HomeMy WebLinkAboutGreen Valley Consulting Engineers 2008-10-15October 15, 2008 Ms. Liz Ellis Green Valley Consulting Engineers 335 TESCONI CIR SANTA ROSA CA 95401-4617 RE: Amendment No. 1 to Agreement for Professional Consulting Services (Additional Services Associated with Water Main Improvements at Gobbi and State Streets) Dear Ms. Ellis: Enclosed please find a fully executed original of the subject amendment for your file. By this letter you are authorized to proceed with the work identified in this amendment. Thank you for your assistance with this project. Please do not hesitate to contact me at (707) 463-6296 if you have further questions. Sincerely, Richard J. Seanor Deputy Director of Public Works enc. cc: Linda Brown, City Clerk w/duplicate original Ann Burck, Interim Water and Sewer Operations Superintendent w/enc file 300 SEMINARY AVENUE UKIAH, CA 95482-5400 Phone# 707/463-6200 Fax# 707/463-6204 Web Address: www.cityofukiah.com CITY OF UKIAH AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED NOVEMBER 2, 2007 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated November 2, 2007 shall remain in force and effect except as modified by this first amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 1. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described. in the May 5, 2008 letter proposal from Green Valley Consulting Engineers. A copy of said letter is included in this first amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $6,975. GREEN VALLEY CONSULTING ENGINEERS BY: a Ce > ELIZABETH ELLIS Principal CITY OF KIAH BY: rit N E CHAMBERS y Manager DATE DATE Amendment No. 1 to Agreement for Professional Consulting Services J f rr May 5, 2008 Mr. Rick Seanor, P.E. Deputy Director of Public Works City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 RECEIVED SEP 1 2 2008 CITY OF UKIAH DEPT. OF PUBLIC WORKS municipal engineering civil engineering landscape architecture land surveying Re: Additional Services Associated with Water Main Improvements at Gobbi and State Streets Dear Rick: Per your request of April 14, 2008, we have enclosed a brief scope of services and associated fee for the changes associated with the modifications to the original water main project that we have been working on. Our Understanding We understand that due to budget constraints it is necessary to modify the City's original scope and direction of designing and advertising water main replacement work at four (4) separate locations - to be advertised at once under one contract. At this time, each of the four locations will be designed and packaged as individual projects to be advertised as budget allows. The City will proceed with a modified scope of work at the Gobbi Street location - to be advertised in 2008. The remaining three locations will be advertised at a later date. Project specifications are to address only the Gobbi Street location at this time. Modifications to the Gobbi Street location will include the deletion of the original 8" main replacement between South Oak Street and State Street and instead extending the replacement of the 12" water main in State Street by an additional 210 feet south from the original termination point, which will take it to the joint utility point on the west side of State Street. City forces will install a 12" gate valve in the existing 12" main as detailed in the aforementioned letter. City forces will also install an 8" gate valve near the east end of Gobbi Street. We will be responsible for the design of an offset to make the connection from the new 12" main to the existing 8" AC main in West Gobbi Street. Topographic Mapping We need to extend the original topographic mapping that was obtained to pick up the limits of the additional work on State Street. We will pick up surface features and any underground utilities that are apparent. Prior to field surveys, we will mark for USA to assist in identifying underground utilities that may be in conflict. Mapping will include the project area covering a sufficient distance beyond the proposed improvements to properly design the project. Deliverables: Hard Copy of Topographic Survey Data and Mapping and Diskette in AutoCAD 82006 Rick Seanor, P.E. May 5, 2008 g_ 2 75% Design and Improvement Plans The 75% design documents will have enough detail to allow the City's Public Works Department to review our approach to the revised project scope. The plan and profile sheets will indicate existing right-of-way lines and any pertinent easements, topographic features, and existing utility systems. It is expected that there will only be 1 improvement plan and profile sheet for the new work. Project specifications will be completed for the Gobbi Street intersection to be used for subsequent advertising. 100% Design and Improvement Plans A 100% submittal of the plans will incorporate all comments from the 75% review, as well as results of utility company reviews of the plans. Final horizontal and vertical alignment, any lateral and services connections, and details will be included. Construction documents will be prepared in accordance with the City of Ukiah Design and Construction Standards. Fee for Additional Services $6,975 Thank you again for the opportunity to submit a proposal for our services. Should you accept our proposed scope of services and associated fee, Green Valley can begin work upon authorization to proceed. We look forward to hearing from you and please do not hesitate to contact us with any questions you may have. Sincerely, Liz Ellis, P.E Principal