HomeMy WebLinkAboutKG Walters Construction 2009-07-16; Amendment 1 2009-11-03CITY OF UKIAH
AMENDMENT NO. 1
TO AGREEMENT FOR GOBBI STREET WELL CONSTRUCTION
DATED JULY 16, 2009
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Gobbi Street Well Construction dated
July 16, 2009 shall remain in force and effect except as modified by this amendment.
AUTHORIZATION
Upon execution of this amendment, additional compensation will be paid to the
Contractor as a result of the circumstances described under the Scope of Additional
Work identified in this Amendment No. 1.
SCOPE OF ADDITIONAL WORK
This amendment is to provide compensation for extra work and schedule delays caused
by the State's water shortage from a three year drought, an order from the California
Water Quality Control Board (WR 2007-0015-DWR) and equipment failure at Well #4.
K.G. Walters was not able to proceed with the construction of the Gobbi Street pump
station as originally scheduled. They were also directed to work out of sequence which
caused an increase in overhead and delayed the project. -
COMPENSATION
Compensation for the increased overhead costs and delays shall be made on a time
and expense basis at Contractor's customary fees. Compensation shall not exceed
$13,835.00.
K.G. WALTERS
BY:
ALT JJ HNSON
President
/4) L-2 5
DATE
CITY OF UKIAH
DAT
Amendment No. 1 to Agreement for
Gobbi Street Well Construction
C, ONS
ro uc ri vm
Prime Contract Change Order
Detailed, Grouped by Each Number
Gobbi Street Water Well Project # 0904 K. G. Walters Construction Co., Inc.
Comer of Gobbi St & S. Orchard Tel: Fax:
Ukiah, CA 95482
Date: 10/2912009
To Contractor:
K. G. Walters Construction Co., Inc.
P. O. Box 4359
195 Concourse Blvd., Suite A (95403)
Santa Rosa, CA 95402
Architects Project No: 0904
Contract Date: 7/19/2009
Contract Number: 0904-000
Change Order Number: 002
The Contract is hereby revised by the following items:
PCO #004
PCO Description Amount
004 Delay caused extended overhead 13,835
Additional time assoicated with these changes is approved, however time extensions are ongoing as the City works throught the permit
process to allow final start-up of the pump station.
Based on verbal approval from Owner K.G. Walters created this Change Order.
The Original Contract Value was 332,517
Sum of changes by prior Prime Contract Change Orders 29,825
The Contract Value prior to this Prime Contract Change Order was 362,342
The Contract Value will be changed by this Prime Contract Change Order in the amount of 13,835
The new Contract Value including this Prime Contract Change Order will be 376,177
The Contract duration will be changed by..... deferred/ongoing 0 Days
The revised Substantial Completion date as of this Prime Contract Change Order is
HDR Engineering K. G. Walters Construction Co., Inc. City of Ukiah
ARCHITECT CONTRACTOR OWNER
2365 Iron Point Road, Suite 300 P. O. Box 4359 300 Seminary Avenue
Folsom, CA 95630 195 Concourse Blvd., Suite A (95403) Ukiah, CA 95482-5400
Santa Rosa, CA 95402
Address Address Address
By - By By i -
SIGNAT SIGNATURE SIGNATU
DATG
DATE _ r DATE
Prolog Manager Printed on: 10/29/2009 KG Walter Corporation Page 1