HomeMy WebLinkAboutKG Walters Construction 2009-07-16; Amendment 1 2009-11-03CITY OF UKIAH AMENDMENT NO. 1 TO AGREEMENT FOR GOBBI STREET WELL CONSTRUCTION DATED JULY 16, 2009 TERMS AND CONDITIONS All terms and conditions of the Agreement for Gobbi Street Well Construction dated July 16, 2009 shall remain in force and effect except as modified by this amendment. AUTHORIZATION Upon execution of this amendment, additional compensation will be paid to the Contractor as a result of the circumstances described under the Scope of Additional Work identified in this Amendment No. 1. SCOPE OF ADDITIONAL WORK This amendment is to provide compensation for extra work and schedule delays caused by the State's water shortage from a three year drought, an order from the California Water Quality Control Board (WR 2007-0015-DWR) and equipment failure at Well #4. K.G. Walters was not able to proceed with the construction of the Gobbi Street pump station as originally scheduled. They were also directed to work out of sequence which caused an increase in overhead and delayed the project. - COMPENSATION Compensation for the increased overhead costs and delays shall be made on a time and expense basis at Contractor's customary fees. Compensation shall not exceed $13,835.00. K.G. WALTERS BY: ALT JJ HNSON President /4) L-2 5 DATE CITY OF UKIAH DAT Amendment No. 1 to Agreement for Gobbi Street Well Construction C, ONS ro uc ri vm Prime Contract Change Order Detailed, Grouped by Each Number Gobbi Street Water Well Project # 0904 K. G. Walters Construction Co., Inc. Comer of Gobbi St & S. Orchard Tel: Fax: Ukiah, CA 95482 Date: 10/2912009 To Contractor: K. G. Walters Construction Co., Inc. P. O. Box 4359 195 Concourse Blvd., Suite A (95403) Santa Rosa, CA 95402 Architects Project No: 0904 Contract Date: 7/19/2009 Contract Number: 0904-000 Change Order Number: 002 The Contract is hereby revised by the following items: PCO #004 PCO Description Amount 004 Delay caused extended overhead 13,835 Additional time assoicated with these changes is approved, however time extensions are ongoing as the City works throught the permit process to allow final start-up of the pump station. Based on verbal approval from Owner K.G. Walters created this Change Order. The Original Contract Value was 332,517 Sum of changes by prior Prime Contract Change Orders 29,825 The Contract Value prior to this Prime Contract Change Order was 362,342 The Contract Value will be changed by this Prime Contract Change Order in the amount of 13,835 The new Contract Value including this Prime Contract Change Order will be 376,177 The Contract duration will be changed by..... deferred/ongoing 0 Days The revised Substantial Completion date as of this Prime Contract Change Order is HDR Engineering K. G. Walters Construction Co., Inc. City of Ukiah ARCHITECT CONTRACTOR OWNER 2365 Iron Point Road, Suite 300 P. O. Box 4359 300 Seminary Avenue Folsom, CA 95630 195 Concourse Blvd., Suite A (95403) Ukiah, CA 95482-5400 Santa Rosa, CA 95402 Address Address Address By - By By i - SIGNAT SIGNATURE SIGNATU DATG DATE _ r DATE Prolog Manager Printed on: 10/29/2009 KG Walter Corporation Page 1