HomeMy WebLinkAboutEBA Engineering 1998-08-26; Amendment 13 1998-12-15CITY OF UKIAH
AMENDMENT NO. 13
TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES
DATED AUGUST 26, 1998
TERMS AND CONDITIONS
All terms and conditions of the Agreement for Professional Consulting Services dated
August 26, 1998; the Amendment dated December 15, 1998; the Second Amendment
dated May 5, 1999; the Third Amendment dated July 5, 2000; the Fourth Amendment
dated August 23, 2001; the Fifth Amendment dated September 23, 2002 the Sixth
Amendment dated February 27, 2003; the Seventh Amendment dated October 20, 2003;
the Eighth Amendment dated October 4, 2004; the Ninth Amendment dated
February 1, 2005; the Tenth Amendment dated April 26, 2005; the Eleventh Amendment
dated September 25, 2006; and the Twelfth Amendment dated September 12, 2007 shall
remain in force and effect except as modified by this thirteenth amendment.
AUTHORIZATION
Upon execution of this amendment, service provider is authorized to provide the service
described under the Scope of Work identified in this Amendment No. 13.
SCOPE O ADDITIONAL WORK
Work authorized by this amendment shall include that work described in the
October 15, 2008 letter proposal from EBA Engineering. A copy of said letter is included in
this thirteenth amendment.
COMPENSATION
Compensation for the performance of the additional work shall be made on a time and
expense basis at Consultant's customary fees. Expenses shall not exceed a maximum
total cost of $502,897.94.
EBA ENGINEERING
BY:
DA ON'
RCS
President
CITY OF UKIAH
BY:
I E CHAMBERS
Manager
DOE
Lo .
DATE
Amendment No. 13 to Agreement for
Professional Consulting Services
- ZVOI)VEERIM6
CIVIL & ENVIRONMENTAL ENGINEERS
October 15, 2008
Mr. Rick Seanor
RECEIVED
City of Ukiah Department of PublicWorks OCT 2 0 2008
MEDIATION SYSTEM INSTALLATION
1320 AIRPORT ROAD
UKIAH, CALIFORNIA
EBA Proposal No. 152-08
Dear Mr. Seanor;
Please find enclosed a cost estimate for implementation of the recommendations including within
EBA Engineering's (EBA) Remedial Action Plan (RAP) dated June 2007. The North Coast Regional
Water Quality Control Board (NCRWQCB) in a letter dated November 5, 2007 approved the RAP.
The following sections include a brief discussion of the scopes of work as well as a cost estimate
summary. Please refer to EBA's RAP for a more detailed description of the approved scopes.
SCOPES OF WORK
The scopes of work outlined in the RAP have been subdivided into the following seven phases as
listed below.
Phase 1: Dual Phase Extraction (DPE) / Ozone Sparge (OS) Well Installation and
Geophysical Study - Phase 1 includes the performance of a geophysical survey in an effort to
identify discrete shallow water bearing zones. Phase 1 also includes the installation of approximately
7 DPE wells and 12 OS wells. Costs under this Phase also include the preparation of bid
specification and evaluation of bid responses for the drilling portion of this Phase.
Phase 2: Bench Testing and Reporting - Phase 2 includes bench testing to evaluate the
potential effects of in-situ chemical oxidation (ISCO) using ozone. Phase 2 also includes the
preparation of a Notice of Intent (NOI) for the NCRWQCB Waste Discharge Requirement Order No.
R1-2006-0107, permit fees and public notification process.
Phase 3: Remediation System Permitting/Construction/Installation - Phase 3 includes
permitting and supervision of construction and installation of the DPE/OS remediation system. Costs
LAenv\ust\1434 Ukiah Corp Yard\Corr\Costestprofessionalservices2008.doe
825 Sonoma Avenue, Suite C Santa Rosa, California 95404 (707) 544-0784 FAX (707) 544-0866
Also in Southern California
under this Phase also include the preparation of bid specification for the remediation equipment,
electrical components and installation, and underground contractor. EBA will also evaluate bid
responses for the remediation equipment.
Phase 4: Remediation System Startup/Operations and Maintenance (O&M) - Phase 4
includes remediation system startup, regularly scheduled O&M, granular activated carbon
changeouts, and utilities.
Phase 5: System Installation Report - After completion of the system installation, EBA will
prepare a system installation report (SIR) that will document the construction of the system. This
report will be submitted to the NCRWQCB.
Phase 6: Quarterly Monitoring and Reporting - Ongoing quarterly monitoring and reporting
will be provided for four monitoring events. These reports will also be submitted to the NCRWQCB.
Phase 7: Additional Off-Site Investigation and Reporting - Phase 7 includes the installation
of four off-site monitoring wells, development, and surveying. Phase 7 also includes the preparation
of a report detailing the installation of the monitoring wells.
COST ESTIMATE SUMMARY
Cost for the completion of the scope of work as detailed above is $502,897.94.
CONCLUSIONS
Throughout this project additional new information may become available. This new information
may result in a change in the Scope of Work, which may result in a change in the cost of the project.
EBA will notify the client when there is a change in the cost and will not proceed without prior
approval of the changes from the Client. Throughout the project, EBA will make every effort to
reduce the cost of the project by eliminating unnecessary procedures and/or analytical costs.
Should you have any questions or comments regarding this cost estimate, please contact EBA at
(707) 544-0784.
Attach: Detailed Cost Estimate
Standard Schedule of Fees and Rates
LAenv\ust\1434 Ukiah Corp Yard\Corr\CostestprofmionaLwrvices2008.doe 2
1
TOTALS LABOR
BID DOCUriiENTATION PREPARATION
SUBCONTRACTORS
Utilities,
TOTAL
lerical
$45.00
Total
EBA
Hours
EBA
Task
Total
Equipment
Purchase Bid
Does
Drillling
Contractor
Bid Does
Electrical
Contractor
Bid Docs
Underground/
Compound
Construction
Bid Does
Geophysical
Study
Contractor
aboratory
arbon
Permits,
Materials &
Mise_
Costs
ESTIMATED
COSTS
148
$ 12,662.00
$ 3,500.00
$ 18,285.00
$ 2,783.00
$ 12,829.50
$ 50,059.50
10
82
$ 7,290.00
$ 23 253.00
$ 30 543.00
404
$ 36 694.00
$ 5,000.00
$ 4,500.00
$ 20 000.00
$ 23 274.00
$ 31205.46
$ 120 673.46
542
$ 44 460.00
$37,583.38
$ 19 837.50
$111593.00
$ 213 473.88
2
46
$ 3,998.00
$ 3,998.00
8
320
$ 27 528.00
$36,541.70
$ 1966.40
$ 66 036.10
2
158
$ 13 750.00
$ 4,364.00
$ 18114.00
22
2,700
$146,382.00
1$ 5,000.00
$ 3,500.00
$ 4 500.00
$ 20,000.00
$ 18,285.00
$76,908.08
$ 43,111.50
$185,211.36
$ 502,897.94
l I E
CI vIL & EA(VIRONMEMAL ENGINEERS
STANDARD SCHEDULE F ES AND TES
Chief Geologist/Principal Engineer
Senior Geologist/Senior Engineer
Project Geologist/Project Engineer
Project Manager
Staff Geologist/Staff Engineer
Survey: 3 Man Crew
Survey: 2 Man Crew
Survey: 1 Man Crew
Senior Environmental Scientist/Specialist...........
Environmental Scientist/Specialist
Design Draftsperson
Word Processing
Administrative
Systems Manager
Depositions or court proceedings
Subconsultants
Prints and materials
Miscellaneous expenses
..............................$145.00 per hour
..............................$105.00 - $125.00 per hour
85.00 - $120.00 per hour
95.00 - $125.00 per hour
75.00 - $ 95.00 per hour
..............................$195.00 per hour
..............................$175.00 per hour
..............................$145.00 per hour
75.00 - $105.00 per hour
60.00 - $ 95.00 per hour
75.00 - $ 90.00 per hour
45.00 per hour
60.00 per hour
65.00 per hour
...........................200% of usual rates
. .............................Cost plus 15%
. .............................Cost plus 15%
. .............................Cost plus 15%
Effective March 2008
LArnastersVbrms\rates\-ee Schedule Mar 2008.doc
825 Sonoma Avenue, Suite C Santa Rosa, California 95404 (707) 544-0784 FAX (707) 544-0866
Also in Southern California