HomeMy WebLinkAboutCity of Ukiah Electric Utility 2008-03-11OF UIGAH
E
& \ ~ a r\, C
referred to collectively a
order'to effectuate, the p
and the City of Ukiah's
Interconnection A.greem
Facilities of 1 Megawatt
Generator's generating f
generating capacity, and
than those described. A
1.
1.1
1.2
C
arties" a.
lions of
icable el,
) orL
es ide
not al
ingly,
TIONS
ustomer-Generator"), and the City of Ukiah,
individually as "Party", consistent with, and in
action 2827 if the California Public Utilities Code
tric rate schedules enter into this "Photovoltaic
Metering From Solar Electric Generating
This Agreement applies to the Customer-
Yed below with the specific characteristics and
interconnection or operation of facilities different
Parties agree as follows:
9
Number:
(Utility Log Number)
Tat
e 1 - List
1
f generating equipment interconnected with the
Cit.
i
of Ukiah
ectric Utility with an inverter {List the information
req
seed belo
for all inverters interconnected with the City of
Uk
"Electric
tility's distribution system. If more than one
ge
rator shat
the inverter, write, "shared" on the same line as
tha
enerator
der the manufacturer column and do not enter the
inv
-ter rating.
Attach list of additional equipment if applicable.)
Generator
Manufacturer
Inverter Model
Inverter
Ling (watt
for Inverter used.
Number
Rating (watts)
with Generator
1
6j0
t~Yn2r`~C A
s a nc) o us
-300c)
2
A~ 8, 'i)i1<s
Table 2
Ukiah El
(List the :
PV Array R
1.3 Site
1.4 Faci
1.5
1.6
1.7
2e
t of gener ing equipment interconnected with the City of
is Utility ithout an inverter
)rmation re i nested below for all generators directly
rd without n inverter to the City of Ukiah Electric Utility's
ystem. At ach list of additional equipment if applicable.)
ling:., M
will be ady for operation on or about
(Date)
Lo4ion of Cit~jof Ukiah Designated Switching:
Loc ion of CitJof Ukiah Customer Contact:
Cust
mer-Gene
tar has elected to operate its solar-electric
gene
Ling facili
in parallel with the City of Ukiah's transmission
and
stribution
cilities. The solar-electric generating facility is
inter
, led primari
to offset part or all of the Customer-Generator's
own
lectric req
uirements,
Cust
er-Gene
for shall not commence operation of the Facility
until
he City of
Ukiah Electric Utility has given written approval
of th
interconn
tion facility.
qL_usiomer-ijenerato
s electric i
winter times are the
arise as the
Generator may (at it s
option) p<
with the understand
gthat any
set forth herein. At
e end of c
of final interconnect
n of the C
Generator's charges
or any net.
Generator's electric r
ite schedu
e schedule shall remain the same. Sumner and
urrent rate schedule definitions. Customer-
any amount for electric utility charges monthly,
id all payments will be reconciled annually as
xy twelve (12) month period following the date
;comer-Generator's PV system, the Customer-
iergy consumption as defined in the Customer-
The Customer-Generator's total payments for
8
the twelve (12) m the will then be subtracted from the total charges. The
Customer-Genera r will then be billed for any balance due.
3.
4.
3.1 Th
City of Uk
qh shall not be obligated to accept or pay for and
ma
require C
'tamer-Generator to interrupt or reduce deliveries
of
available
"
ergy: (a) when necessary in order to construct,
inst
l,
maintai
l repair, replace, remove, investigate, or inspect
any
h
f its equip
r
ent or part of its system; or (b) if it determines
t
at
u
taiimen ,
interruption, or reduction is necessary because of
em
gencies, fo
rced outages, force majeure, or compliance with
pru
nt electric
practices.
3.2 VVh
ever possi
ble, the City of Ukiah shall give Customer-
Cie
raor reaso
nable notice of the possibility that interruption or
red
tion of del
eries may be required.
3.3 Not
ithstandin
any other provisions of this Agreement, if at any
tim
he City o
Ukiah determines that either (a) the facility may
end
ger the Ci
of Ukiah personnel, or (b) the continued
c
ope
tion of Cu
omer-Generator's facility may endanger the
irate
ty, of the .
'ty of Ukiah's electric system, the City of Ukiah
sisal
have the ri
t to disconnect Customer-Generator' facility
fro
he City o
Ukiah's electrical system. Customer-Generator's
Faci
ty shall rem
ain disconnected until such time as the City of
Uki
is satistie
that the condition(s) referenced in (a) or (b) of
l
this
ction 4.3
ave been corrected.
ZC 1VN EG
ON
4.1 Cust
er-Gene
for shall deliver the as-available energy to the
City
f Ukiah at
e utility's meter.
4.2 Cust
er-Gener
for shall pay for designing, installing, operating,
and r r
. aintaining
e solar-electri c generating facility in accordance
with
ll applicab
laws and regulations and shall comply with the
City
f Ukiah's
pendix A, which is attached hereto.
4.3 The
'ty of Uki
shall furnish and install standard watt-hour
mete
. Custome
Generator shall provide and install meter sockets
4.4 Cust
er-Gener
or shall not commence parallel operation of the
gene
ting facilit
until written approval of the interconnection
facili
s! has beer i
given by the City of Ukiah. Such approval shall
not b
unreasona
y withheld. The City of Ukiah shall have the
right
4
have repr
entatives present at the initial testing of
Cust
er-General
is protective apparatus.
:,4;~, :I n
5. MAINTENANQ r, AND PE .."MITS
Customer-Genera or shall: (a)!' maintain the solar-electric generating facility and
interconnection fa ilties in a afe and prudent manner and in conformance with
all applicable law and regula 'ons including, but not limited to, the City of
Ukiah's Appendix A, and (b) obtain any governmental authorizations and permits
required for the c struction and operation of the solar-electric generating facility
and interconnectio facilities. ustomer-Generator shall reimburse the City of
Ukiah for any and 11 losses, damages, claims, penalties, or liability it incurs as a
result of Customs Generator' failure to obtain or maintain any governmental
authorization and ermits required for construction and operation of Customer-
Generator's genet ing fecilit . The City of Ukiah will have the right to inspect
and test the autom tie disconnect circuit on periodic basis to insure proper
operation defined ' Appendix A.
6. ACCESS T®_lYIISES
The City of Ukiah
ay enter Customer-Generator's premises: (a) to inspect at all
reasonable hours
stomer-G
stator's protective devices and read or test meter;
and (b) to disconn
t, without
' otice, the interconnection facilities if, in the City
s
of Ukiah's opinion
ahazardou
s
condition exists and such immediate action is
necessary to prote
person's,
the City of Ukiah's facilities, or property of
others from damag
or interfer
ence caused by Customer-Generator's solar-electric
facilities, or lack o
properly o
Berating protective devices.
7. INDEMNITY AN,
D LI II,
Y
7.1 The
ustomer-
enerator shall protect and defend the City against
any
laim for m
oney made against the City, if the claim is based on
any
ct: or omiss
on of the Customer-Generator in performing
and
this Agre
tnent, regardless of whether the act or omission
invo
es alleged
negligent or intentionally wrongful conduct, or
if th
claim resu
s from the engineering, design, construction,
mai
eriance, re
ir, improvement, replacement, operation,
sups
ision, test
g or ownership of the Customer-Generator's
facil
y.' Collectiv
ely, these activities will be referred to in this
Agr
meat as "
eration of the facility". The Customer-Generator
will
rotect the
ty and its officers, agents, employees, and
cont
etors. This
obligation applies to the acts or omissions of the
Cust
mer-Gener
tor's officers, agents, employees, contractors, and
volu
eers.
In additi
ri the Customer-Generator shall pay any loss of
expe
e incurre
y the City caused by the operation of the
Cust
er-Gener
or's facility.
Under its 1
9bligation to defend the City, the Customer-
Gene r
for shall
vide at its expense such attorneys, investigators,
cons
twits, exp
s or other professionals as may be necessary to
defe
any such
aim or demand and shall pay all expenses
Fags of 8
ass
iated-wit
~uch defense, including any expenses incurred by
the
ity to assi
or participate in such defense, If Customer-
Ge
rator fails
to provide *competent representation when
nee
sary to pr
went any prejudice to the City's interests, the City
ma
retain such
services and incur such expenses as may be
rea
nably pru
nt to protect its interest and Customer-Generator
sha
pay any su
ch expenses incurred by the City within 30 days of
the
are the Cit
; provides the Custom-er-Generator with written
not
e of the ex
ense and a demand for payment.
In agree
' g to indemnify City under this paragraph 8. 1, the
Cu
mer-Gen
ator shall pay any settlement or judgment resulting
fro
a'claim, d
and, and cause of action or suit covered by this
par
aph. The
ustomer-Generator will not be required to protect
the
ity against
claim that is based on the sole active negligence
oft
City or it
~
4
o
fficers, agents, employees, or contractors (other
4
7.2
7.3
7.4
7.5
The Cit
*will provide this same protection to the Customer-
Gen
rator for a
claim based on the operation of the City's
faci
ties, or the
sole and active negligence of the City or its
offs
rs, agents,
employees or contractors (other than the
Cus
mer-Gene
tor) in operating its facilities.
This ind
; (cation and hold harmless provision of this
Agr
rent shat
remain in effect, even if the Agreement is
othe
r se termi
ted or fully performed.
Not,
ithstandin
the indemnity of Section 8. 1, and except for a
Part
'siiwillful
'sconduct or sole negligence, each Party shall be
resp
sible for
wages to its facilities resulting from electrical
ds
bances or
alts.
The
rovisions o
f this Section 8 shall not be construed to relieve
any
surer of it
obligations to pay any insurance claims in
acco
rdance with
he provisions of any valid insurance policy.
Exc
t as othe
,'se provided in Section 8. 1, neither Party shall be
liabl
to the oth
Party for consequential damages incurred by that
Part
!t' C
tomes-Ge
rator fails to comply with the insurance
prov
ions of thi
s Agreement, if any, Customer-Generator shall, at
its o
in ,cost, de
nd, save harmless and indemnify the City of
Uki
, its direct
3rs, officers, employees, agents, assignees, and
1
succ
sons in int
zest from and against any kind or nature
(incl
ing attoi
ey's fee and other costs of litigation) resulting
form
he death o
injury to any person or damage to any property,
incl
ing the Pei
"onnel property of the City of Ukiah, to the extent
that
e City of
iah would have been protected had Customer-
Gen
ator comp
'-1d with all such insurance provisions. The
incuu
'on of this
ection 8.5 is not intended to create any express
or,i
lied right
Customer-Generator to elect not to provide any
such
auired
1
1rance.
r~ ,t3 of
c;
a,
& INSU CE
8.1 To
8.2
8.3
9.
extent
ins
ance in foi
am
nts than tl
hav,
the right b
poli
ies of insu:
Cus
er-Gene
Ap
radix A, hz
Sec
on 9:-1 and
liab
ity insuran
Suc
insurance,
poli
or polici(
noti
to the uti
This Agreement
the State of Calm
of California.
10,
Any amendment c
to by both Parties.
performance of an
time to enforce thi
covenant containe
deemed to be conE
waiver of the Brea
writing.
a 8. tor)
as if
it Customer-Generator has currently in force all
prance and comprehensive personal liability
mer-Generator agrees that it will maintain such
e for the duration of this Agreement in no less
bse currently in effect. The City of Ukiah shall
inspect or obtain a copy of the original policy or
nce prior to commencing operation.
ator shall meet the standards and rules set forth in
re the appropriate liability insurance required in
;hall not be required to purchase any additional
e.
equired in Section 9.1 shall, by endorsement to the
provide for thirty (30) calendar days written
ty prior to cancellation, termination, alteration, or
)f such insurance.
governed, and construed under the laws of
and to be performed wholly within the State
W
nodificati '
s to the Agreement shall be in writing and agreed
ae failure
any Party at any time or times to require
)rovision H
ereof shall in no manner affect the right at a later
G
ime. No w
iver by any party of the breach of any term of
n this Agr
Oment, Whether by conduct or otherwise, shall be
ied as a fu
er or continuing waiver of any such breach or a
of any oth
term or covenant unless such waiver is in
the
ah's P
ities o
appendix, which is attached and
ovoltaic Interconnection Standards for Solar
MW or Less
''~ir~ta ~ cti
12. LOTICIES
All written not
Customer-Gen(
refer to the Pro-.
shall be directed as follows:
City of
Ukiah
Public U
tilities Department
300 S
inary Avenue
Ukiah,
California 95482
yr's notice
the City of Ukiah pursuant to this Section 13 shall
Identificati
n Number set forth in Section 1.1.
be in of ct when signed by the Customer-Generator and the
11 remai ' in effect thereafter month-to-month unless
arty on $tirty (30) days' prior written notice in accordance
F, th ?Parties hereto have caused two.originals of this
i by t I eir duly authorized representatives.
a
i
ve as Of the last date set forth below.
of Ukiah
r
%Iav 8, 20t?3
Name:
Title:_
Date:
/t',~i1~~s"rfL2
P° t r e
7 C ; ur
APPEND A
A.
B
General
This Appe dix sets fo t'h the requirements and conditions for
interconne ted non-uti~ ity owned, solar-electric generation where such
generation ay be co : ected for parallel operation with service of the
Utility. Fo purpose o his Appendix, the interconnecting entity shall be
designated ustomer- enerator.
Design R irements
1. Cus omer-Gen ator shall conform to applicable National Electric
Co (NEC) St ` dards (NEC 690) and applicable building codes.
2. Cus oer-Gene ator shall have a dedicated circuit from the
inv er to servi e panel with a circuit breaker or fuse (NEC 690-
64(3)(l)).
3. Cus suer-Gene ator's over-current device at the service panel
shal be marked to indicate photovoltaic power source (NEC 690-
64(q)(4)).
4.
a.
b.
C.
d.
"s inverter shall have the following
for parallel operation with the Utility:
Invert output shall automatically disconnect from
Utility . ounce upon loss of Utility voltage and not
reconnect until Utility voltage has been restored by the
Utility NEC 690-61).
Inverte shall automatically disconnect from the Utility
source ithin two cycles if Utility voltage fluctuates
beyond 10% plus or minus.
Inverte shall automatically disconnect from the Utility
source ithin three cycles if the Utility frequency
fluctua s one (1) cycle plus or minus.
Inverte output distortion shall meet IEEE 519 standards.