommended solutions Fee for Additional Services The additional Scope of Services presented herein will be provided for the not-to-exceed amount as indicated in the table below. R. W. Beck shall not be required to furnish additional services or incur additional expenses above the total project fee without written authorization and additional funding from the City of Ukiah. This proposal will remain valid for 45 days from the date first written above. Additional Substation Ei glnoo[,ng 30)r,,O s $ 110,065 CEQA Environmental Services $ 48,337 Underground Distribution Design $ 105,432 Radio System for Hydro Plant $ 7,539 Additional Services Total: $ 271,373 Adjustment to Task 8 - Hydro Circuit - $ 99,489 Total Adjustment to Original Contract $ 171,884 Original Contract $ 490,287 Total Amended Contract $ 662,171 Optional Construction Management (estimated) $ 265,000 Mr. Mel Grandi August 22, 2008 Page 5 of 5 If the proposed services and fee meet with your approval, please authorize below and return one copy of this agreement to my attention for our records. R. W. Beck will provide the services described herein pursuant to the Professional Services Agreement between the City of Ukiah and R. W. Beck dated March 21, 2007. Thank you for the continued opportunity to provide our services to the City of Ukiah. Sincerely, R. W. BECK, INC. Anthony Hanson, P.E. Project Manager encl: Exhibit A - LOCA Associates Scope of Services Authorization CITY OF UKIAH Signed Printed , .lane Chambers Title Date September 29. 2008 Authorization o Optional Services CITY OF UKIAH Signed Printed Title Date R. W. BECK, INC. Signed Printed Keith Deaton Title Principal and Regional Practice Manager Date August 22, 2008 R. W. BECK, INC. -4 .4 Signed t Printed Keith Deaton Title Principal and Regional Practice Manager Date August 22, 2008