Loading...
HomeMy WebLinkAboutGreen Valley Consulting Engineers 2007-11-02; Amendment 1 2008-10-15October 15, 2008 Ms. Liz Ellis Green Valley Consulting Engineers 335 TESCONI CIR SANTA ROSA CA 95401-4617 RE: Amendment No. 2 to Agreement for Professional Consulting Services (Additional Services Associated with Pavement Reconstruction Improvements at Gobbi Street) Dear Ms. Ellis: Enclosed please find a fully executed original of the subject amendment for your file. By this letter you are authorized to proceed with the work identified in this amendment. Thank you for your assistance with this project. Please do not hesitate to contact me at (707) 463-6296 if you have further questions. Sincerely, kkal4~~~ Richard J. Seanor Deputy Director of Public Works enc. cc: Linda Brown, City Clerk w/duplicate original file i 300 SEMINARY AVENUE UKIAH, CA 95482-5400 Phone# 707/463-6200 Fax# 707/463-6204 Web Address: www.cityofukiah.com CITY OF UKIAH AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES DATED NOVEMBER 2, 2007 TERMS AND CONDITIONS All terms and conditions of the Agreement for Professional Consulting Services dated November 2, 2007; and the first amendment dated October 7, 2008; shall remain in force and effect except as modified by this second amendment. AUTHORIZATION Upon execution of this amendment, service provider is authorized to provide the service described under the Scope of Additional Work identified in this Amendment No. 2. SCOPE OF ADDITIONAL WORK Work authorized by this amendment shall include that work described in the September 1, 2008 letter proposal from Green Valley Consulting Engineers. A copy of said letter is included in this second amendment. COMPENSATION Compensation for the performance of the additional work shall be made on a time and expense basis at Consultant's customary fees. Expenses shall not exceed a maximum total cost of $9,550. GREEN VALLEY CONSULTING ENGINEERS BY: ELIZA H LLIS Principa CITY OF UKIAH m BY: CHAMBERS City Manager 1 DATE /V ec~ DATE Amendment No. 2 to Agreement for Professional Consulting Services September 1, 2008 Mr. Rick Seanor, P.E. Deputy Director of Public Works City of Ukiah 300 Seminary Avenue Ukiah, CA 95482 RECEIVED SEP 1 2 2008 CITY OF UKIAH DEPT. OF PUBLIC WORKS municipal engineering civil engineering landscape architecture land surveying Re: Additional Services Associated with Pavement Reconstruction Improvements at Gobbi Street - Amendment #2 Dear Rick: Per your request and previous phone conversations, we have enclosed a brief scope of services and associated fee for the addition of pavement reconstruction to the Gobbi Street Water Main Improvements and for work associated with the southwest corner of Gobbi and State Streets to increase the curb return radii and allow for a right turn pocket. Our Understanding We understand that the City would like to add an asphalt reconstruction component to the water main improvement project on Gobbi Street from the limits of Main Street west thru the intersection of State Street. At this time, the method is proposed to be a "grind and overlay". The work proposed is outside our existing scope of services and will require additional topographic mapping, preparation of mapping, coordination with the water main project and design of the pavement reconstruction, including raising existing utility boxes, etc. to grade. In addition, the City would like to increase the radius of the SW curb return at Gobbi and State Streets to facilitate truck traffic making right turns and add a dedicated right turn lane with a stacking length as feasible with the physical constraints of the corner. It is also our understanding that the additional work will be advertised with the water main improvements under the same contract. We have briefly summarized the additional scope of services and associated fee below. Topographic Mapping We will need to extend the original topographic mapping that was obtained to pick up the limits of the proposed pavement reconstruction work on Gobbi Street. We will pick up surface features and any underground utilities that are apparent and cross-section the existing road at 50' sections. Prior to field surveys, we will mark for USA to assist in identifying underground utilities that may be in conflict. Mapping will include the project area covering a sufficient distance beyond the proposed improvements to properly design the project. Deliverables: Hard Copy of Topographic Survey Data and Mapping and Diskette in AutoCAD 82006 335 Tesconi Circle, Santa Rosa, California 95401 m web www.gvalley.com - tel 707.579.0388 -flax 707.579.3877 Rick Seanor, P.E. September 1, 2008 e1 75% Design and Improvement Plans The 75% design documents will include the structural section details, horizontal limits proposed for the curb return, turn lane and the pavement reconstruction improvements, and the vertical profile of improvements. The plan and profile sheets will indicate existing right-of-way lines and any pertinent easements, topographic features, and existing utility systems. It is expected that there will two additional sheets required for the new work, including a plan and profile and striping and signing/detail sheet. Previous project specifications that were submitted for the water main improvements will be amended for the additional pavement and concrete work to allow for subsequent advertising. An updated cost estimate will also be submitted to allow for budgeting purposes. 100% Design and Improvement Plans A 100% submittal of the plans will incorporate all comments from the 75% review, as well as results of utility company reviews of the plans. Final vertical profile, cross-sections, and any miscellaneous details will be included. Construction documents will be prepared in accordance with the City of Ukiah Design and Construction Standards. The final cost estimate will updated to incorporate current bid results. Fee for Additional Services $9,550 Thank you again for the opportunity to submit a proposal for our services. Should you accept our proposed scope of services and associated fee, Green Valley can begin work upon authorization to proceed. We look forward to hearing from you and please do not hesitate to contact us with any questions you may have. Sincerely, Liz Ellis, P.E. Principal